The Escalante Solar Project is a 240 MWAC (315 MWp) photovoltaic power station located about 5 miles north of the town of Milford in Beaver County, Utah. The project was developed by SunEdison, built by Mortenson Construction, and commissioned in September 2016.[1] The power is being sold under three separate 20-year power purchase agreements to Rocky Mountain Power which serves customers in Utah, Idaho, and Wyoming. At 1900 acres (3.0 sq miles), it is the largest grouping of photovoltaic generators in the state of Utah.[2][3][4]

CountryUnited States
Coordinates38°30′03″N 113°01′48″W
StatusOperational
Quick facts Country, Location ...
Escalante Solar Project
CountryUnited States
LocationBeaver County
Coordinates38°30′03″N 113°01′48″W
StatusOperational
Construction beganJuly 2015
Commission dateAugust 2016
Construction cost~$488 million
OwnerDominion Renewable Energy
OperatorSwinerton Renewable Energy
Solar farm
TypeFlat-panel PV
single-axis tracking
Site area1,900 acres (7.69 km2)
Power generation
Nameplate capacity315 MWp, 240 MWAC
Capacity factor29.4% (average 2017-2019)
Annual net output619 GW·h, 326 MW·h/acre
Close

Project details

The project is located adjacent to the 306 MW Milford Wind facility. Planning was initiated by the independent renewable energy developer First Wind (founded 2002) which began expanding into photovoltaic energy around 2012.[5] The Escalante project comprises the majority of the 320 MW Four Brothers Project, which includes the three co-located 80 MW Escalante units and the 80 MW Enterprise unit located 25 miles west of Cedar City, Utah in Iron County. The land area for each unit ranges from 600 to 700 acres.[2]

First Wind and its extensive portfolio of assets in western Utah were acquired by SunEdison and its TerraForm Power yield co in November 2014.[6] Beginning construction at the time was the 20.2 MW Seven Sisters Project, a dispersed set of ~3 MW facilities throughout Beaver and Iron counties.[7][8] To finance construction of Four Brothers, SunEdison entered into a joint venture with Dominion Resources. The resulting entity, Dominion Renewable Energy, utilized $150 million from SunEdison and $500 million from Dominion to start construction in July 2015.[9] Likewise, the two companies extended their joint venture to construct the 210 MW Three Cedars Project, which consists of three similarly sized facilities dispersed to the west of Cedar City, on about the same timeline.[10]

Four Brothers was built by Mortenson Construction.[11] SunEdison provided about 1.3 million crystalline silicon solar panels from its team of international suppliers. Work progressed simultaneously at all four sites, employed an estimated 500 workers, and was completed in September 2016.[1] Along with the electricity to power about 90,000 homes, Four Brothers is expected to produce $66 million in property and income taxes for the region over 20 years.[9] The completed facilities are operated and maintained by Swinerton Renewable Energy.[12]

SunEdison filed for Chapter 11 bankruptcy protection on April 21, 2016, but was able to complete the project on time with its receipt of $300 million in bankruptcy debt financing.[13] On September 13, 2016 the company was forced to sell its stake in the completed facilities in a fire sale. NRG Energy was the successful bidder.[14]

Electricity production

More information Year, Total Annual MW·h ...
Total Facility Generation
(Annual Sum from All Units Below)
YearTotal Annual MW·h
2016 277,275
2017 624,023
2018 619,088
2019 613,269
Average (2017-2019) 618,793
Close
More information Year, Jan ...
Generation (MW·h) of Escalante Solar 1 [15]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
2016 12,22718,90420,25015,27011,1787,511 85,340
2017 8,35512,34618,48920,30624,20226,46019,71418,89416,88817,76412,22011,184 206,822
2018 10,61112,47916,13719,55622,53624,21821,10921,07620,25615,10512,4519,015 204,549
2019 10,66911,24216,74819,71620,99023,61022,34822,75018,77918,45911,4738,362 205,146
Average Annual Production (years 2017-2019)205,506
Close
More information Year, Jan ...
Generation (MW·h) of Escalante Solar 2 [16]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
2016 2,58418,38420,47520,16914,35411,0027,467 94,435
2017 8,45312,49118,70720,54524,48726,77219,94619,11617,08717,97312,36411,316 209,256
2018 10,79012,69016,40919,88622,91624,62721,46621,43220,59815,36012,6619,167 208,002
2019 10,59311,16216,62819,57520,84023,44122,18822,58718,64518,32711,3918,303 203,681
Average Annual Production (years 2017-2019)206,980
Close
More information Year, Jan ...
Generation (MW·h) of Escalante Solar 3 [17]
YearJanFebMarAprMayJunJulAugSepOctNovDecTotal
2016 4,49620,20220,00419,71315,13810,7577,191 97,501
2017 8,40012,41318,58920,41624,33426,60419,82118,99616,98017,86012,28711,245 207,945
2018 10,71412,60016,29319,74622,75524,45421,31421,28120,45315,25212,5729,103 206,537
2019 10,63311,20416,69019,64820,91823,52922,27122,67218,71518,39611,4338,334 204,442