Fuzhou Metro

Rapid transit system in Fuzhou, China From Wikipedia, the free encyclopedia

The Fuzhou Metro (simplified Chinese: 福州地铁; traditional Chinese: 福州地鐵; pinyin: Fúzhōu Dìtiě) is a rapid transit system in Fuzhou Metropolitan Area, Fujian Province, China. The first line was planned to open in 2014.[2] Due to the construction difficulties and accidental archaeologic finding, the southern section (9.76 km (6.06 mi)) was delayed to 2016 and the northern section (15.13 km (9.40 mi)) was delayed to 2017.[3] Currently, the Fuzhou Metro Network consists of five lines. They are operated by Fuzhou Metro Group (Lines 1, 4, 5, 6), and Fuzhou CETC Rail Transit Company (Line 2), respectively.

LocaleFuzhou, Fujian Province, China
Transit typeRapid transit
Number of lines6
Number of stations116
Quick facts Overview, Locale ...
Fuzhou Metro
Overview
LocaleFuzhou, Fujian Province, China
Transit typeRapid transit
Number of lines6
Number of stations116
Daily ridership1,480,600 (31/12/2025 peak, highest record)[1]
Websitehttp://www.fzmtr.com
Operation
Began operationMay 18, 2016; 9 years ago (2016-05-18)
Operator(s)Fuzhou Metro Group (Lines 1, 4, 5, 6, Binhai Express)
Fuzhou CETC Rail Transit Co., Ltd. (Line 2)
Technical
System length210.3 kilometres (130.7 mi)
System map

Close
SimplifiedChinese福州地铁
TraditionalChinese福州地鐵
Hanyu PinyinFúzhōu Dìtiě
Hanyu PinyinFúzhōu Dìtiě
Quick facts Simplified Chinese, Traditional Chinese ...
Fuzhou Metro
Simplified Chinese福州地铁
Traditional Chinese福州地鐵
Transcriptions
Standard Mandarin
Hanyu PinyinFúzhōu Dìtiě
Eastern Min
Fuzhou BUCHók-ciŭ dê-tiék
Close

Fuzhou Metro was approved for construction on 3 June 2009. Trial service closed to the public began on 30 December 2015 and lasted for three months.[4] The first operational line (the south section of Line 1 from Sanchajie Station to Fuzhou South Railway Station) started service on 18 May 2016.[5] As of January 2024, Fuzhou Metro has 167.5 km of route and 119 stations open to service.

Lines

Map of Fuzhou Metro

Network

More information Line, Terminals (District/County) ...
Line Terminals
(District/County)
Opening Year Latest
Extension
Length
km
Stations
 1  Xiangfeng
(Jin'an)
Sanjiangkou
(Cangshan)
2016 2020 29.84 25
 2  Suyang
(Minhou)
Yangli
(Jin'an)
2019 30.629 22
 4  Banzhou
(Cangshan)
Difengjiang
(Cangshan)
2023 2025 28.4 23
 5  Jingxi Houyu
(Minhou)
Fuzhou South Railway Station
(Cangshan)
2022 2023 27.7 20
 6  Pandun
(Cangshan)
Wanshou
(Changle)
2022 31.346[6] 14
 Binhai Express 
( F1 )
Fuzhou Railway Station
(Jin'an)
Wenling
(Changle)
2025 62.4 12
Total 210.3 116
Close

Line 1

The south section of Line 1 started service on May 18, 2016, the north section of the first phase opened on January 6, 2017, the second phase opened on December 27, 2020. This first phase is 24.89 km in length with 21 stations from Xiangfeng to Fuzhou South Railway Station. The second phase is 4.92 km in length with 4 stations from Fuzhou South Railway Station to Sanjiangkou.

Line 2

The construction of Line 2 started on November 28, 2014. Line 2 is a 30.629 km long west-to-east line with 22 stations. The line opened on 26 April 2019. Line 2 operated by Fuzhou CETC Rail Transit Co., Ltd. under PPP contract. It's responsible for investment, construction, operation and maintenance of Line 2, with a concession period of 27 years effective from 30/11/2016.[7]

Line 4

The first section of Line 4 started service on August 27, 2023. This first phase is 27.7 km in length with 19 stations from Fenghuangchi to Difengjiang transfer for Line 5. The second section opened on December 10, 2025. It is 4 km in length with 4 stations from Fenghuangchi to Banzhou.

Line 5

The first phase of Line 5 starts at Jingxi Houyu and end at Ancient Luozhou Town. It is 22.4 km long with 17 stations. Construction of this line started in September 2017.[8] The line opened on 29 April 2022.[9] And the second phase from Ancient Luozhou Town to Fuzhou South Railway Station which opened at August 27, 2023 together with Line 4.

