Changping Xishankou station
Beijing Subway station
From Wikipedia, the free encyclopedia
Changping Xishankou station[1] (Chinese: 昌平西山口站; pinyin: Chāngpíng Xīshānkǒu zhàn) is a station on the Changping Line of the Beijing Subway. It was opened on 26 December 2015.[2] It is the current northern terminus of the line as well as the northernmost station in the entire Beijing Subway.
LocationNanjian Road (南涧路) and Wanxi Road (万西路)
Shisanling, Changping District, Beijing
China
Shisanling, Changping District, Beijing
China
Coordinates40°14′41″N 116°11′43″E
Line Changping line
Platform | |||||||||||
| General information | |||||||||||
| Location | Nanjian Road (南涧路) and Wanxi Road (万西路) Shisanling, Changping District, Beijing China | ||||||||||
| Coordinates | 40°14′41″N 116°11′43″E | ||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
| Line | Changping line | ||||||||||
| Platforms | 2 (1 island platform) | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Underground | ||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Opened | December 26, 2015 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Station layout
The station has an underground island platform.
Exits
There are 4 exits, lettered A, B, C, and D. Exit B is wheelchair accessible.