Wikiwand AI

Cooksville GO Station

Transit station in Cooksville, Mississauga, Canada From Wikipedia, the free encyclopedia

Cooksville GO Station is a train and bus station serving GO Transit's Milton line, located in the community of Cooksville in Mississauga, Ontario, Canada. It is located at 3210 Hurontario Street, near Dundas and Hurontario Streets. The future Hurontario LRT will connect to this station.[1]

Location3210 Hurontario Street
Mississauga, Ontario
Canada
Coordinates43°34′59″N 79°37′25″W
Platforms1 side platform
Quick facts General information, Location ...
Cooksville
New station building completed in 2020
General information
Location3210 Hurontario Street
Mississauga, Ontario
Canada
Coordinates43°34′59″N 79°37′25″W
OwnerMetrolinx
Platforms1 side platform
Tracks2
Bus routes  21 
Connections
Construction
Structure type
Brick station building
Parking1,458 spaces
Cycle facilities
Yes
AccessibleYes
Other information
Station codeGO Transit: CO
Fare zone11
History
OpenedOctober 27, 1981 (1981-10-27)
Rebuilt2018–2020
Services
Preceding station GO Transit Following station
Erindale
towards Milton
Milton Dixie
towards Union
Former services at CP station
Preceding station Canadian Pacific Railway Following station
Erindale
toward Detroit
Detroit – Montreal Dixie
Erindale
toward Owen Sound
Owen Sound – Toronto Dixie
toward Toronto
Future services
Preceding station Metrolinx Following station
Fairview Hurontario LRT Dundas
Location
Close
Original station building

Description

Like most GO stations, Cooksville has parking for commuters and a station building with a ticket sales agent and a waiting room. It is located near several condominium complexes, which provides ridership on the Milton Line. The 1400-space parking lot allows access to those who live closer to Mississauga City Centre to use the station.

The GO Station is served by seven trains inbound to Union Station in the morning rush hour and seven trains outbound to Milton during the evening rush hour. There is also the Train-Bus during off-peak hours.

Despite growing ridership on the Milton line, GO cannot schedule additional trains because of the busy Canadian Pacific Kansas City freight services running on the same tracks.[2] Trains were extended from ten to twelve carriages in a phased roll-out between April 8, 2008[3] and May 2, 2008 in order to increase capacity, and congestion is alleviated somewhat by the extensive train-bus services outside of rush periods.

On October 13, 2008 the Canadian Pacific Spirit Train stopped at Cooksville GO station to promote the Vancouver 2010 Winter Olympics.[4]

Repairs to the platforms and pedestrian tunnels began in October 2014 and was completed by the spring of 2015.[5]

Reconstruction

Demolition of the original Cooksville GO station building and portions of the parking lot began in 2018 in preparation for the construction of new station structures. The new station includes a multi-level parking structure, improved pedestrian access, and a connection to the under-construction Hurontario LRT.[6] Construction was completed on November 10, 2020,[7] at a cost of $128.4 million.[8] The new station is characterized by a bold expanded mesh facade screen designed by NORR Architects.[9] The design won awards from the International Parking and Mobility Institute for Design Excellence and was also a World Architecture Award Winner.[10]

Connecting buses

Buses such as MiWay and GO Transit enter the station with the following routes:

MiWay[11]
  • 2 Hurontario
  • 4 North Service Road
  • 28 Confederation
  • 38 Creditview
  • 53 Kennedy
  • 103 Hurontario Express
GO Transit
  • 21 Milton/Toronto[12]
Cooksville go station Mississauga, night view
Cooksville GO station at night in 2024

References

Related Articles

Timelines

Top Qs

Fact Checks