Dongle Lu station
Foshan Metro Line 3 station
From Wikipedia, the free encyclopedia
Dongle Lu station (simplified Chinese: 东乐路站; traditional Chinese: 东樂路站; pinyin: Dōnglè Lù Zhàn; Cantonese Yale: Dūnglohk Lǒu Jaahm) is a station on Line 3 of Foshan Metro, located in Foshan's Shunde District.[1] It opened on 28 December 2022.[2][3]
Platform | |||||||||||||
| Chinese name | |||||||||||||
| Simplified Chinese | 东乐路站 | ||||||||||||
| Traditional Chinese | 东樂路站 | ||||||||||||
| |||||||||||||
| General information | |||||||||||||
| Location | Outside the intersection of Dongle Road (东乐路) and Huanshi East Road (环市东路), Daliang Subdistrict Shunde District, Foshan, Guangdong China | ||||||||||||
| Coordinates | 22°50′15.83″N 113°15′33.8″E | ||||||||||||
| Operator | Foshan Metro Operation Co., Ltd. | ||||||||||||
| Lines | Line 3 Line 11 (future) | ||||||||||||
| Platforms | 2 (1 island platform) | ||||||||||||
| Tracks | 2 | ||||||||||||
| Construction | |||||||||||||
Structure type | Underground | ||||||||||||
Platform levels | 2 | ||||||||||||
| Accessible | Yes | ||||||||||||
| Other information | |||||||||||||
| Station code | F306 | ||||||||||||
| History | |||||||||||||
| Opened | 28 December 2022 | ||||||||||||
| Services | |||||||||||||
| |||||||||||||
| |||||||||||||
Station layout
The Line 3 station has an island platform under Dongle Road.[4]
| G | - | Exits A-D |
| L1 Concourse |
Lobby | Ticket Machines, Customer Service, Shops, Police Station, Security Facilities |
| L2 Mezzanine |
- | Station Equipment |
| L3 Platforms |
Platform 1 | |
| Island platform, doors will open on the left | ||
| Platform 2 | 3 towards Shunde College Railway Station (Jurong Beilu) | |
| L4 Reserved Platforms |
11 reserved track area | |
| Reserved Island platform | ||
| 11 reserved track area | ||
Entrances/exits
The station has 4 points of entry/exit, located on the north and south sides of Dongle Road. Exits B and D are equipped with elevators.[1]

History
When Line 3 was approved in 2012, this station was set up at the intersection of Dongle Road and Xingui Middle Road.[5] In 2015, the planning of Line 3 changed, and the station was moved west to the intersection of Huanshi East Road, and Jurong Beilu station was established at the intersection of Jurong North Road on the east side of the original Dongle Lu station.[6][7] The relevant adjustment plan was approved by the Guangdong Provincial Development and Reform Commission on 28 March 2019.[8]
On 12 April 2017, the station began enclosure construction.[9] On 26 February 2019, the first tunnel boring machine of Line 3 departed from Daliang station (now Daliang Zhonglou station) and excavated to this station.[10] On 26 March 2021, the station started auxiliary entrance and exit construction and began the mechanical and electrical construction phase, and officially handed over the electrical operations three days later.[11] On 29 April the same year, the double line tunnel from this station to Daliang Zhonglou was short tracked.[12] On 27 May 2022, the site passed the project acceptance.[13] On 28 December the same year, the station opened with the opening of Line 3.[14]