Bright Stalk Wind Farm
From Wikipedia, the free encyclopedia
CountryUSA
LocationChenoa, Illinois
StatusActive
| Bright Stalk Wind Farm | |
|---|---|
![]() | |
| Country | USA |
| Location | Chenoa, Illinois |
| Coordinates | 40°40′45.9″N 88°40′53.5″W / 40.679417°N 88.681528°W |
| Status | Active |
| Owner | EDP Renewables North America |
| Wind farm | |
| Type | Onshore |
| Power generation | |
| Units operational | 57 x 3.6 MW |
| Make and model | Vestas V136 |
| Storage capacity | 205 MW |
| External links | |
| Website | https://www.edpr.com/north-america/bright-stalk-wind-farm |
The Bright Stalk Wind Farm is a 57-turbine wind farm near Chenoa in northeastern McLean County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 205 megawatts of electricity.[1] The complex was completed in 2019 by EDP Renewables North America at a cost of more than $300 million, and entered operations in 2020.[2]
