Convoy PQ 15
From Wikipedia, the free encyclopedia
Convoy PQ 15 (26 April – 5 May 1942) was an Arctic convoy sent from Iceland by the Western Allies to aid the Soviet Union during the Second World War. The convoy sailed in late April 1942, reaching the Soviet northern ports after air attacks that sank three ships out of twenty-five.
| Convoy PQ 15 | |||||||
|---|---|---|---|---|---|---|---|
| Part of Arctic Convoys of the Second World War | |||||||
HMS Punjabi, sunk after a collision | |||||||
| |||||||
| Belligerents | |||||||
|
| ||||||
| Commanders and leaders | |||||||
Background
Lend-lease

After Operation Barbarossa, the German invasion of the USSR, began on 22 June 1941, Britain and USSR signed an agreement in July that they would "render each other assistance and support of all kinds in the present war against Hitlerite Germany".[1] Before September 1941 the British had dispatched 450 aircraft, 22,000 long tons (22,000 t) of rubber, 3,000,000 pairs of boots and stocks of tin, aluminium, jute, lead and wool. In September British and US representatives travelled to Moscow to study Soviet requirements and their ability to meet them. The representatives of the three countries drew up a protocol in October 1941 to last until June 1942 and to agree new protocols to operate from 1 July to 30 June of each following year until the end of Lend-Lease. The protocol listed supplies, monthly rates of delivery and totals for the period.[2]
The first protocol specified the supplies to be sent but not the ships to move them. The USSR turned out to lack the ships and escorts and the British and Americans, who had made a commitment to "help with the delivery", undertook to deliver the supplies for want of an alternative. The main Soviet need in 1941 was military equipment to replace losses because, at the time of the negotiations, two large aircraft factories were being moved east from Leningrad and two more from Ukraine. It would take at least eight months to resume production, until when, aircraft output would fall from 80 to 30 aircraft per day. Britain and the US undertook to send 400 aircraft a month, at a ratio of three bombers to one fighter (later reversed), 500 tanks a month and 300 Bren gun carriers. The Anglo-Americans also undertook to send 42,000 long tons (43,000 t) of aluminium and 3, 862 machine tools, along with sundry raw materials, food and medical supplies.[2]
British grand strategy
The growing German air strength in Norway and increasing losses to convoys and their escorts, led Rear-Admiral Stuart Bonham Carter, commander of the 18th Cruiser Squadron, Admiral sir John Tovey, Commander in Chief Home Fleet and Admiral Sir Dudley Pound the First Sea Lord, the professional head of the Royal Navy, unanimously to advocate the suspension of Arctic convoys during the summer months. The small number of Russian ships available to meet Arctic convoys, losses inflicted by Luftflotte 5 based in Norway and the presence of the German battleship Tirpitz in Norway from early 1942, had led to a large number of ships full of supplies to Russia becoming stranded at the west end and empty and damaged ships waiting at the east end.[3]
Despite the views of the Navy, Churchill came under pressure from the president of the United States, Franklin D. Roosevelt and the Soviet leader, Joseph Stalin, bowed to political reality and ordered the dispatch of a larger convoy to reduce the backlog,
The operation is justified if half gets through. Failure on our part to make the attempt would weaken our influence with both our major allies.
