Goyder South Wind Farm
Wind farm under construction in South Australia
From Wikipedia, the free encyclopedia
Goyder South Wind Farm is the first part of Neoen's Goyder Renewables Zone[1] development near Burra, South Australia. The Goyder South Wind Farm will be on the hills south-east of the town of Burra.
| Goyder South Wind Farm | |
|---|---|
![]() | |
| Country |
|
| Coordinates | 33°45′S 138°55′E |
| Owner | |
| Wind farm | |
| Type | |
| Rotor diameter |
|
| Power generation | |
| Units under const. | 75 × 5.5 MW |
| Nameplate capacity |
|
| External links | |
| Website | goyderenergy |
Early construction works for Stage 1 began in December 2021. The project is owned by Neoen and the construction contract was awarded to a consortium of GE Renewable Energy and Elecnor.[2]
Generation capacity of Stage 1 is anticipated to be 412MW. The Government of the Australian Capital Territory has signed a 14-year contract for 100MW of electricity from the first phase of Stage 1, and BHP signed a 70 MW baseload renewables contract for phase 2 to power its Olympic Dam mine.[3] Neoen’s 238.5 MW / 477 MWh Blyth Battery in South Australia will balance power for the mine. Goyder South Stage 1 consists of 75 GE 5.5-158 Cypress wind turbines, with a new transmission line to connect to the Robertstown substation. First power came online in April 2024,[4] and the facility was fully operational in late 2025.[5][6]
Neoen gave 1,000 hectares at World’s End Gorge to the South Australian government in 2023, paving the way for a new national park along with the Hopkins Creek Conservation Park in Ngadjuri country.[7]
The 238.5 MW / 477 MWh Blyth grid battery operates in 2025 to balance power for the mine.[8][9]
The Goyder South Wind Farm replaced the 119 MW Stony Gap Wind Farm which had initially been proposed for the same area, originally by EnergyAustralia[10] who sold it to Palisade Investment Partners in 2017[11] before Neoen bought the proposal in September 2019 and included it in the larger plan for Goyder Renewables Zone.[12] Goyder wind farm(s) was sold to Brookfield in 2024.[5]
The 600 MW Goyder North wind farm with a 226 MW / 866 MWh MWh battery is planned for the north side of the Goyder Highway,[5] and construction of the battery started in late 2025.[13]