Bolobedu Solar Power Station

From Wikipedia, the free encyclopedia

Coordinates23°36′58″S 30°20′32″E / 23.61611°S 30.34222°E / -23.61611; 30.34222
StatusProposed
Bolobedu Solar Power Station
CountrySouth Africa
LocationBolobedu, Greater Letaba Municipality, Mopani District, Limpopo
Coordinates23°36′58″S 30°20′32″E / 23.61611°S 30.34222°E / -23.61611; 30.34222
StatusProposed
Construction began2023 (expected)
Commission date2024 (expected)
OwnerBolobedu Solar Consortium
OperatorVoltalia of France
Solar farm
TypeFlat-panel PV
Power generation
Nameplate capacity149 MW (200,000 hp)
Annual net output300 GWh

The Bolobedu Solar Power Station is an 148 MW solar power plant planned in South Africa. The solar farm is owned and under development by a consortium led by Voltalia, the French multinational independent power producer (IPP) and Black South African shareholders, including a community trust. The off-taker of the power generated here is Richards Bay Minerals (RBM), a South African mining company owned by the Anglo-Australian mining conglomerate, Rio Tinto. The power will be conveyed from the solar farm to the customer's mine using the transmission lines of Eskom, the national electricity parastatal company, as is permissible under South African law.[1][2]

The power station would be located in the community of Bolobedu, in Greater Letaba Municipality, Mopani District, in the Limpopo Province of South Africa.[1][2] Bolobedu is located approximately 120 kilometres (75 mi) north-east of Polokwane, the capital city of Limpopo Province.[3]

Overview

The design calls for a ground-mounted photovoltaic solar panel power station with generation capacity of 148 MW. It is calculated that the solar farm will generate 300 GWh of electricity on an annual basis. Voltalia has committed in writing to supply that energy to RBM for use in its mines and related facilities in Limpopo Province. A long-term power purchase agreement (PPA), was signed to that effect in October 2022. Eskom's electricity transmission network will be used to deliver the power from the solar farm to the customer premises.[1][2]

Developers

The table below illustrates the composition of the consortium that owns and is developing this renewable energy infrastructure development. For descriptive purposes, the SPV will be called "Bolobedu Solar Consortium".[1][2]

Bolobedu Solar Consortium shareholding
RankShareholderDomicilePercentageNotes
1VoltaliaFrance
44.0
[1][2]
2Black Women Enterprise(s)South Africa
10.0
[1][2]
3Black Enterprise(s)South Africa
41.0
[1][2]
3Bolobedu Community TrustSouth Africa
5.0
[1][2]
Total
100.00

Construction

Construction began in January 2023, with commercial commissioning expected in 2024.[4]

Other considerations

This development is expected to generate approximately 700 construction jobs and 53 permanent positions during the operations phase.[1][2] Construction is expected to start in 2023, with commercial commissioning expected in 2024.[5]

See also

References

Related Articles