Elektrougli

Town in Moscow Oblast, Russia From Wikipedia, the free encyclopedia

Elektrougli (Russian: Электроу́гли) is a town in Noginsky District of Moscow Oblast, Russia, located on the Moscow–Nizhny Novgorod railway, 36 kilometers (22 mi) east of Moscow and 18 kilometers (11 mi) southeast of Noginsk, the administrative center of the district. Population: 17,944(2021 census);[6] 20,136(2010 census);[2] 16,717(2002 census);[7] 18,645(1989 Soviet census).[8]

CountryRussia
Founded1899Edit this on Wikidata
Elevation
140 m (460 ft)
Quick facts Электроугли, Country ...
Elektrougli
Электроугли
In Elektrougli
In Elektrougli
Flag of Elektrougli
Coat of arms of Elektrougli
Interactive map of Elektrougli
Elektrougli is located in Russia
Elektrougli
Elektrougli
Location of Elektrougli
Elektrougli is located in Moscow Oblast
Elektrougli
Elektrougli
Elektrougli (Moscow Oblast)
Coordinates: 55°43′N 38°12′E
CountryRussia
Federal subjectMoscow Oblast[1]
Administrative districtNoginsky District[1]
TownSelsovietElektrougli[1]
Founded1899Edit this on Wikidata
Town status since1956
Elevation
140 m (460 ft)
Population
  Total
20,136
  Estimate 
(2024)
17,793 (−11.6%)
  Capital ofTown of Elektrougli[1]
  Municipal districtNoginsky Municipal District[3]
  Urban settlementElektrougli Urban Settlement[3]
  Capital ofElektrougli Urban Settlement[3]
Time zoneUTC+3 (MSK Edit this on Wikidata[4])
Postal code[5]
142455
OKTMO ID46751000011
Websitewww.elugli.ru
Close
Holy Trinity Temple in Elektrougli in 1994

Name

In 1899 was established "Elektrougli" (electric coals) factory.

History

Urban-type settlement status was granted to it in 1935. Town status was granted in 1956.[citation needed]

Administrative and municipal status

Within the framework of administrative divisions, it is, together with six rural localities, incorporated within Noginsky District as the Town of Elektrougli.[1] As a municipal division, the Town of Elektrougli is incorporated within Noginsky Municipal District as Elektrougli Urban Settlement.[3]

"Svetliy Gorod" and "Papillon" development projects

The 11th Radio Center of the Government Service For Time and Frequency used to be located next to the Svetliy (russian: Светлый, literally: "bright") block of the town. It was headed by the Main Meteorological Center, one of the Russian Institute of Physic-Technical and Radio-Technical Measurements' subdivisions, founded in 1955. Since 1965, three transmitters in Moscow, Novosibirsk and Irkutsk switched to a round-the-clock precise time and reference frequency transmission mode. In 2005, Moscow Regional Centre and Russian Institute of Physic-Technical and Radio-Technical Measurements specialists transferred three radio stations to another 3rd Radiocenter (located in Taldom, Severniy settlement). This transformation was carried out in 2006-2007.

In 2007, the construction of an expansion to the Svetliy block was projected, supposed to have taken place on the territories of the abandoned, unused radiocenter and its surroundings. The buildings in the new neighborhood would have varying floor count buildings, complete with the necessary infrastructure. On top of that, a cottage block, named "Papillon", was projected. The development project was put together by Sergei Tsitsin's architecture workshop, part of the "MonArch" concern, founded in 2003 by Sergei Ambartsumian, one of Vladimir Resin's, the head of the capital's building complex, deputees.

Another project to build a toll highway from Moscow to Orekhovo-Zuevo through Noginsk supported the attractiveness of the future neighborhood. Initially, the living area attained by constructing the neighborhood was to be transferred to Moscow's ownership, to later be divided among those queued up in social programs. But in 2009, Moscow announced having withdrawn from the project.

In the beginning of 2008, economist Yuriy Razovskiy expressed his concerns about the prospects of such an ambitious project, costing an estimated $1 billion. He highlighted the lack of modern sewage treatment, clean potable water, and adequate social and transport infrastructure in Elektrougli, as well as the absence of modern hospitals and maternity wards. According to him, it was all a matter of insufficient competence, when it all boiled down to a marketing campaign featuring nothing but billboards along the Nosovikninskoe highway.

By 2012, of all that was projected, only the foundation pit for one of the buildings of the first construction queue was dug. Busov, the head of Elektrougli, wrote everything off to the incompetence of the ex-head-contractor. From 2010 to 2012, a set of claims to the company behind the project were considered by Moscow's arbitration court. This led to 17 million rubles being transferred from the construction company to the architecture workshop.

References

Related Articles

Wikiwand AI