The Chiayi-class patrol vessel is a heavy patrol vessel of the Coast Guard Administration of Taiwan. The design is based on Fincantieri Vard Marine's VARD 7 125 offshore patrol vessel design. Four ships are planned.[6] All four are planned to be constructed by CSBC Corporation, Taiwan.[7]

Built2018-Present
Planned4
Quick facts Class overview, Builders ...
Chiayi-class patrol vessel
CG 5001 Chiayi
Class overview
BuildersCSBC Corporation, Taiwan
OperatorsCoast Guard Administration
Built2018-Present
Planned4
Completed4
Active4
General characteristics
TypeLarge patrol vessel
Displacement5,044 tons[1]
Length125m[2]
Beam16.5m[2]
Speed24 knots[2]
Range>10,000 nautical miles[3]
Armament1 X NCSIST 2.75in rockets remote weapon station, 2 X 20mm cannon remote weapon station, 3 X water cannons[4]
Aircraft carriedUH-60/S-70C
Aviation facilitiesHangar
NotesContract is NT$11.74 billion (US$392 million) for the delivery of all four vessels[5]
Close

The class has a helipad and hangar which can accommodate a UH-60 Black Hawk helicopter. It is equipped with a medical center with a negative pressure area, a surgery suite, and an X-ray facility.[7][8]

History

The procurement is part of a decade long Coast Guard shipbuilding project with a projected budget of NT$42.6 billion ($1.4 billion).[7] The budgeted cost of the four 4,000 ton patrol vessels is NT$ 11.74 billion (US$392 million).[2] Delivery of all four is planned to be completed by 2025.[9]

The first vessel of the class, Chiayi (CG5001), was launched in June 2020.[7] The R.O.C President of Taiwan Tsai Ing-wen presided over the launch.[3] The Coast Guard took possession of Chiayi in April 2021.[1]

The second vessel, Hsinchu (CG5002), was delivered in April 2022.[5]

Vessels

A total of 4 vessels are planned.

  • Chiayi (CG5001), launched in June 2020,[7] commissioned and delivered in April 2021.[10]
  • Hsinchu (CG5002), launched in April 2021,[11] commissioned and delivered in December 2022.
  • Yunlin (CG5003), launched in December 2022,[12] commissioned and delivered in March 2024.[13]
  • Taipei (CG5005), launched in March 2024, and delivered in September 2025.[13]