Wikiwand AI

Daqing Sartu Airport

Airport in Heilongjiang, China From Wikipedia, the free encyclopedia

Daqing Saertu Airport (IATA: DQA, ICAO: ZYDQ) is an airport (class 4C) serving the city of Daqing in Heilongjiang Province, China. Construction started in 2007 with a total investment of 500 million yuan, and the airport was opened on 1 September 2009.[2]

AirporttypePublic
ServesDaqing, Heilongjiang, China
LocationSartu District, Daqing, Heilongjiang
Opened1 September 2009; 17 years ago (2009-09-01)
Quick facts 大庆萨尔图机场, Summary ...
Daqing Sartu Airport
大庆萨尔图机场
Summary
Airport typePublic
ServesDaqing, Heilongjiang, China
LocationSartu District, Daqing, Heilongjiang
Opened1 September 2009; 17 years ago (2009-09-01)
Coordinates46°44′47″N 125°07′56″E
Map
DQA is located in Heilongjiang
DQA
DQA
Location of airport in Heilongjiang
Runways
Direction Length Surface
m ft
17/35 2,600 8,530 Concrete
Statistics (2025 [1])
Passengers900,392
Aircraft movements7,157
Cargo (metric tons)1,903.2
Close
TraditionalChinese大慶薩爾圖機場
Hanyu PinyinDàqìng Sà'ěrtú Jīchǎng
Hanyu PinyinDàqìng Sà'ěrtú Jīchǎng
Quick facts Simplified Chinese, Traditional Chinese ...
Daqing Sartu Airport
Simplified Chinese大庆萨尔图机场
Traditional Chinese大慶薩爾圖機場
Transcriptions
Standard Mandarin
Hanyu PinyinDàqìng Sà'ěrtú Jīchǎng
Close

History

On May 21, 2006, the State Council and the Central Military Commission of China officially approved the construction of Daqing Sartu Airport.[3][4][5]

The construction of Sartu Airport began in October 2008. On August 3, 2009, all functional projects of the airport were completed.[4] The total investment was 434.44 million yuan.[6] On August 13, the airport completed its first test flight, and it officially opened to traffic on September 1.[4] It had a 4C flight zone rating, a 2,600-meter-long runway.[6]

In 2011, the first expansion and renovation project of Daqing Sartu Airport was completed. The project included adding two Class II remote aircraft stands, one dedicated de-icing apron, and one city terminal building.[7] However, the bidding process for the expansion and renovation project was found to have involved illegal and irregular activities. The contract price was more than double the winning bid of 126 million yuan, raising questions about the nature of the bidding process and investment oversight.[8]

In 2019, the "Daqing Sartu Airport Function Enhancement Project" commenced construction, which includes an 8,216.52 square meter international terminal, a connecting boarding bridge, and an immigration control building.[7]

Facilities

The airport has one runway that is 2,600 meters long and 45 meters wide, and a 14,000-square-meter terminal building. It is designed to handle 1.47 million passengers annually by 2020.[2]

Airlines and destinations

See also

References

Related Articles

Timelines

Top Qs

Fact Checks