Wikiwand AI

Elkton station

Former railway station in Elkton, Maryland, US From Wikipedia, the free encyclopedia

Elkton station is a former passenger rail station located in Elkton, Maryland. The last passenger service to the station was Amtrak's Chesapeake from 1978 to 1983. The brick station building still remains along the Northeast Corridor tracks.

LocationBow Street, Elkton, Maryland
Coordinates39°36′47.76″N 75°49′53.45″W
OwnerAmtrak
Quick facts General information, Location ...
Elkton, MD
Elkton station photographed in 2014
General information
LocationBow Street, Elkton, Maryland
Coordinates39°36′47.76″N 75°49′53.45″W
OwnerAmtrak
LineAmtrak Northeast Corridor
Platforms2 side platforms
Tracks3
Construction
AccessibleNo
History
OpenedJuly 31, 1837 (first time)
April 30, 1978 (second time)
Closed1960s (first time)
October 29, 1983 (second time)
ElectrifiedJanuary 28, 1935[1] (ceremonial)
February 10, 1935[2] (regular service)
Former services
Preceding station Amtrak Following station
Perryville Chesapeake Newark, Delaware
Preceding station Pennsylvania Railroad Following station
North-East Philadelphia, Wilmington and Baltimore Railroad Iron Hill
Proposed services
Preceding station MARC Following station
Perryville Penn Line Newark
toward Wilmington
Location
Close

History

Pennsylvania Railroad

The 1935-built station included this southbound passenger shelter, with a pedestrian subway (grey grate under the canopy).

The Philadelphia, Wilmington, and Baltimore Railroad was completed from Wilmington to Baltimore in 1837 (save for the Susquehanna River ferry), with stops at most population centers including Elkton. A test train ran from Wilmington to Elkton on January 9, 1837, though service did not begin until July 31 of that year.[3] A replacement station was built in 1855.[4] The line became part of the Pennsylvania Railroad (PRR) in 1881.

The line originally ran on a tight curve through the town center, disrupting traffic and creating a collision hazard at grade crossings, as well as acting as a major speed restriction on express trains. In 1934, the PRR moved the line north of the downtown area to ease the curve and eliminate all grade crossings in Elkton. Construction on a new station began in February 1935 and was completed several months later. The new brick depot included baggage and waiting rooms, and a pedestrian passage under the tracks to the southbound platform.[4] By 1938 Elkton was served by 18 trains per day.[3]

Traffic declined after the construction of the Interstate Highway System; stopping service declined to three daily trains by 1963 and ended several years later.[3] The line passed to Penn Central and eventually to Amtrak with all trains passing Elkton without stopping.

Amtrak

An Amtrak train passes Elkton station in 1981

On April 30, 1978, Amtrak began operation of the Chesapeake, a once-daily commuter train between Philadelphia and Washington D.C., which included reopening several closed stations.[5]

On January 1, 1983, the obligation for Conrail to provide commuter service on rail lines it had taken over in 1976 ended. SEPTA Regional Rail took over Philadelphia-area lines, while Amtrak began operating service in Maryland under contract to MARC.[6] Now largely redundant to Amtrak intercity and MARC regional service, the Chesapeake was cut on October 30, 1983.[7] SEPTA's Wilmington/Newark Line ran as far south as Newark, Delaware, while MARC service ran as far north as Perryville, Maryland. Elkton station, the only station in the gap between the two, was abandoned.

Proposed MARC service

Plans to establish MARC service to Elkton and expand Maryland's commuter rail to Newark and Wilmington, Delaware are included in the June 2025 MARC Growth and Transformation Plan. The plan outlines opening a new Elkton station between 2031 and 2040. Elkton would be an expansion of the Penn Line, the most Eastward stop on the Penn Line. The beginning to pilot the Penn Line's expansion to Wilmington, DE is given the same timeline. The plan details that a fourth track on the Northeast Corridor from Wilmington, DE, then to its south, is required for the project.[8]

References

Related Articles

Timelines

Top Qs

Fact Checks