Canton Center station

Rail station in Canton, Massachusetts, US From Wikipedia, the free encyclopedia

Canton Center station is an MBTA Commuter Rail station in Canton, Massachusetts. It serves the Providence/Stoughton Line, including most Stoughton Branch service except for evening inbound trains. The station has 1 side platform on the south side of the track west of Washington Street; the platform has a mini-high section for accessibility.

Location710 Washington Street
Canton, Massachusetts
Coordinates42.1571°N 71.1463°W / 42.1571; -71.1463
Platforms1 side platform
Quick facts General information, Location ...
Canton Center
Canton Center station in April 2016
General information
Location710 Washington Street
Canton, Massachusetts
Coordinates42.1571°N 71.1463°W / 42.1571; -71.1463
LineStoughton Branch
Platforms1 side platform
Tracks1
Connections MBTA bus: 716
Construction
Parking219 spaces
Bicycle facilities10 spaces
Accessibleyes
Other information
Fare zone3
History
Opened1845
Previous namesSouth Canton, Canton
Passengers
2024334 daily boardings[1]
Services
Preceding station MBTA Following station
Stoughton
Terminus
Providence/​Stoughton Line Canton Junction
Former services
Preceding station New York, New Haven and Hartford Railroad Following station
Springdale
toward Stoughton
Stoughton Branch Canton Junction
Terminus
Stoughton
toward Fall River
Boston–Fall River Canton Junction
toward Boston
Stoughton Boston–New Bedford
Location
Close

History

1907 postcard of Canton station

The Stoughton Branch Railroad opened in early 1845. The station near the village center was named South Canton to distinguish it from Canton station on the Boston and Providence Railroad mainline. Around 1879, the branch station was renamed Canton, while the mainline station became Canton Junction.[2] The Old Colony Railroad constructed a new freight house at Canton in 1891.[3]

Around 2001, the station was briefly proposed to be closed as part of the South Coast Rail project.[4] The station is proposed to be reconstructed as part of Phase 2 of the since-modified project, which would extend the Stoughton Branch south to several South Coast cities.[5] Under plans released in 2013, a second track would be added through the station to support increased bidirectional service; two 800-foot (240 m) low-level platforms would be built, each with a mini-high platform for accessibility.[6] By 2024, with Phase 1 nearing completion, it was unclear whether Phase 2 would ever be constructed.[7]

References

Further reading

Related Articles

Wikiwand AI