Line 6

The first phase of Line 6 starts at Pandun and end at Wanshou. It is 31.346 km long with 16 stations.[6] Construction of this line started in November 2016. The line opened on 28 August 2022.[10]

Future expansion

More information Planned opening date, Route ...
Planned opening date Route Terminals Length (km) Stations Status Notes
2026  2  East Extension Yangli Mawei Port 16.88 10 Under construction
2026  6  East Extension Wanshou Shibakongzha 5.34 5 Under construction [11]
TBC  3  Zhanban Wushan 32.4 23 Proposed
 4  Phase II Difengjiang Hongtang 13.3 8 Proposed
 6  West Extension Hongtang Pandun 14.4 10 Proposed
 8  Qingqi Fuzhou South Railway Station 42.2 26 Proposed
 S1  Xiangqian Fuqing Railway Station 35.8 9 Proposed
Close

Under construction

Line 4

Line 4 is planned to be 28.4 km in length and will have 23 stations. This line will start at Banzhou and end at Difengjiang. The budget for constructing this line is 18.436 billion yuan and the planned construction period is 2017–2022.[8] The construction of this line started in December 2017. The first part started operation in August 2023.[12]

Planned

Line 3

Line 3 is planned to be 27.2 km long with 22 stations. This line will start at Houban and end at Nanyu Town via Fuzhou Railway Station and Paiwei Road.

Line 7

Line 7 is reserved for Binhai New Area. It is planned to start at Jinfeng Town, Changle County and end at Jiangtian Town.

Line 8

Line 8 is planned to be 49.9 km in length with 19 stations, linking the University Town, Technology Town and Changle.[13]

Line 9

Line 9 will mainly serve Binhai New Area and Changle New Town. The length of this line is expected to be 24.4 km with 17 stations.[13]

Tickets and fares

Tickets

Single journey tickets

The single journey tickets of Fuzhou Metro are red plastic RFID tokens. The logo of Fuzhou Metro and the words "Metro Fuzhou" are shown in the center of the tokens. The English and Chinese words of "Fuzhou Urban Rail Transit" are shown on the edges of the tokens. The tickets can be purchased from the automatic ticketing machines. When entering the stations, passengers tap the token against a scanner. When exiting, the token is inserted into a slot for recycling.

Smart cards

The smart cards for public transportation named "Rongcheng Universal Card" can be used to ride Fuzhou Metro. Rongcheng Universal Cards can be purchased at all metro stations and several service centers in the city. The cards can also be used to pay for public buses.

In addition, China T-Union cards also can be used to ride Fuzhou Metro, but the cards are without discount on the ride.

QR Code

QR Code is available for Fuzhou Metro. Passenger can use QR code in two mobile applications named "e-Fuzhou" and "Mashangxing" to take metro. From 25 January 2021, Alipay and UnionPay are also available for Fuzhou Metro.

Fares

The fares are based on distances.[14]

More information Fares (RMB/Trip), +1 ...
Fares (RMB/Trip)
2
3
4
5
6
+1
Total Distance (km)
0-5
5-10
10-15
15-22
22-29
>29
Span (km)
-
5
5
7
7
9
Close

Infrastructure

Train of Fuzhou Metro

Rolling stock

The Model-B trains are used for Line 1. This kind of train consists of 6 cars with 256 seats and has a capacity of around 1,500 passengers. There are 28 trains ordered for Line 1, the first few of which were produced by CNR Tangshan Railway Vehicle Co., Ltd. in April 2015.

More information Line, Train-set ...
Line Train-set Train-type Max Speed Numbers Producer Signal Power First Train Delivery Year
 1  6-car B 80km/h 28 CRRC Tangshan CRSC & Siemens DC 1500V 2015
 2  6-car B 80km/h 31 CRRC Tangshan Nriet & Siemens DC 1500V 2018
 4  6-car B 80km/h 32 CRRC Tangshan Nriet & Siemens DC 1500V 2022
 5  6-car B 80km/h 22 CRRC Tangshan Nriet & Siemens DC 1500V 2021
 6  4-car B 100km/h 17 CRRC Tangshan Nriet & Siemens DC 1500V 2020
 Binhai Express  4-car Intercity-A 140km/h 30 CRRC Tangshan Nriet & Siemens AC 25kV Expected in 2025
Close

Accessibility

Vertical elevators

All Fuzhou Metro stations are equipped with vertical elevators from the platform to the concourse, and from the concourse to the ground level.

Platform pedals

Pedals for wheelchairs are available at all platforms, and passengers in need can ask staff for assistance.

Blind lanes

Blind lanes are available from the entrances to the platforms at all stations.

Others

Accessible restrooms are available in all stations. The accessible restrooms are equipped with mirrors that tilt down for wheelchair users and multiple grab handles.

Nursing rooms are available in some high-traffic stations, which provide nursing bottle warming and disinfection machines, nursing tables, automatic hand-washing sinks, emergency call devices and other equipment.

Network map

See also

References

Related Articles

Wikiwand AI