— Winston Churchill[4]
Convoy PQ 13 had been the first convoy to suffer serious casualties, five ships being sunk by submarines, aircraft and surface ships.[5] Tovey asked the Russians for more submarine patrols in the Barents Sea and more destroyer escorts for the final leg of the convoys. More escorts were diverted from Western Approaches Command to increase the close escort to about ten vessels. Bomber Command had sent 33 Halifax heavy bombers to attack Tirpitz on 31 March in exceedingly poor weather, through which few aircraft managed to bomb. No hits were obtained and five of the Halifaxes were shot down. Convoy PQ 14 was considerably larger than earlier convoys.[6]
Signals intelligence
Ultra

The British Government Code and Cypher School (GC&CS) based at Bletchley Park housed a small industry of code-breakers and traffic analysts that intercepted and decoded German naval transmissions. By June 1941, the German Enigma machine Home Waters (Heimish) settings used by surface ships and U-boats could quickly be read. On 1 February 1942, the Enigma machines used in U-boats in the Atlantic and Mediterranean were changed but German ships and the U-boats in Arctic waters continued with the older Heimish (Hydra from 1942, code-named Dolphin by the British). By mid-1941, British Y-stations were able to read Luftwaffe wireless telegraphy (W/T) transmissions and give advance warning of Luftwaffe operations. In 1941, interception parties (code-named Headaches) embarked on warships. Enigma decrypts were used twice to tell Convoy PQ 14 that the big German ships had not sailed.[7]
B-Dienst
The rival German Beobachtungsdienst (B-Dienst, Observation Service) of the Kriegsmarine Marinenachrichtendienst (MND, Naval Intelligence Service) had broken several Admiralty codes and cyphers by 1939, which were used to help Kriegsmarine ships elude British forces and provide opportunities for surprise attacks. From June to August 1940, six British submarines were sunk in the Skaggerak using information gleaned from British wireless signals. In 1941, B-Dienst read signals from the Commander in Chief Western Approaches informing convoys of areas patrolled by U-boats, enabling the submarines to move into "safe" zones.[8] B-Dienst had broken Naval Cypher No 3 in February 1942 and by March was reading up to 80 per cent of the traffic, which continued until 15 December 1943. By coincidence, the British lost access to the Shark cypher and had no information to send in Cypher No 3 which might compromise Ultra.[9]
Luftflotte 5
In March 1942, Adolf Hitler issued a directive for a greater anti-convoy effort to weaken the Red Army and prevent Allied troops being transferred to northern Russia, preparatory to a landing on the coast of northern Norway. Luftflotte 5 (Generaloberst Hans-Jürgen Stumpff) was to be reinforced and the Kriegsmarine was ordered to put an end to Arctic convoys and naval incursions. The Luftwaffe and Kriegsmarine were to work together with a simplified command structure, which was implemented after a conference; the Navy had preferred joint command but the Luftwaffe insisted on the exchange of liaison officers. Luftflotte 5 was to be reinforced by 2./Kampfgeschwader 30 (KG 30) which was to increase its readiness for operations. A squadron of Aufklärungsflieger Gruppe 125 (Aufkl.Fl.Gr. 125) was transferred to Norway and more long-range Focke-Wulf Fw 200 Kondor patrol aircraft from Kampfgeschwader 40 (KG 40) were sent from France. At the end of March, the air fleet was divided. Fliegerführer Nord (Ost) [Oberst Alexander Holle], the largest command, was based at Kirkenes with 2./JG 5, 10.(Z)/JG 5, 1./StG 5 (Dive Bomber Wing 5) and 1.Fernaufklärungsgruppe 124 [1./(F) 124] (1 Squadron, Long Range Reconnaissance Wing 124) charged with attacks on Murmansk and Archangelsk as well as attacks on convoys. [10]

