Dayton Hollow Dam

From Wikipedia, the free encyclopedia

Coordinates46°13′51″N 96°07′03″W / 46.23083°N 96.11750°W / 46.23083; -96.11750
PurposeHydro Power
Fish & Wildlife Pond
StatusIn use
Constructionbegan1907
Dayton Hollow Dam[1]
Coordinates46°13′51″N 96°07′03″W / 46.23083°N 96.11750°W / 46.23083; -96.11750
PurposeHydro Power
Fish & Wildlife Pond
StatusIn use
Construction began1907
Opening date1909
Owner(s)Otter Tail Power Company
Dam and spillways
Type of damGravity dam
ImpoundsOtter Tail River
Height (foundation)41 ft (12 m)
Length256 ft (78 m)
Spillways1
Spillway type7 controlled sluice gates
Spillway capacity2,000 acre⋅ft (2,500 dam3)
Reservoir
CreatesDayton Hollow Reservoir
Total capacity5,000 acre⋅ft (6,200 dam3)
Catchment area1,810 sq mi (4,700 km2)
Normal elevation1,073 ft (327 m)[2]
TypeConventional
Hydraulic head36 ft (11 m)
Turbines3
Installed capacity1.0 MW[3]
NIDID# MN00196

Dayton Hollow Dam is a hydroelectric gravity dam on the Otter Tail River in Otter Tail County, Minnesota in the United States. It is located 5 miles southwest of the city of Fergus Falls. Completed in 1909, it is the first power plant built by the Otter Tail Power Company and is one of five dams on the river. Together, they produce about 3.5 megawatts of power.

Shortly after becoming operational, Dayton Hollow Dam narrowly avoided destruction. The city-owned Fergus Falls City Light Station, several miles upstream, abruptly failed in the early hours of September 24, 1909. Three other dams between the disaster site and Dayton Hollow were swept away and a fourth (Central / Wright) was badly damaged. Otter Tail Power Company president Vernon Wright received enough advance warning to reach his dam by 6:15 am and open the spillway. The only flood recorded in the history of the river was due to this disaster.[4]

The license for the hydroelectric plant expires on November 30, 2021. In June 2016 the company filed a pre-application with the Federal Energy Regulatory Commission to re-license the station with no changes to existing facilities or operations. The process will take 5 years.[5]