Dohazari Commuter
From Wikipedia, the free encyclopedia
| Overview | |
|---|---|
| Service type | Commuter |
| System | Bangladesh Railway |
| Status | Discontinued |
| First service | 6 February 2021 |
| Last service | 1 August 2023 |
| Current operator | East Zone |
| Route | |
| Termini | Chittagong Dohazari |
| Stops | 17 in both directions |
| Distance travelled | 40 km (25 mi) |
| Average journey time | 90 mins |
| Service frequency | Daily |
| Train number | Dohazari Commuter-1 to 4 |
| Lines used | |
| On-board services | |
| Seating arrangements | Yes |
| Sleeping arrangements | No |
| Auto-rack arrangements | No |
| Catering facilities | No |
| Observation facilities | Yes |
| Entertainment facilities | Yes |
| Baggage facilities | Yes |
| Technical | |
| Track gauge | 1,000 mm (3 ft 3+3⁄8 in) metre gauge mixed with 1,676 mm (5 ft 6 in) in Dual Gauge Layout |
| Operating speed | 45 km/h (28 mph) |
| Track owner | Ministry of Railways |
The Dohazari Commuter (Bengali: দোহাজারী কমিউটার) was a commuter train belonging to Bangladesh Railway – East Zone that runs between Chittagong and Dohazari railway station in Chittagong Division, Bangladesh.