Dadun station

Foshan Metro Line 3 station From Wikipedia, the free encyclopedia

Dadun station (Chinese: 大墩站; pinyin: Dàdūn Zhàn; Cantonese Yale: Daaihdēun Jaahm) is a station on Line 3 of Foshan Metro, located in Foshan's Shunde District.[1] It opened on 28 December 2022.[2][3]

Chinese大墩站
Hanyu PinyinDàdūn Zhàn
Hanyu PinyinDàdūn Zhàn
Yale RomanizationDaaihdēun Jaahm
Quick facts Chinese name, Chinese ...
Dadun

大墩
Foshan Metro
Platform
Chinese name
Chinese大墩站
Transcriptions
Standard Mandarin
Hanyu PinyinDàdūn Zhàn
Yue: Cantonese
Yale RomanizationDaaihdēun Jaahm
JyutpingDaai6deon1 Zaam6
General information
LocationIntersection of Heyue Road (荷岳路) and South Wenhua Road (文华南路) (under planning), Lecong
Shunde District, Foshan, Guangdong
China
Coordinates22°57′23.36″N 113°7′25.79″E
Operated byFoshan Metro Operation Co., Ltd.
Lines     Line 3
South section
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Station codeF318
History
Opened28 December 2022 (3 years ago) (2022-12-28)
Services
Preceding station Foshan Metro Following station
Dongping Line 3
South section
Yuebu
Location
Close

Station layout

The station has an island platform under Wenhua South Road.[4]

G - Exits A-D
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Facilities
L2
Platforms
Platform 1 arrow for L  3  towards Zhongshan Park (Dongping)
Island platform, doors will open on the left
Platform 2  3  towards Shunde College Railway Station (Yuebu) arrow for R

Entrances/exits

The station has 4 points of entry/exit. Exits A and B are located on the south side of Heyue Road, whilst Exits C and D are located on the north side. Exits A and C are accessible via elevators.[1]

  • A: Heyue Road Wheelchair user access
  • B: Heyue Road
  • C: Heyue Road Wheelchair user access
  • D: Heyue Road

History

On 31 August 2016, the pilot section of Line 3 (this station to Wanhua station) started construction to cooperate with the construction of the Guangzhou–Foshan circular intercity railway.[5] The station began enclosure construction on 16 March 2017[6] and officially started excavation on 5 December 2018.[7]

On 27 April 2017, the first tunnel shield of Line 3 (from this station to Dongping station) was successfully launched.[8] The tunneling shield broke through on 8 December the same year[9] and handed over for track laying on 31 August 2020.[10]

On the morning of 19 April 2019, the pouring construction of the first basement floor of the station was successfully completed.[11] On 21 November the same year, the station became the first station on the whole of Line 3 to top out.[12]

On the afternoon of 7 August 2020, the right line tunnel from this station to Shuikou station (now Yuebu station) broke through.[13] The tunnel section passed acceptance on 7 April 2022.[14]

The station passed the civil acceptance on 2 November 2021.[15] On 30 May 2022, the station completed the "three rights" transfer.[16] On 28 December the same year, the station opened with the opening of Line 3.[17]

Usage

The nearby surroundings of this station are fishponds and farmland, and there is little flow of people, so it was dubbed "the most down-to-earth subway station" by netizens during its initial opening. At the same time, some entrances/exits of the station were blocked by river inflows, and passengers needed to take a detour for several minutes to reach the municipal road after leaving the station.[18]

References

Related Articles

Wikiwand AI