Garrison Crossing

Bridge in Ontario, Canada From Wikipedia, the free encyclopedia

The Garrison Crossing (formerly named Fort York Pedestrian and Cycle Bridge), located in downtown Toronto, provides a link between Stanley Park in the north and the Garrison Common of the Fort York grounds in the south. The crossing includes two stainless steel bridges over rail corridors.[1] The bridges form an important pedestrian and cyclist link to the Waterfront that also connects three parks - Ordnance Park, South Stanley Park with the Fort York neighbourhood.

Coordinates43.638928°N 79.407793°W / 43.638928; -79.407793
CarriesPedestrian and bicycles
CrossesRailway corridors
LocaleToronto, Ontario, Canada
Quick facts Coordinates, Carries ...
Garrison Crossing
Coordinates43.638928°N 79.407793°W / 43.638928; -79.407793
CarriesPedestrian and bicycles
CrossesRailway corridors
LocaleToronto, Ontario, Canada
Other name(s)Fort York Pedestrian and Cycle Bridge
OwnerCity of Toronto
Maintained byCity of Toronto
Characteristics
Designarch bridge
MaterialStainless steel
Total length52 m
Width5 m
Longest span52 m
No. of spans3
History
ArchitectDTAH
DesignerPedelta Structural Engineers
Engineering design byJuan Sobrino
Constructed byDufferin Construction
Fabrication byMariani Metal
OpenedOctober 1st, 2019
Location
Garrison Crossing is located in Toronto
Garrison Crossing
Location on a map of Toronto
Close

History

The project was first initiated in the early 2000s and was canceled for cost reasons. In 2014, the council approved the project procured as a Design-Build project directed by CreateTO, the City of Toronto's real estate and development corporation, with a budget of $19.7-million. The project was awarded to Dufferin Construction with a stainless-steel bridge project, the first of its kind in Canada.[2][3] The project was completed in October 2019.[4][5]

Design

The two bridges are constructed of a single stainless-steel arch rib of triangular shape utilizing standard hot-rolled stainless-steel plates that suspend the deck by a network arrangement of stainless-steel hangers. The arch ribs are titled outwards in opposite direction. The deck is a trapezoidal stainless-steel box girder with ribs on one side. The steel box is connected to a top concrete slab that uses stainless-steel reinforcement.

The north bridge is a 52 m long through arch bridge, while the south bridge is a one-span arch connected to a V-shape pier on the south end to accommodate the 5 m elevation difference between the two ends. The South Bridge landing includes a 58 m long structural concrete ramp on the west side terminating in a cantilevered lookout on the east side.

view of the South Bridge looking north (October 2019)

Construction

Construction started in August 2016. The two bridge structures were hoisted into place by a 660-ton crawler crane in the summer and fall of 2018[6][7] and were completed in October 2019.

Awards

2019 Award of excellence - Bridge category. Ontario Steel Design Awards. Canadian Institute of Steel Construction.

2020 Award of design excellence. Association of Canadian Consulting Engineers.