Part of Fliegerführer Nord (Ost) was based at Petsamo (5./JG 5, 6./JG 5 and 3./Kampfgeschwader 26 (3./KG 26), Banak (2./KG 30, 3./KG 30 and 1./(F) 22) and Billefjord (1./Kü.Fl.Gr. 125). Fliegerführer Lofoten (Oberst Hans Roth) was based at Bardufoss but had no permanently attached units, which were added according to events. At the start of the anti-shipping campaign only the coastal patrol squadrons 3./Küstenfliegergruppe 906 at Trondheim and 1./1./Kü.Fl.Gr. 123 at Tromsø were attached to Fliegerführer Lofoten. Fliegerführer Nord (West) was based at Sola and was responsible for the early detection of convoys and attacks south of a line from Trondheim westwards to Shetland and Iceland, with 1./(F) 22, the Kondors of 1./KG 40, short-range coastal reconnaissance squadrons 1./Küstenfliegergruppe 406 (1./Kü.Fl.Gr. 406), 2./ Küstenfliegergruppe 406 (2./Kü.Fl.Gr. 406) and a weather reconnaissance squadron.[11]
Luftwaffe tactics
As soon as information was received about the assembly of a convoy, Fliegerführer Nord (West) would send long-range reconnaissance aircraft to search Iceland and northern Scotland. Once a convoy was spotted aircraft were to keep contact as far as possible in the extreme weather of the area. If contact was lost its course at the last sighting would be extrapolated and overlapping sorties would be flown to regain contact. All three Fliegerführer were to co-operate as the convoy moved through their operational areas. Fliegerführer Lofoten would begin the anti-convoy operation east to a line from the North Cape to Spitzbergen Island, whence Fliegerführer Nord (Ost) would take over using his and Fliegerführer Lofoten's aircraft, which would to Kirkenes or Petsamo to stay in range. Fliegerführer Nord (Ost) was not allowed to divert aircraft to ground support during the operation. As soon as the convoy came into range, the aircraft were to keep up a continuous attack until the convoy docked at Murmansk or Archangelsk.[12]
Air-sea rescue

The Luftwaffe Sea Rescue Service (Seenotdienst) along with the Kriegsmarine, the Norwegian Society for Sea Rescue (RS) and ships on passage, recovered aircrew and shipwrecked sailors. The service comprised Seenotbereich VIII at Stavanger covering Stavanger, Bergen and Trondheim and Seenotbereich IX at Kirkenes for Tromsø, Billefjord and Kirkenes. Co-operation was as important in rescues as it was in anti-shipping operations if people were to be saved before they succumbed to the climate and severe weather. The sea rescue aircraft comprised Heinkel He 59 floatplanes, Dornier Do 18 and Dornier Do 24 seaplanes.[13]
Oberkommando der Luftwaffe (OKL, the high command of the Luftwaffe) was not able to increase the number of search and rescue aircraft in Norway, due to a general shortage of aircraft and crews, despite Stumpff pointing out that coming down in such cold waters required extremely swift recovery and that his crews "must be given a chance of rescue" or morale could not be maintained. After the experience of PQ 16, Stumpff gave the task to the coastal reconnaissance squadrons, whose aircraft were not usually engaged in attacks on convoys. They would henceforth stand by to rescue aircrew during anti-shipping operations.[13]
Prelude
Arctic Ocean

Between Greenland and Norway are some of the most stormy waters of the world's oceans, 890 mi (1,440 km) of water under gales full of snow, sleet and hail. Around the North Cape and the Barents Sea the sea temperature rarely rises above 4° Celsius and a man in the water would probably die unless rescued immediately. The cold water and air made spray freeze on the superstructure of ships, which had to be removed quickly to avoid the ship becoming top-heavy. The cold Arctic water was met by the Gulf Stream, warm water from the Gulf of Mexico, which became the North Atlantic Drift, arriving at the south-west of England the drift moves between Scotland and Iceland. North of Norway the drift splits.[14]
A northern stream goes north of Bear Island to Svalbard and the southern stream following the coast of Murmansk into the Barents Sea. The mingling of cold Arctic water and warmer water of higher salinity generates thick banks of fog for convoys to hide in. The waters drastically reduced the effectiveness of ASDIC as U-boats moved in waters of differing temperatures and density. In winter, polar ice can form as far south as 50 mi (80 km) of the North Cape and in summer it can recede to Svalbard, forcing ships closer to Luftwaffe air bases or being able to sail further out to sea. The area is in perpetual darkness in winter and permanent daylight in the summer which makes air reconnaissance almost impossible or easy.[14]
