Bowen Developmental Road

From Wikipedia, the free encyclopedia

TypeRural road
Length259 km (161 mi)[1]
Route number(s) State Route 77
Bowen Developmental Road

Bowen Developmental Road (green on black)
General information
TypeRural road
Length259 km (161 mi)[1]
Built byDepartment of Transport and Main Roads
Route number(s) State Route 77
Major junctions
Northeast end Bruce Highway (State Highway A1, Bowen
 
Southwest end Gregory Highway (State Highway A7), Belyando
Location(s)
Major settlementsCollinsville

Bowen Developmental Road is a state-controlled district road (numbers 88A and 88B) rated as a local road of regional significance (LRRS).[2][3] It is a rural strategic main road[4] in Queensland, Australia.[5] It is part of State Route 77, and functions as a highway. It has a length of 259 kilometres (161 mi) and extends in northeast-southwest direction from Bowen on the east coast of Australia to the Gregory Developmental Road in Belyando near Nairana National Park.[1]

In its course, the road crosses the Clark Range and Leichhardt Range. Until the station Whynot it is paved. The last 70 kilometres (43 mi) were dirt road but some further sealing was done in 2021.[1]

The highest point in the course of the highway is at 394 metres (1,293 ft), the lowest at 8 metres (26 ft).[6]

State Route 77 departs from the Bruce Highway in a southerly direction, just west of Bowen. From there to Collinsville it is signed as Peter Delamothe Road. From Collinsville onwards the road is signed as Bowen Developmental Road. The road generally follows the route of the railway line to a point south of Collinsville, where the railway continues south to coal mines and the road turns south-west, passing through the locality of Mount Coolon, where the Suttor Developmental Road branches off to the south. From here the road continues south-west until it meets the Gregory Developmental Road in the locality of Belyando.[1]

Northern Australia Roads Program upgrade

The Northern Australia Roads Program announced in 2016 included the following project for the Bowen Developmental Road.

Road sealing

The project for progressive sealing and minor drainage improvements was completed in early 2021 at a total cost of $28.8 million.[7]

Other upgrades

Paving and sealing

A project to pave and seal a further section of the road, at a cost of $15 million, was completed in late 2021.[8]

Major intersections

Sources

References