E6 Series Shinkansen

Japanese high speed train type From Wikipedia, the free encyclopedia

The E6 series (Japanese: E6系) is a Japanese Shinkansen high-speed train type. It operates exclusively on Komachi services on the Akita Shinkansen, a mini-Shinkansen line between Akita and Morioka, at speeds of up to 130 kilometres per hour (81 mph). From Morioka, services continue to and from Tokyo on the Tōhoku Shinkansen, where the train is coupled or uncoupled from a Hayabusa service operated with an E5/H5 series train. Compared with the E3 series it replaced, the E6 series can operate at up to 320 kilometres per hour (200 mph) on the Tōhoku Shinkansen, up from 275 kilometres per hour (171 mph), reducing journey times by an average of 12 minutes. The trains were designed by Ken Okuyama.

Stock typeElectric multiple unit
In service2013–present
Manufacturers
DesignerKen Okuyama
Quick facts Stock type, In service ...
E6 series
E6 series set near Omiya Station
Stock typeElectric multiple unit
In service2013–present
Manufacturers
DesignerKen Okuyama
Family nameMini-Shinkansen
ReplacedE3 series
Constructed2010–2014
Entered service16 March 2013; 13 years ago (2013-03-16)
Number built168 vehicles (24 sets)
Number in service161 vehicles (23 sets)
Number scrapped7 vehicles (1 set; set Z9; earthquake damage)
Formation7 cars per trainset
Fleet numbersZ1Z24
Capacity338 (23 Green + 315 ordinary)
OperatorLogo of the East Japan Railway Company (JR East) JR East
DepotAkita
Lines served
Specifications
Car body constructionAluminium alloy
Train length148.65 m (487 ft 8 in)
Car length
  • End cars: 23.075 m (75 ft 8.5 in)
  • Intermediate cars: 20.5 m (67 ft 3 in)
Width2.945 m (9 ft 7.9 in)
Height3.65 m (12 ft)
Doors1 per side, per car
Maximum speed320 km/h (200 mph)
Weight306.5 t (676,000 lb)
Traction motors20 × 300 kW (400 hp) MT207 AC
Power output6,000 kW (8,000 hp)
Acceleration
  • Akita: 1.71 km/(h⋅s) (1.06 mph/s)
  • Tōhoku: 2.0 km/(h⋅s) (1.2 mph/s)
Electric systems
Current collectionPantograph
UIC classificationBo′Bo′+2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′+Bo′Bo′
Bogies
  • Motored: DT210
  • Trailer: TR7009
Safety systemsDS-ATC, RS-ATC, ATS-P
Multiple workingUp to two units, E5/H5
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Close

A total of 24 seven-car trainsets were built by Hitachi and Kawasaki Heavy Industries between 2012 and 2014.[1] The first set, numbered G1, was delivered in June 2010.

Operations

The 7-car E6 series trains operate in conjunction with E5 series or H5 series (since March 2016) 10-car trains, initially on just four return services daily from 16 March 2013.[2] They replaced all of the previous E3 series trains on Komachi services by 15 March 2014.[3]

Design

The overall styling was overseen by Japanese industrial designer Ken Okuyama, and is intended to evoke images from the cultural identity of Akita Prefecture, including Namahage demons and kantō festival lanterns.[4]

The body is finished in "Hiun" (飛雲) white, a crimson roof and a "arrow silver" bodyside stripe.[5]

The E6 series features a long, aerodynamically optimized nose to reduce tunnel boom and permit higher operating speeds. The nose is 13 metres (43 ft) long—7 metres (23 ft) longer than that of the E3 series it replaces—allowing E6 series operation on the Tōhoku Shinkansen at speeds increased from 275 to 320 kilometres per hour (171 to 199 mph).[5]

The design incorporates technology developed through the Fastech 360 experimental train and the E5 series, with which the E6 is designed to operate in coupled service on the Tōhoku Shinkansen. Like the E5, the E6 uses an "arrow-line" nose profile, first tested on the Fastech 360, to improve aerodynamic efficiency and reduce noise at high speeds.[6]

Trainsets are formed of seven cars, matching the seating capacity of six-car E3 series sets due to reduced seating in the end cars. All cars are equipped with active suspension to improve ride quality across varying track conditions and active tilting capability of up to 1.5 degrees to improve passenger comfort when operating at higher speeds.[5]

Formation

Pre-production set S12

The pre-series train, numbered "S12" (later becoming "Z1"), was formed as follows, with car 11 at the Tokyo end and car 17 at the Morioka end.[7]