Arctic convoys
In October 1941, the Prime Minister, Winston Churchill, made a commitment to send a convoy to the Arctic ports of the USSR every ten days and to deliver 1,200 tanks a month from July 1942 to January 1943, followed by 2,000 tanks and another 3,600 aircraft in excess of those already promised.[1][a] The first convoy was due at Murmansk around 12 October and the next convoy was to depart Iceland on 22 October. A motley of British, Allied and neutral shipping loaded with military stores and raw materials for the Soviet war effort would be assembled at Hvalfjörður in Iceland, convenient for ships from both sides of the Atlantic.[16] By late 1941, the convoy system used in the Atlantic had been established on the Arctic run; a convoy commodore ensured that the ships' masters and signals officers attended a briefing to make arrangements for the management of the convoy, which sailed in a formation of long rows of short columns. The commodore was usually a retired naval officer or a Royal Naval Reserveist and would be aboard one of the merchant ships (identified by a white pendant with a blue cross). The commodore was assisted by a Naval signals party of four men, who used lamps, semaphore flags and telescopes to pass signals in code.[17]
In large convoys, the commodore was assisted by vice- and rear-commodores with whom he directed the speed, course and zig-zagging of the merchant ships and liaised with the escort commander.[17][b] By the end of 1941, 187 Matilda II and 249 Valentine tanks had been delivered, comprising 25 per cent of the medium-heavy tanks in the Red Army and 30 to 40 per cent of the medium-heavy tanks defending Moscow. In December 1941, 16 per cent of the fighters defending Moscow were Hawker Hurricanes and Curtiss Tomahawks from Britain; by 1 January 1942, 96 Hurricane fighters were flying in the Soviet Air Forces (Voyenno-Vozdushnye Sily, VVS). The British supplied radar apparatuses, machine tools, ASDIC and other commodities.[18] During the summer months, convoys went as far north as 75 N latitude then south into the Barents Sea and to the ports of Murmansk in the Kola Inlet and Archangel in the White Sea. In winter, due to the polar ice expanding southwards, the convoy route ran closer to Norway.[19] The voyage was between 1,400 and 2,000 nmi (2,600 and 3,700 km; 1,600 and 2,300 mi) each way, taking at least three weeks for a round trip.[20]
Ships
The convoy consisted of 25 merchant ships, 15 US, 8 British, one Soviet and one Panamanian and was accompanied by the oiler RFA Gray Ranger, which travelled with a destroyer escort. The Close Escort was led by Commander John Crombie in HMS Bramble, a Halcyon-class minesweeper and consisted of two other minesweepers and four trawlers, joined later by four destroyers and the anti-aircraft ship HMS Ulster Queen.
A Cruiser Cover Force (Rear-Admiral Harold Burrough) in the Fiji-class cruiser HMS Nigeria, with the heavy cruiser HMS London and two destroyers. A Distant Covering Force (Tovey) comprised the battleships HMS King George V and USS Washington (Rear-Admiral Robert C. Giffen, USN) the aircraft carrier HMS Victorious, the heavy cruisers USS Tuscaloosa and Wichita, the light cruiser Kenya and ten destroyers. The convoy was also covered by a patrol of four submarines off Norway, guarding against a sortie by German warships.
Voyage

Convoy PQ 15 sailed from Oban in Scotland on 10 April, to Reykjavík in Iceland and sailed on 26 April 1942 with its local escort until 5 May. The convoy was joined on 28 April by the ocean escort, giving the convoy a close escort of twelve ships.
German reconnaissance aircraft sighted the convoy on 28 April while it was 250 nmi (460 km; 290 mi) south-west of Bjørnøya (Bear Island). No attack developed for two days as the German forces were busy with the reciprocal Convoy QP 11, that had left Murmansk on 28 April.
