Czech natural gas pipeline From Wikipedia, the free encyclopedia

Gazela (Czech: plynovod Gazela) is a natural gas pipeline in the Czech Republic. It is operated by Net4Gas, a company owned by Allianz Capital Partners and OMERS Infrastructure. The project costs around €400 million.[1]

General directionnorth–south
Passes throughMladotice
Chomutov
Quick facts Location, Country ...
Gazela
Map of Gazela
Location
CountryCzech Republic
General directionnorth–south
FromHora Svaté Kateřiny
Passes throughMladotice
Chomutov
ToRozvadov/Waidhaus
General information
TypeNatural gas
OperatorNet4Gas
Construction started14 October 2010
Commissioned14 January 2013
Technical information
Length166 km (103 mi)
Maximum discharge33×10^9 m3/a (1.2×10^12 cu ft/a)
Diameter1,422 mm (56 in)
Close

History

Construction started on 14 October 2010 in Krušné Hory, north Bohemia.[2] It was constructed by Russian Stroytransgaz.[3][4]

The pipeline was officially opened on 14 January 2013.[5]

Route

The pipeline connects the north Bohemian town of Hora Svaté Kateřiny and Rozvadov/Waidhaus on the Czech–German border. These are natural gas border delivery stations by which Russian gas is transported from the Czech Republic to Germany. In north the Gazela pipeline is connected to the OPAL pipeline, a connection pipeline to Nord Stream 1.[6]

There were three possible route options with the length from 166 to 235 kilometres (103 to 146 mi).[7] It was decided to construct the pipeline in the 166 kilometres (103 mi) long route along the existing gas pipelines. The pipeline will divert from the existing pipelines only in the MladoticeChomutov section.[8]