Fenghuang Xincun station
Guangzhou Metro station
From Wikipedia, the free encyclopedia
Fenghuang Xincun Station (Chinese: 凤凰新村站) is a station on Line 8 of the Guangzhou Metro. The underground station is located on Gongye Avenue North (工业大道北) in the Haizhu District. The station opened on November 3, 2010 after a delay caused by the cooling tower at Shayuan Station.[1] It was the terminus of the line until December 28, 2019 when the line was extended to Cultural Park station.
SimplifiedChinese凤凰新村站
TraditionalChinese鳳凰新村站
Literal meaningFenghuang New Village Station
Hanyu PinyinFènghuáng Xīncūn Zhàn
Platform 2 | |||||||||||
| Chinese name | |||||||||||
| Simplified Chinese | 凤凰新村站 | ||||||||||
| Traditional Chinese | 鳳凰新村站 | ||||||||||
| Literal meaning | Fenghuang New Village Station | ||||||||||
| |||||||||||
| General information | |||||||||||
| Location | Gongye Avenue North (工业大道北) and Nantian Road (南田路) Haizhu District, Guangzhou, Guangdong China | ||||||||||
| Coordinates | 23°05′51″N 113°15′02″E | ||||||||||
| Operator | Guangzhou Metro Co. Ltd. | ||||||||||
| Line | Line 8 | ||||||||||
| Platforms | 2 (1 island platform) | ||||||||||
| Construction | |||||||||||
Structure type | Underground | ||||||||||
| Other information | |||||||||||
| Station code | 816 | ||||||||||
| History | |||||||||||
| Opened | 3 November 2010 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Station layout
| G | - | Exits |
| L1 Concourse |
Lobby | Customer Service, Shops, Vending machines, ATMs |
| L2 Equipment Area |
- | Station equipment |
| L3 Platforms |
Platform 1 | |
| Island platform, doors will open on the left | ||
| Platform 2 | 8 towards Wanshengwei (Shayuan) | |
Entrances/exits
The station has 3 points of entry/exit. Exit D was opened on 9 January 2026.[2]
Exit A is accessible via stairlift.
- Exit A
- Exit B
- Exit D