More information Car No., Designation ...
Car No.11121314151617
Designation M1scTkM1TM1c
Numbering E611E628E625E625-100E627E629E621
Weight (t) 45.744.442.543.142.544.543.8
Seating capacity 233560686032
Close
  • Car 11 provides Green (first class) accommodation.
  • Cars 12 and 16 are each fitted with a single-arm pantograph.[8] Like the E5 series, only one pantograph is normally used in service.
  • Cars 11 to 14 were built by Kawasaki Heavy Industries, and cars 15 to 17 were built by Hitachi.[8]

Full-production sets Z2

The full-production trains, numbered "Z2" onward, are formed as follows, with car 11 at the Tokyo end and car 17 at the Morioka end.[9]

More information Car No., Designation ...
Car No.11121314151617
Designation M1scTkM1TM1c
Numbering E611E628E625E625-100E627E629E621
Weight (t) 45.144.441.741.842.144.243.4
Seating capacity 223460686032
Close
  • Car 11 provides Green (first class) accommodation.
  • Cars 12 and 16 are each fitted with a single-arm pantograph.[9]

Interior

The new trains feature similar improvements to passenger accommodation as featured on the E5 series trains, including AC power outlets, and security cameras in vestibule areas. Seating in both Standard class and Green (first class) cars is in the standard 2+2 arrangement for mini-shinkansen trains.[9] Seat pitch is 1,160 mm (46 in) in Green class and 980 mm (39 in) in Standard class, the same as for the E3 series trains.[5] Cars 12, 13, 14, and 16 are equipped with toilets.[9] The toilet in car 12 is universal access.[9]

History

Pre-production set S12 on test with E5 series set S11, July 2012

The pre-series set, S12, was delivered to Sendai Depot in June 2010,[10] and formally accepted by JR East on 8 July.[8] Test running commenced on the Tohoku Shinkansen in July 2010.[11]

The first full-production set was delivered in November 2012, with production continuing until spring 2014.[1]

Revenue service commenced on 16 March 2013 on new Super Komachi services, running at a maximum speed of 300 km/h (185 mph) on the Tohoku Shinkansen.[2] From 15 March 2014, the maximum speed was raised to 320 km/h (200 mph) on the Tohoku Shinkansen, with the maximum speed on the Akita Shinkansen tracks remaining at 130 km/h (80 mph), allowing journey times between Tokyo and Akita to be reduced by an average of 12 minutes.[3] The service name was also returned to simply Komachi.[3]

In May 2014, the E6 series was awarded the 2014 Laurel Prize, presented annually by the Japan Railfan Club.[12] The award presentation ceremony was held at Akita Station on 8 November 2014.[13]

Fleet list

Set Z9 hauled by an EH200 electric locomotive en route from the Kawasaki Heavy Industries factory in Kobe to Akita Depot, June 2013

As of 1 October 2014, 24 sets were in service, as shown below.[14]

More information Set number, Manufacturer ...
Set number Manufacturer Date delivered Date withdrawn Remarks
Z1 Hitachi/Kawasaki HI 8 July 2010 Pre-series set, originally numbered S12, modified February 2014
Z2 Kawasaki HI 19 November 2012 Full-production sets
Z3 3 December 2012
Z4 Hitachi 18 December 2012
Z5 14 February 2013
Z6 Kawasaki HI 14 March 2013
Z7 26 April 2013
Z8 18 May 2013
Z9 22 June 2013 April 2022 Withdrawn in April 2022 following damage sustained from the 2022 Fukushima earthquake.[15]
Z10 Hitachi 27 June 2013 Full-production sets
Z11 Kawasaki HI 12 July 2013
Z12 Hitachi 10 July 2013
Z13 Kawasaki HI 24 August 2013
Z14 Hitachi 30 August 2013
Z15 Kawasaki HI 14 September 2013
Z16 Hitachi 27 September 2013
Z17 Kawasaki 9 October 2013
Z18 Hitachi 25 October 2013
Z19 Kawasaki 1 November 2013
Z20 Hitachi 30 November 2013
Z21 Kawasaki 11 December 2013
Z22 21 January 2014
Z23 Hitachi 13 February 2014
Z24 3 April 2014
Close

While the first sets from both Hitachi and Kawasaki Heavy Industries were delivered by sea to Sendai, set Z9 was delivered from the Kawasaki Heavy Industries factory in Kobe by rail to Akita Depot over three days from 31 May to 2 June 2013, mounted on temporary narrow-gauge (1,067 mm gauge) bogies and hauled by freight locomotives.[16] This was followed by set Z11 from 21 to 23 June 2013.[17]

Accidents and incidents

E6 series set Z9, coupled with H5 series set H2 operating as Yamabiko 223 bound for Sendai derailed during the 2022 Fukushima earthquake while traveling between Fukushima and Shiroishi-Zaō stations. There were no injuries on board.[18][19]

See also

References

Related Articles

Wikiwand AI