City Hall, Galway

Municipal building in Galway, Ireland From Wikipedia, the free encyclopedia

City Hall (Irish: Halla na Cathrach, Gaillimh) is a municipal facility being fitted out at Crown Square in Galway, Ireland. It is scheduled to become the administrative centre of Galway City Council in 2024.

Architectural style
Modern style
LocationCrown Square, Galway, Ireland
Coordinates53.2871°N 9.0218°W / 53.2871; -9.0218
Completed2024
Quick facts General information, Architectural style ...
City Hall, Galway
Halla na Cathrach, Gaillimh
City Hall is located in County Galway
City Hall
City Hall
Location within County Galway
General information
Architectural style
Modern style
LocationCrown Square, Galway, Ireland
Coordinates53.2871°N 9.0218°W / 53.2871; -9.0218
Completed2024
Cost€56 million
Design and construction
ArchitectHenry J. Lyons
Main contractorJ. J. Rhatigan
Close

History

The original municipal building in the city was the Tholsel which was built about 1639.[1] This was replaced by Galway Town Hall in Courthouse Square which was completed in 1825.[2] After it was reformed in 1937, Galway Corporation was mostly based at offices in Dominick Street and Fishmarket.[3] It moved to modern offices at College Lane in Galway in 1991.[4]

In May 2005, the American company, Crown Equipment Corporation, decided to relocate its operations from Mervue Business Park on the east side of Galway to Suzhou in China.[5] The site subsequently became the subject of a major reclamation and redevelopment project known as Crown Square. The new buildings on the site were designed by Henry J. Lyons in the Modern style, built by J. J. Rhatigan in steel and glass and were completed in 2022.[6][7][8]

In September 2022, the council, having decided that it needed larger premises, announced that it would acquire one of the completed buildings for its new City Hall.[9][10] The acquisition of the building was completed at a cost of €44 million in December 2022.[11][12][13] The cost of the acquisition was financed by a loan from the Housing Finance Agency. The council also confirmed that it would let a fit-out contract, which could cost a further €12 million, with a view to relocating to the new premises in 2024.[14]

It was revealed, in July 2024, that the total cost, including fit-out, could increase from €56 million to €75 million.[15][16]