Akita Shinkansen

High-speed railway line in Japan From Wikipedia, the free encyclopedia

The Akita Shinkansen (Japanese: 秋田新幹線) is a mini-Shinkansen route in Japan, operated by East Japan Railway Company (JR East). It provides service between Akita and Morioka over the Tazawako Line and Ōu Main Line. At Morioka, trains connect onto the Tōhoku Shinkansen tracks for through service to Tokyo.

Native name秋田新幹線
OwnerLogo of the East Japan Railway Company (JR East) JR East
LocaleIwate and Akita prefectures
Termini
Quick facts Overview, Native name ...
Akita Shinkansen
An E6 series trainset on the Akita Shinkansen
Overview
Native name秋田新幹線
OwnerLogo of the East Japan Railway Company (JR East) JR East
LocaleIwate and Akita prefectures
Termini
Stations6
Color on map     Crimson
Service
TypeMini-Shinkansen
ServicesKomachi
Operator(s)JR East
Depot(s)Akita
Rolling stockE6 series
History
Opened22 March 1997; 29 years ago (1997-03-22)
Technical
Line length127.3 km (79.1 mi)
Number of tracks1 and 2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationOverhead line, 20 kV 50 Hz AC
Operating speed130 km/h (81 mph)
Route map
Close

History

The groundbreaking ceremony for the Akita Shinkansen was held in front of Akita Station on 13 March 1992,[1] and track work began the same month.[2] JR East introduced a continuous track renewal machine imported from the United States—the first time such equipment was used in Japan—significantly reducing labor requirements and construction time.[3]

Construction proceeded in stages. A parallel single standard-gauge track was added to the 51.7-kilometre (32.1 mi) section of the Ōu Main Line between Ōmagari and Akita. In addition, on the 13-kilometre (8.1 mi) section between Jingūji and Mineyoshikawa, a third running rail was installed on one of the narrow-gauge tracks, allowing mini-Shinkansen trains to operate over either track. The final stage converted the 75-kilometre (47 mi) narrow-gauge Tazawako Line between Morioka and Ōmagari to standard gauge and included construction of a connecting ramp at Morioka linking to the Tōhoku Shinkansen, completed in December 1996.[2]

Following level-crossing problems that emerged after the opening of the Yamagata Shinkansen, 33 grade crossings (including pedestrian crossings) along the line were eliminated ahead of the Akita Shinkansen’s opening. As standard-gauge conversion progressed, all station buildings along the line were rebuilt, with the exception of Kakunodate Station which had been recently renovated, and a Shinkansen maintenance facility and storage tracks were constructed at the Minamiakita Depot (now the Akita Shinkansen Car Center).[4]

The segment between Morioka and Akita began operating on 22 March 1997[2] with five-car E3 series trains, with formations lengthened to six cars in 1998.

All services were suspended on 11 March 2011 following the 2011 Tōhoku earthquake and tsunami, with partial operation resuming between Morioka and Akita from 18 March, although through services to the Tōhoku Shinkansen did not initially operate. Through services to Tokyo were restored on 29 April 2011, coinciding with the full reopening of the Tōhoku Shinkansen.

E6 series trains were introduced on Super Komachi services from 16 March 2013, operating at up to 300 kilometres per hour (190 mph) on the Tōhoku Shinkansen, and from 15 March 2014 all Komachi services were operated by E6 series sets, running at up to 320 km/h (200 mph) on the Tōhoku Shinkansen.[5][6]

Services between Ōmagari and Akita were suspended from 22 to 29 July 2017 due to flooding after heavy rainfall. Services north of Nasushiobara Station were suspended on 13 February 2021 following the 2021 Fukushima earthquake.[7]

On 6 March 2025, following the uncoupling of HayabusaKomachi 21 near Nishi-Nippori Station, coupled operations with Hayabusa services were suspended until further notice, and passengers travelling between Tokyo and Akita were advised to transfer at Morioka Station.[8]

Operations

Services consist of Komachi trains which are 7-car E6 series mini-shinkansen sets coupled with E5 series Hayabusa trains for the portion of the journey between Tokyo and Morioka.

The Komachi services run at a maximum speed of 320 km/h (200 mph) on the Tohoku Shinkansen, and between Morioka and Akita, run as 7-car independent trains with a maximum speed of 130 km/h (80 mph).[9] However, 110 km/h (70 mph) is more typical for the line through the hills east of Akita, with trains frequently slowing to 90 km/h (55 mph) for curves such as those south of Ugo. The line from Morioka to Akita is prone to deep snow.

The fastest timetabled journey between Akita and Tokyo currently takes 3 hours and 37 minutes calling at four or five stops in between.

Rolling stock

As of March 2020, the following types are used on Akita Shinkansen services.

Former rolling stock

An E3 Series coupled with an E2 Series at Oyama Station
  • E3 series 6-car sets (originally 5-car sets) withdrawn by 15 March 2014

Non-revenue-earning-types

E926 East i train at Omiya Station, May 2001

Stations

Between Tokyo and Morioka, the stations are the same as the Hayabusa service on the Tōhoku Shinkansen. Between Morioka and Akita, the stations are as shown below.

Legend:

More information ●, ▲ ...
All trains stop
Some trains stop
Close
More information Station, Japanese name ...
Station Japanese name Distance (km) Komachi Transfers Location
From Tokyo From Morioka
Through service to/from Tokyo via the Tōhoku Shinkansen
Morioka 盛岡 535.3 0 Morioka Iwate
Prefecture
Shizukuishi 雫石 552.9 16.0      Tazawako Line Shizukuishi
Tazawako 田沢湖 579.4 40.1 Senboku Akita
Prefecture
Kakunodate 角館 600.0 58.8
Ōmagari 大曲 618.5 75.6
Daisen
Akita 秋田 670.2 127.3
Akita
Close

References

Related Articles

Wikiwand AI