Big Fill

From Wikipedia, the free encyclopedia

CommencedFebruary 1869 (1869-02)
Opened1870 (1870)
Completed26 April 1869 (1869-04-26)
ClosedSeptember 1942 (1942-09)
Big Fill
Central Pacific Big Fill; one of the embankments built for the Union Pacific's Big Trestle is visible on the left side of this photograph, taken from the north end of the Big Fill, directed south.
History
CommencedFebruary 1869 (1869-02)
Opened1870 (1870)
Completed26 April 1869 (1869-04-26)
ClosedSeptember 1942 (1942-09)
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The Big Fill was an engineering project on the first transcontinental railroad in the U.S. state of Utah. To avoid a costly 800-foot (240 m) tunnel through mountainous terrain east of Promontory Summit, Central Pacific engineers mapped an alternate route that still needed to span the deep Spring Creek Ravine.

Big Trestle

References

Related Articles

Wikiwand AI