Photovoltaic power plant in California, US From Wikipedia, the free encyclopedia

The California Valley Solar Ranch (CVSR) is a 250 megawatt (MWAC) photovoltaic power plant in the Carrizo Plain, northeast of California Valley. The project is owned by NRG Energy, and SunPower is the EPC contractor and technology provider. The project constructed on 1,966 acres (796 ha) of a 4,365-acre (1,766 ha) site of former grazing land.[3] It is utilizing high-efficiency, crystalline PV panels designed and manufactured by SunPower. The project includes up to 88,000 SunPower solar tracking devices to hold PV panels that track the sun across the sky.

CountryUnited States
LocationCarrizo Plain, northeast of California Valley, CA
Coordinates35°19′48″N 119°54′36″W
StatusOperational
Quick facts Country, Location ...
California Valley Solar Ranch
California Valley Solar Ranch solar panels
CountryUnited States
LocationCarrizo Plain, northeast of California Valley, CA
Coordinates35°19′48″N 119°54′36″W
StatusOperational
Construction began2011
Commission dateOctober 2013
Construction cost$1.6 billion (2015)[1]
($2.06 billion in 2024 dollars[2])
OwnerNRG Solar
OperatorSunPower
Solar farm
TypeFlat-panel PV
Site area1,966 acres (796 ha)
Power generation
Nameplate capacity250 MWAC
Capacity factor30.8% (average 2014-2017)
Annual net output675 GW·h, 340 MW·h/acre
External links
Websitewww.californiavalleysolarranch.com
CommonsRelated media on Commons
Close

Project overview

The project began construction in 2011, and began operation in 2012 with 22 MW completed. It was fully completed in October 2013.[4] At the time it was completed, "the California Valley Solar Ranch will power about 100,000 homes and will be one of the largest photovoltaic (PV) solar power plants in the world".[5]

The project is being constructed on 1,966 acres (796 ha) of a 4,365-acre (1,766 ha) site of former grazing land.[3] It is utilizing high-efficiency, crystalline PV panels designed and manufactured by SunPower. The project includes up to 88,000 SunPower solar tracking devices to hold PV panels that track the sun across the sky. The project delivers approximately 550 gigawatt-hours (GW·h) annually of renewable energy and has a capacity of 250 MW.[6] While the plant only has a capacity factor of 25%, its power is generated during the middle of the day, when demand for electricity — and price — is much higher than at night.

Power purchase agreement

On August 14, 2008, Pacific Gas and Electric announced an agreement to buy all the power from the power plant.[7] A Conditional Use Permit application for the project was filed with the County of San Luis Obispo Planning and Building Department on January 14, 2009. On November 30, 2010, NRG Energy announced that it would buy CVSR from SunPower for "up to $450 million".[8] In September 2011, the Department of Energy (DOE) offered NRG Solar a $1.237 billion loan from the federal government to cover most of the construction cost.[9] The total cost of the project is estimated to be $1.6 billion.[10]

Panoramic view of construction, October 2012

Environment

The Carrizo Plain is home to 13 species listed as endangered either by the state or federal government, including the San Joaquin kit fox, giant kangaroo rat, and the California condor.[11] SunPower worked with the community to protect local wildlife habitat and migration patterns, and reduced the amount of traffic in the area during construction.[12] In 2012, it was reported that SunPower and First Solar had designed a plan to create a 19,000 acre reserve for the giant kangaroo rat, San Joaquin kit fox and golden eagle in order to address concerns about habitat destruction.[13]

Electricity production

More information Year, Jan ...
Generation (MW·h) of California Valley Solar Ranch[14]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
2012 4,0144,1905,5048,019 21,727
2013 15,82420,63124,30428,13310,53325,45931,13151,64663,07356,74737,30034,583 399,364
2014 35,85136,71054,65466,21078,96784,02477,52674,39860,78950,93936,70127,634 684,403
2015 36,08743,20860,17567,92070,49277,66575,70575,69560,53648,79640,42131,553 688,253
2016 27,06448,48558,57163,31771,27580,54582,60974,31063,25944,72037,63328,008 679,796
2017 25,68528,68953,62957,22272,97279,04271,97866,59062,05257,16835,33737,178 647,541
Average annual production (2014–2017)675,000
Close

Incidents

A fire removed 84% of the generating capacity from service in June 2019 when poles and cables were damaged by an "avian incident."[15] Full service was expected to be restored within a month.[16]