Godavari Sunrise Convention Center

Convention center in Kathmandu, Nepal From Wikipedia, the free encyclopedia

Godavari Sunrise Convention Center (Nepali: गोदावारी सनराइज सम्मेलन केन्द्र) is the second largest convention center of Nepal. The assembly hall was constructed in 43 Ropanis (approx 21875 m2)of land at a cost of NPR 810 million.[1] The assembly hall has the capacity of 3000 people. The center was inaugurated by KP Sharma Oli in 2021.[2]

Coordinates27.5954°N 85.3742°E / 27.5954; 85.3742
Opened2021 (2021)
Quick facts Address, Coordinates ...
Godavari Sunrise Convention Center (Godawari Sunrise Samelan Kendra)
Godavari Sunrise Convention Center (Godawari Sunrise Samelan Kendra) is located in Kathmandu
Godavari Sunrise Convention Center (Godawari Sunrise Samelan Kendra)
Godavari Sunrise Convention Center (Godawari Sunrise Samelan Kendra)
Location within Kathmandu valley
Godavari Sunrise Convention Center (Godawari Sunrise Samelan Kendra) is located in Bagmati Province
Godavari Sunrise Convention Center (Godawari Sunrise Samelan Kendra)
Godavari Sunrise Convention Center (Godawari Sunrise Samelan Kendra)
Godavari Sunrise Convention Center (Godawari Sunrise Samelan Kendra) (Bagmati Province)
Godavari Sunrise Convention Center (Godawari Sunrise Samelan Kendra) is located in Nepal
Godavari Sunrise Convention Center (Godawari Sunrise Samelan Kendra)
Godavari Sunrise Convention Center (Godawari Sunrise Samelan Kendra)
Godavari Sunrise Convention Center (Godawari Sunrise Samelan Kendra) (Nepal)
AddressGodawari, Lalitpur, Lalitpur, Bagmati Province, Nepal
Coordinates27.5954°N 85.3742°E / 27.5954; 85.3742
OwnerGovernment of Nepal
Construction
Opened2021 (2021)
Close

Architecture and facility

The main building of the center has been designed as symbol of rising sun [2] and occupies about 27% of total land.[3] The main hall is 28 m high and has a capacity of 3000 people. There is garden with area of 16 Ropanis (8140 m2) and has a parking area of 13 Ropanis (6614 m2).[3]

Construction

The building was scheduled to be built by November 12, 2020, but it was delayed due to COVID19.[4][5]

It was constructed by KC-Samanantar JV.[3]

See also