On 1 May the Luftwaffe made its first attack on Convoy PQ 15, with six Junkers Ju 88s. The German bombers failed to inflict any damage and one was shot down. The Distant Cover Force suffered two losses when King George V and the destroyer HMS Punjabi collided in fog. Punjabi sank and King George V was forced to return to port. Her place in the group was taken by the battleship HMS Duke of York, which steamed from Scapa Flow to reinforce the escorts.
The escorts made an asdic contact on 2 May, that was attacked by the destroyer HMS St. Albans and the minesweeper HMS Seagull. The submarine was damaged and forced to the surface and it was found to be the Polish submarine ORP Jastrząb, that had been sent to patrol off Norway but was some way out of position. Jastrzab was too badly damaged to continue and was scuttled.
On 3 May at 1:30 a.m. in the twilight of the midnight sun, six Heinkel He 111 bombers of I./Kampfgeschwader 26, the Luftwaffe's new torpedo bomber force, made the first German torpedo bomber attack of the war.[21] Botavon and Cape Corso were sunk and Jutland was damaged, later to be sunk by U-251. Two aircraft were shot down and a third damaged, that later crashed. An attack by German medium bombers at dusk failed.
Deteriorating weather on 4 May prevented further attacks, an Arctic gale quickly turning into a snowstorm. Convoy PQ 15 arrived at the Kola Inlet at 9:00 p.m. on 5 May with no further losses.
Aftermath
Analysis
Botavon and Cape Corso had been sunk by torpedo-bombers; Jutland was damaged by torpedo-bombers and later sunk by U-251. Of the escorting warships, the submarine Jastrzab and destroyer Punjabi had been sunk in a collision with the battleship King George V, that had been damaged. Twenty-two merchant ships had arrived safely in Murmansk, the largest Allied convoy yet to arrive in the Soviet Union. The convoy was regarded by the Allies as a success, although it gave them a taste of the difficulties to come on the Arctic convoy run.
From late March to late May the air effort against Convoy PQ 13, Convoy PQ 14, PQ 15 and Convoy QP 9, Convoy QP 10 and Convoy QP 11 had little effect, twelve sinkings out of 16 lost in PQ convoys and two out of five sinkings from QP convoys being credited to the Luftwaffe; 166 merchant ships had sailed for Russia and 145 had survived the journey.[12] Bad weather had been nearly as dangerous as the Luftwaffe but in April, the spring thaw grounded many Luftwaffe aircraft and in May bad weather led to contact being lost and convoys scattering, being impossible to find in the long Arctic night. When air attacks on convoys had taken place, the formations rarely amounted to more than twelve aircraft, greatly simplifying the task of convoy anti-aircraft gunners, who shot down several aircraft in April and May. Failings in liaison between the Luftwaffe and Kriegsmarine were revealed and tactical co-operation greatly enhanced, Hermann Böhm (Kommandierender Admiral Norwegen) noting that in the operation against Convoy PQ 15 and the reciprocal Convoy QP 11, there were no problems in co-operation between aircraft, submarines and destroyers.[22] From 152 aircraft in January, reinforcements to Luftflotte 5 increased its strength to 221 front-line aircraft by March 1942.[11][c]
Strategic assessments
German

On 12 May, SKL judged that the British and Americans were well aware of the importance of shipments to the Soviet Union, when the second German attempt to knock the USSR out of the war was due. Intelligence reports referred to much bigger convoys, along with raids and a landing in northern Norway to stop the German forces there from intervening, raids being the more likely threat. From the start of May the big ships that could sortie against a convoy comprised the battleship Tirpitz, the heavy cruisers Admiral Scheer and Admiral Hipper with six destroyers and six torpedo boats (small destroyers). The heavy cruiser Lützow was due at Trondheim in mid-May and the last ten destroyers of the Kriegsmarine would be ready for Norway in June. On 9 May, Admiral Scheer transferred from Trondheim to Narvik, closer to the convoy route, as did Schmundt with Z34 and Z35 to be followed by Lützow and another two destroyers.[24]

