Dadun station
Foshan Metro Line 3 station
From Wikipedia, the free encyclopedia
Dadun station (Chinese: 大墩站; pinyin: Dàdūn Zhàn; Cantonese Yale: Daaihdēun Jaahm) is a station on Line 3 of Foshan Metro, located in Foshan's Shunde District.[1] It opened on 28 December 2022.[2][3]
Platform | |||||||||||||
| Chinese name | |||||||||||||
| Chinese | 大墩站 | ||||||||||||
| |||||||||||||
| General information | |||||||||||||
| Location | Intersection of Heyue Road (荷岳路) and South Wenhua Road (文华南路) (under planning), Lecong Shunde District, Foshan, Guangdong China | ||||||||||||
| Coordinates | 22°57′23.36″N 113°7′25.79″E | ||||||||||||
| Operated by | Foshan Metro Operation Co., Ltd. | ||||||||||||
| Lines | Line 3 South section | ||||||||||||
| Platforms | 2 (1 island platform) | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
| Structure type | Underground | ||||||||||||
| Accessible | Yes | ||||||||||||
| Other information | |||||||||||||
| Station code | F318 | ||||||||||||
| History | |||||||||||||
| Opened | 28 December 2022 | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
Station layout
The station has an island platform under Wenhua South Road.[4]
| G | - | Exits A-D |
| L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Security Facilities |
| L2 Platforms |
Platform 1 | |
| Island platform, doors will open on the left | ||
| Platform 2 | 3 towards Shunde College Railway Station (Yuebu) | |
Entrances/exits
The station has 4 points of entry/exit. Exits A and B are located on the south side of Heyue Road, whilst Exits C and D are located on the north side. Exits A and C are accessible via elevators.[1]
History
On 31 August 2016, the pilot section of Line 3 (this station to Wanhua station) started construction to cooperate with the construction of the Guangzhou–Foshan circular intercity railway.[5] The station began enclosure construction on 16 March 2017[6] and officially started excavation on 5 December 2018.[7]
On 27 April 2017, the first tunnel shield of Line 3 (from this station to Dongping station) was successfully launched.[8] The tunneling shield broke through on 8 December the same year[9] and handed over for track laying on 31 August 2020.[10]
On the morning of 19 April 2019, the pouring construction of the first basement floor of the station was successfully completed.[11] On 21 November the same year, the station became the first station on the whole of Line 3 to top out.[12]
On the afternoon of 7 August 2020, the right line tunnel from this station to Shuikou station (now Yuebu station) broke through.[13] The tunnel section passed acceptance on 7 April 2022.[14]
The station passed the civil acceptance on 2 November 2021.[15] On 30 May 2022, the station completed the "three rights" transfer.[16] On 28 December the same year, the station opened with the opening of Line 3.[17]
Usage
The nearby surroundings of this station are fishponds and farmland, and there is little flow of people, so it was dubbed "the most down-to-earth subway station" by netizens during its initial opening. At the same time, some entrances/exits of the station were blocked by river inflows, and passengers needed to take a detour for several minutes to reach the municipal road after leaving the station.[18]
