Ghormara railway station
Railway station in Jharkhand
From Wikipedia, the free encyclopedia
Ghormara Railway Station is a railway station on the Jasidih–Dumka–Rampurhat line under the Asansol railway division of the Eastern Railway. It is situated at Ghormara, Deoghar district in the Indian state of Jharkhand.[1] It has 3 platforms, out of which the trains mostly comes on platform no 1 and 2.
LocationGhormara, Deoghar district, Jharkhand
India
India
Coordinates24.442298°N 87.86392°E
Elevation252 metres (827 ft)
SystemIndian Railways station
Ghormara Railway Station | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| General information | |||||||||||
| Location | Ghormara, Deoghar district, Jharkhand India | ||||||||||
| Coordinates | 24.442298°N 87.86392°E | ||||||||||
| Elevation | 252 metres (827 ft) | ||||||||||
| System | Indian Railways station | ||||||||||
| Owned by | Indian Railways | ||||||||||
| Line | Jasidih–Dumka–Rampurhat line | ||||||||||
| Platforms | 3 | ||||||||||
| Tracks | 1 (Single diesel line) | ||||||||||
| Construction | |||||||||||
| Structure type | Standard (on-ground station) | ||||||||||
| Bicycle facilities | No | ||||||||||
| Other information | |||||||||||
| Status | Functioning | ||||||||||
| Station code | GRMA | ||||||||||
| Zone(s) | Eastern Railway | ||||||||||
| Division(s) | Asansol | ||||||||||
| History | |||||||||||
| Opened | 2014–15 | ||||||||||
| Electrified | No | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Jasidih–Dumka–Rampurhat line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History
Jasidih Junction to Dumka railway line became operational on 12 July 2011[2] and Dumka to Ambajora Shikaripara track was set up in June 2014. The track from Rampurhat to Pinargaria became operational on 25 November 2012. The complete single railway route from Dumka to Rampurhat, including Ghormara railway station became operational on 4 June 2015.[3][4][5]
