Wikiwand AI

CPTM Series 9500

Class of electric multiple units From Wikipedia, the free encyclopedia

The CPTM Series 9500 is a class of electric multiple units part of the São Paulo Metropolitan Trains rolling stock, built by Hyundai Rotem from 2017 to 2019.[2]

In service2017–present
ManufacturerHyundai Rotem
Constructed2017–2019
Quick facts Series 9500, In service ...
Series 9500
A Series 9504 train on Luz station
In service2017–present
ManufacturerHyundai Rotem
Built atAraraquara, São Paulo
Constructed2017–2019
Entered service16 June 2017
Number built30
Number in service30
Formation8-car sets (MC–R1–R2–M+M–R2–R1–MC)
Fleet numbers9501/9502–9619/9620
Capacity2,600
OperatorTIC Trens
Depots
  • Jundiaí Yard
  • Francisco Morato Train Park
  • Lapa Yard
Line served
Specifications
Train length170 m (557 ft 9 in)
Height4,545 mm (14 ft 10.9 in)
Floor height1,335 mm (4 ft 4.6 in)
EntryStep
Doors8 sets of side doors per car
Wheel diameter915 mm (36.0 in)
Wheelbase2,400 mm (7 ft 10 in)
Maximum speed90 km/h (56 mph)
Weight179,000 kg (395,000 lb)
Traction systemHyundai Rotem RVS10001DQ0 IGBT–VVVF
Traction motors16 × Hyundai Rotem HRTM-IFS-270A 270 kW (360 hp) asynchronous 3-phase AC
Power output4,320 kW (5,790 hp)
Acceleration0.9 m/s2 (3.0 ft/s2)
Deceleration
  • 1.1 m/s2 (3.6 ft/s2) (service)
  • 1.2 m/s2 (3.9 ft/s2) (emergency)
HVACAir conditioning
Electric systems3 kV DC overhead line
Current collectionPantograph
UIC classificationBo′Bo′+2′2′+2′2′+Bo′Bo′+Bo′Bo′+2′2′+2′2′+Bo′Bo′
Coupling systemDellner
Track gauge1,600 mm (5 ft 3 in)
Notes/references
Sourced from [1] except where noted.
Close

History

In July 2013, a consortium composed by Brazilian company IEASA and Korean Hyundai Rotem won a bid to build 30 trains with 8 cars each to CPTM. The project cost R$789 million (US$365.9 million) and the trains were to be built within 36 months.[3][4]

With a deadline of July 2016, the first trains were only delivered in January and after a long delay, Hyudai Rotem needed to change plans. This is because their Brazilian partner IESA had to leave the consortium due to bankruptcy. IESA was the one that would assemble the trains in Brazil for the Korean company. After that, the delivery of 22 trains was delayed.[5]

With the departure of IESA, Rotem decided to build their own factory in Araraquara to produce the EMUs. In March 2016, the company invested R$100 million (US$28.6 million) on the opening of its first factory in Latin America, which is now its second largest in the world.[6][7] The first trains had to be assembled in Asia and finished in CKD process in the new factory.[8] At that moment, a Hyundai Rotem representative stated to press that "[they] don't know how many trains were built at the moment, but [they] are certain that at least one was delivered and is already in tests by CPTM".[9]

After long tests for homologation and certification of the model, in June 2017, the company could operate the first Series 9500 train.[10] From that, the company negotiated a new deadline and began delivering the compositions on time.[11] The last train was delivered by Rotem on 25 February 2019, with the factory going into recess due to lack of new orders.[12]

The 34-month delay for the delivery made CPTM fine Hyundai Rotem R$4.27 million (US$1.22 million).[13] To decrease the delay on deliveries, Rotem also disrespected labour laws and, after a lawsuit filed by the Labour Public Prosecutor's Office (MPT), they were found guilty by the Labour Justice with a R$1 million (US$ 253,517.56) fine.[14][15] After a conciliation agreement between MPT and Rotem, the fine was reduced to R$400,000 (US$ 101,407.02).[16]

Later, Rotem lost a bidding process for the supply of 62 passenger cars for Vale S.A. The mining company chose Chinese CRRC Qingdao Sifang, bringing protests from the president of the Brazilian Association of Rail Industry (Abifer) and speculations in the press about how much the failures and delays in deliveries on Series 9500 trains weighed on Vale's choice.[17]

Operation

Three compositions operated on Line 13-Jade, but currently all of them operate on Line 7-Ruby.[18][19][20]

Accidents and incidents

  • 17 December 2018 – A train derailed during a maneuver on Lapa Yard. No one was harmed.[21]

See also

References

Related Articles

Timelines

Top Qs

Fact Checks