Erding Ring Closure

From Wikipedia, the free encyclopedia

Native nameErdinger Ringschluss
Line number5559
LocaleBavaria, Germany
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Erding Ring Closure
Planning overview from Bavarian Transport Ministry with Erding Ring Closure, S-Bahn expansion and Walpertskirchen Link
Overview
Native nameErdinger Ringschluss
Line number5559
LocaleBavaria, Germany
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification15 kV/16.7 Hz AC overhead catenary
Route map

40.7
Freising
(446 m)
40.0
36.2
Pulling
33.5
2.2
Neufahrn-Nord
1.5
0.8
0.6
0.0
33.4
Neufahrn-Ost
33.5
Mintraching
33.8
B 11
37.4
37.9
30.1
Flughafen-West
30.8
Besucherpark
32.5
27.5
Munich Airport
24.8
23.9
Schwaigerloh
(443 m)
23.3
Wendeanlage
20.3
St2580 (Airport East Tangent)
19.8
Central Isar Canal
15.8
9.5
Walpertskirchen Link junction
8.7
15.2
8.6
14.7
8.4
Route 2082 from Moosburg
14.3
8.2
Erding-Fliegerhorst station
(460 m)
14.2
13.8
13.6
Erding
(464 m)
12.9
Sempt
12.3
Altenerding
10.0
Aufhausen
6.4
St. Koloman
5.0
Wifling
3.3
Ottenhofen
0.0
Markt Schwaben
(508 m)
7.6
Walpertskirchen Link
0.0
to Mühldorf
Source: German railway atlas[1]

The Erding ring closure (German: Erdinger Ringschluss) is a project to build a 30.2-kilometre (18.8 mi) long, double-track railway that is planned to run from Freising via Munich Airport to Erding.

"Neufahrn counter curve" (Neufahrner Gegenkurve)

Line 5559 would run from Freising station as a four-track line together with line 5500 (the Munich–Regensburg railway) to Neufahrn North junction (Abzweig Neufahrn-Nord). It would run over the "Neufahrn counter curve" (Neufahrner Gegenkurve) to reach line 5557 (the Neufahrn Link) at Neufahrn East junction (Abzweig Neufahrn-Ost) and connect with line 5556 (Munich East–Munich Airport railway) at Airport West junction (Abzweig Flughafen-West). From there the existing double-track line would be shared through the airport. The route from Freising to Munich Airport is 16.3 kilometres (10.1 mi) long.

The route would continue under the eastern apron of Munich Airport in a tunnel until it resurfaces near Schwaigerloh. It would then run above ground to Erding. In the Schweigerloh area it is intended to build a system for turning trains, so trains coming from Regensburg or Landshut to stop at the airport could be reversed.

After another 13.2 kilometres (8.2 mi) a junction station would be built on the grounds of the Erding Air Base that can accommodate both Munich S-Bahn trains and regional trains from the southeast using the “Walpertskirchen link” (Walpertskirchener Spange). The current station in the centre of Erding, which is 700 metres away, would then be closed. Trains would continue towards Munich on the existing Markt Schwaben–Erding railway. The section between the Altenerding station and the current Erding Station would be tunneled or lowered in order to avoid congestion at two level crossings (Haager Straße and Dorfener Straße). The resulting open space is planned to be redeveloped as residential and green areas.

Bridge of the Neufahrn counter curve over the highway A92, March 2017

The main construction work began in early October 2014. The line opened in late 2018 with regular train services commencing in December 2018.[2]