As SKL prepared to for more ambitious use of its ships, the tactical limits it imposed, led to some bemusement amongst the senior officers. Less was expected the U-boat force, because night attacks, so successful in the Atlantic, were impossible in the long daylight hours of the midnight sun when it was difficult to stalk convoys and to evade attacks from escorts liable to emerge suddenly from patches of fog and rain. Until August, SKL anticipated only "minor and purely accidental" success and so it would be futile to reinforce the Artic U-boats. As usual, Rear-Admiral Karl Dönitz, the Befehlshaber der U-Boote, wanted the U-boats back in the Atlantic and equally predictably, SKL took the view that even rare sinkings were worth the diversion of U-boats to the Arctic. In the ten months to the end of April 1942, 32 U-boats operated in the Arctic, when 27 Arctic convoys of 309 ships had been run and two U-boats sunk for the loss of six ships. In north American waters, from January 1942, 25 boats had sunk 336 ships of 1.8 million GRT.[25]
British
On 29 April, Oliver Lyttleton, the Minister of Production since 12 March, presented a review of the Arctic convoys. The review concluded that the Soviet Union would face the main German effort of 1942 and that Britain must guard against the USSR making a separate peace by making a maximum effort to deliver military equipment. Britain must choose between a Second Front in 1942 or send as much assistance to the Soviet Union, even if this was detrimental to the war economy. Britain should sent its most potent weapons and ensure that the were delivered before the German summer offensive began, that a diminution of deliveries could affect the morale of the industrial workforce in Britain. The last conclusion was that the only way to get British-made tanks into action was through the Red Army (ignoring North Africa and the Far East) and that more tanks mattered more than more aircraft.[26]
The document was rare in its emphasis the relationship between operations on the continent and support for Russia. Despite the significance of this point, discussion concentrated on whether to cut First Protocol April and May aircraft exports by 40% and how to sent 50% more tanks and aircraft for the first half of the Second Protocol, due to begin on 1 July. Aircraft deliveries were already 136 short but crises in North Africa and the Far East could not be ignored. The danger of the looming second German attempt to defeat the USSR meant that it was most important that the First Protocol be met. The Air Ministry should meet the shortage by other means than cutting the supply of aircraft to Russia and Lyttleton thought that British tank production would fund a 50% increase in exports to the USSR and that this would placate the Russians for not increasing the number aircraft supplied but a decision was postponed. The Second Protocol (1 July 1942 to 1 July 1943) requirements from the Russians were for about 10.5 million tons of supplies, with 8.3 million tons coming from the US.[27]
The American authorities calculated that the Russians could only import about 3 million tons in Arctic convoys. The Admiralty considered that no more than 25 ships could be escorted in one convoy and that only three convoys could be run in eight weeks. Even if some British commitments could be met by the US the British would need 10% more ships and that the prospect for a big increase in Arctic deliveries above the 320,000 tons delivered offered no certainty that Soviet port facilities could handle three million tons. Ships had been carrying an average of 3,000 tons and US assumptions were based on double this and the burden of protecting Arctic and Persian Gulf convoys carrying mainly US supplies would fall on the Royal Navy, against the increasing intensity of German counter-operations, Arctic convoys had three times the number of anti-submarine escorts than comparable Atlantic convoys. The loss of Trinidad concentrated minds in the British government and Admiralty about the feasibility of convoys during the summer months. With the loss of HMS Fiji during the Battle of Crete in 1941, it was clear that even fast, manoeuvrable and well-armed warships were doomed, in waters where the Germans had air supremacy.[28]
