Durg–Raipur–Arang Expressway
Road in Chhattisgarh, India
From Wikipedia, the free encyclopedia
Durg–Raipur–Arang Expressway is underconstructed 92 km (57 mi) long, six-lane, access-controlled greenfield expressway in the state of Chhattisgarh, India. The expressway is a part of Bharatmala Pariyojana, and will pass from Durg through Anjora, Patora, Supkona, Abhanpur and Naya Raipur before terminating at Arang.[1][2]
| Durg-Raipur-Arang Expressway | |
|---|---|
Durg–Raipur–Arang Expressway in red | |
| Route information | |
| Length | 92 km (57 mi) |
| Major junctions | |
| From | Tendesara, Rajnandgaon |
| To | Mahanadi Bridge, Arang |
| Location | |
| Country | India |
| Highway system | |
Status updates
- Aug 2020: The target date for completion of proposed expressway is set as March 2024.[3]
- Dec 2022 : Mehrotra Buildcon, and Shelke Constructions Led Joint Ventures Emerge As Lowest Bidders For the Expressway each with 46 km stretch Total 92 km[citation needed]
