Berkeley Hills Tunnel

Rapid transit tunnel in California, US From Wikipedia, the free encyclopedia

The Berkeley Hills Tunnel is a tunnel which carries Bay Area Rapid Transit (BART) Yellow Line through the Berkeley Hills between Rockridge station and Orinda station.

OthernameCaldecott BART Tunnel
CoordinatesOakland portal:
37°51′05″N 122°14′17″W
Orinda portal:
37°52′29″N 122°11′16″W
Quick facts Overview, Other name ...
Berkeley Hills Tunnel
An angular concrete structure
East portal structure of the Berkeley Hills Tunnel
Interactive map of Berkeley Hills Tunnel
Overview
Other nameCaldecott BART Tunnel
Line Yellow Line
LocationAlameda County, California
CoordinatesOakland portal:
37°51′05″N 122°14′17″W
Orinda portal:
37°52′29″N 122°11′16″W
SystemBay Area Rapid Transit
CrossesBerkeley Hills, Hayward Fault
StartRockridge Station, Oakland
EndOrinda Station, Orinda
No. of stationsNone
Operation
Work began1965
Constructeddrill-and-blast
OpenedMay 21, 1973; 53 years ago (1973-05-21)
OwnerSan Francisco Bay Area Rapid Transit District
OperatorSan Francisco Bay Area Rapid Transit District
CharacterRapid transit
Technical
Line length3.1 mi (5.0 km)
No. of tracks2
Track gauge5 ft 6 in (1,676 mm)
(Indian gauge)
ElectrifiedThird rail, 1000 V DC
Tunnel clearance16.8 feet (5.1 m)[1]
Grade1.2% (2% max)[2][3]
Close

Design

While the tracks run in the median of California State Route 24 on both sides of the tunnel, the Berkeley Hills Tunnel allows the tracks to take a straighter alignment offset to the north of the Caldecott Tunnel.[citation needed]

The tunnel bores through the Berkeley Hills east of Berkeley and Oakland a distance of 3.1 miles (5.0 km)[3] through a variety of rock strata, most of which are soft and porous. The earthquake-active Hayward Fault bisects the tunnel about 900 feet (270 m) inside the west portal (Oakland side). There are 2 bores, each 17.5 feet (5.3 m) in diameter,[3] spaced 50 feet (15 m) apart. Pedestrian cross-tunnels are spaced every 1,000 feet (300 m) for emergency evacuation in case of fire, etc. There is a ventilation structure at the east portal with roll-down doors that can close off the tunnel end to allow air to be sucked out or blown in.

By 2017, cumulative minor damage from fault creep had significantly reduced the tunnel's cross section, to the point where BART determined it was necessary to plan for repair and mitigation against future creep.[4] The work, which includes excavating the tunnel walls and realigning the tracks, is expected to cost $60 million.[5]

Construction

Construction of the tunnel began in early February, 1965. The bores were holed through by March, 1967, and construction completed in July, 1968.[6] The tunnel was opened for revenue service on May 21, 1973, with the Concord line.[7]

Material removed in the construction of the tunnel was used as fill for a concurrent expansion of the Port of Oakland.[8]

Incidents

On December 4, 2013, a BART train suffered mechanical braking problems and made an emergency stop in the tunnel near Rockridge station. Eleven people were treated for smoke inhalation.[9]