Soviet
Josef Stalin was influenced by reports from Admiral Arseny Golovko and the Soviet Naval Command that inflated the achievements of the Navy in the far north, Golovko claiming that in the first year of the war, 135 ships of 583,000 GRT had been sunk and 412 aircraft shot down. The real figures were 28 ships of around 40,000 GRT; two U-boats being sunk before the end of the war, of 44 U-boats sunk in the Arctic, 38 were due to the British. About ten per cent of the claim for aircraft was realistic, Luftflotte V not having anything like that many aircraft until mid-1942. On 5 May, Rear-Admiral Geoffrey Miles, the leader of the British Military Mission to Russia, reported that Soviet naval personnel were young, disciplined and determined fighters but had no naval tradition and a top-down command structure that stifled initiative and sneered at advice from Allied navies. During operations spectaculars were preferred to useful sailing, convoy escort being looked down on. Seamanship and navigation were poor and naval weapons were only effective in good weather. Ships spent too much time in harbour and destroyers neglected to refuel on return to base, readiness being a matter of little interest.[29]
Allied order of battle
Merchant ships
| Name | Year | Flag | GRT | Notes |
|---|---|---|---|---|
| Alcoa Cadet | 1919 | 4,823 | Lost in N. Russia after arrival | |
| Alcoa Rambler | 1919 | 5,500 | At Reykjavik 15–26 April | |
| Bayou Chico | 1920 | 5,401 | ||
| Botavon | 1912 | 5,848 | Convoy Commodore H. J. Anchor; torpedo-bomber, scuttled[31] | |
| Cape Corso | 1929 | 3,807 | 2 May, sunk by torpedo-bomber[31] | |
| Cape Race | 1930 | 3,807 | At Reykjavik 15–26 April; vice convoy commodore | |
| Capira | 1920 | 5,625 | ||
| Deer Lodge | 1919 | 6,187 | At Reykjavik 16–26 April | |
| Empire Bard | 1942 | 3,114 | Joined from Reykjavik. Heavy-lift crane ship N. Russia | |
| Empire Morn | 1941 | 7,117 | CAM ship at Reykjavik 16–26 April | |
| Expositor | 1919 | 4,959 | Reykjavik 15–26 April | |
| Francis Scott Key | 1941 | 7,191 | ||
| Hegira | 1919 | 7,588 | ||
| Jutland | 1928 | 6,153 | 2 May, torpedo, I./KG26, 73°02′N,19°46′E, sunk, U-251 3 May, 1† 62 surv.[31] | |
| Krassin | 1917 | 4,902 | Icebreaker on passage | |
| Lancaster | 1918 | 7,516 | ||
| Montcalm | 1904 | 1,432 | Icebreaker on passage | |
| Mormacrey | 1919 | 5,946 | ||
| Mormacrio | 1919 | 5,940 | ||
| Paul Luckenbach | 1913 | 6,606 | ||
| Seattle Spirit | 1919 | 5,627 | ||
| Southgate | 1926 | 4,862 | At Reykjavik 16–26 April | |
| Texas | 1919 | 5,638 | ||
| Topa Topa | 1920 | 5,356 | ||
| Zebulon B Vance | 1942 | 7,177 | ||
Fuelling force
| Name | Flag | Type | Notes |
|---|---|---|---|
| HMS Ledbury | Hunt-class destroyer | 26 April – 27 May, det. Gray Ranger, Lerwick 8 May | |
| RFA Gray Ranger | Ranger-class tanker | 6,700 GRT, det. arr. Lerwick 8 May, with Ledbury | |
Escort forces
German order of battle
See also
Notes
- In October 1941, the unloading capacity of Archangel was 300,000 long tons (300,000 t), Vladivostok (Pacific Route) 140,000 long tons (140,000 t) and 60,000 long tons (61,000 t) in the Persian Gulf (for the Persian Corridor route) ports.[15]
- By May Luftflotte 5 had 264 aircraft based around the North Cape in northern Norway, consisting of 108 Junkers JU 88 long-range bombers, 42 Heinkel He 111 torpedo-bombers, 15 Heinkel He 115 float-plane torpedo-bombers, 30 Junkers Ju 87 dive-bombers and 74 long range Focke Wulf 200s, Junkers 88s and Blohm & Voss BV 138s.[23]