Greater Jakarta Integrated Mass Transit System

Rail transportation network in the Jakarta From Wikipedia, the free encyclopedia

The Greater Jakarta Integrated Mass Transit System is an integrated transport network that primarily serves the area of Jakarta metropolitan area and surrounding areas. The system commenced operations in December 2017 with the introduction of commuter rail service on the existing rail between Jakarta and satellite cities. The system have since expanded and currently consists of 11 fully operating rail lines in a radial formation; five commuter rail lines, one airport rail link line to the Soekarno Hatta International Airport's (SHIA) Terminal 1, Terminal 2, and Terminal 3, four rapid transit lines, fourteen bus rapid transit line and one high speed rail line to Bandung. The system encompasses 654.5 kilometres (406.7 mi) of grade-separated railway with 371 operational stations.

Native nameSistem Angkutan Massal Terpadu Jabodetabek (Indonesian)
Number of lines25
Quick facts Overview, Native name ...
Greater Jakarta Integrated Mass Transit System
Jakarta MRT Jabodebek LRT Jakarta LRT Jakarta Commuter rail Whoosh Transjakarta
Jakarta MRT
Jakarta LRT
Jabodebek LRT
Soekarno–Hatta Airport Line
KAI Commuter
Transjakarta
Whoosh
Overview
Native nameSistem Angkutan Massal Terpadu Jabodetabek (Indonesian)
LocaleGreater Jakarta, Indonesia
Transit typeRapid Transit, Commuter Rail, Light Rapid Transit, Airport Rail Link, High Speed Rail & Bus Rapid Transit
Number of lines25
Number of stations371
Daily ridershipIncrease2.299 million (Average, 2025)
Increase2.139 million (Average, 2024)
Annual ridershipIncrease0.839 billion (2025)
Increase0.781 billion (2024)
Websitewww.jaklingkoindonesia.co.id
Operation
Began operation14 December 2017; 8 years ago (2017-12-14)
Operator(s)
Technical
System length672.4 km (418 mi) (exclude Whoosh)
Track gauge
  • 1,067 mm (3 ft 6 in)
    • , , , , , ,
  • 1,435 mm (4 ft 8+12 in)
    • , , ,
  • Separated carriageway
    • , , , , , ,
    • , , , , ,
  • Elevated carriageway
Electrification
Close

History

KRL Commuterline

KRL Commuterline in Manggarai station

The modernization of the commuter railway system, begin in 2011. Network operations were greatly simplified from 37 point-to-point service patterns into six integrated lines (known as "loop line" system) all running local, stopping at every station, as express services were abolished. On 17 April 2013, the Commuterline extension to Maja in the Green Line commenced operation.[1]

Jakarta MRT

Jakarta MRT towards to Blok A MRT Station

Transport issues are attracting increasing political attention with a government goal of increasing the number of trips using public transport to 60% by 2030.[2] The idea of MRT construction in Jakarta has been sparked by the Head of the Agency for the Assessment and Application of Technology, B.J. Habibie (a man who would later become president).[3][4] The first line of the Jakarta MRT was officially operated on 24 March 2019 after being inaugurated by President Joko Widodo.[5][6][7]

Jabodebek LRT

Jabodebek LRT in TMII LRT Station

The Jabodebek light rapid transit project is aimed to tackle Jakarta's high road traffic congestion. The northern section of the LRT project partly replaces the Jakarta Monorail project which has been cancelled.[8] The LRT's public free trial run, is planned started on 12 July 2023, with commercial operations slated to begin on 17 August 2023.[9] The trial lasted until 17 July, before it was halted for a software upgrade.[10]

Jakarta LRT

A rolling stock of Jakarta LRT

The proposed LRT system in Jakarta was initially conceived as an alternative to the suspended Jakarta Monorail construction project.[11][12][13] A full public trial run began on 11 June 2019 between Boulevard Utara and Velodrome stations, with free admission to registered ticket holders.[14][15]

SHIA Airport Train in Manggarai station

The project plan was officially solidified only in 2011 with the issuing of a presidential regulation, Keppres No. 83 Year 2011, which assigned PT Angkasa Pura II and PT Kereta Api Indonesia to carry out the project. The railway was opened between SHIA and BNI City on 26 December 2017 and officially inaugurated on 2 January 2018.[16] Services were extended to Manggarai on 5 September 2019.[17]

Whoosh

A Whoosh high-speed rail towards to Tegalluar Summarecon station

Concepts for high-speed rail (HSR) in Indonesia were first to discussions at Asian Investment Summit in 2013, and detailed plans being set forth in 2015.[18][19][20][21] The Jakarta-Bandung HSR began trial operation with passengers on 7 September 2023, and commercial operations on 2 October 2023.[22][23]

Transjakarta

A electric Transjakarta bus fleet in Kampung Rambutan

Transjakarta was conceived to provide a fast, comfortable, and affordable mass transportation system. The proposal for a BRT system in Jakarta was emerged in 2001. Governor of Jakarta at the time, Sutiyoso proposed four mass public transportation modes in Jakarta:.[24] The first Transjakarta line opened to the public on 15 January 2004.[25][26] It was free for the first two weeks, after which commercial operations started on 1 February 2004.

Integration

Initially, different competing companies operated the various transit systems and had developed these rail and bus systems separately and at various times. As a result, many of these systems did not integrate well with the others, making transferring from system to system inconvenient for passengers. Then in December 2017, Jak Lingko was introduce as a public transport integration program designed to integrate payment and physical connection between transport modes in Jakarta. The integration includes BRT, Commuter rail, Light Metro, MRT, LRT, Airport rail link and local angkot (Mikrotrans).[27]

System network

More information Symbol, Name ...
Symbol Name Began Operation Last Extension Terminus Type Depots Owner Operator(s) No. of
Stations
Length
(km)
Ridership(s)
2024[28][29]
Rail-based
Tanjung Priok Line5 December 2011[a]21 December 2015Jakarta KotaTanjung PriokCommuter rail
(S-train)
Bukit Duri
Depok
Bogor
Manggarai
KAI Commuter KRL Commuterline415.4 km 334,361,011
Cikarang Loop Line28 May 2022Kampung BandanCikarang2987.4 km
Bogor LineJakarta KotaBogor2354.8 km
Jakarta Kota Nambo 22 51.0 km
Rangkasbitung Line1 April 2017Tanah AbangRangkasbitung1772.8 km
Tangerang LineDuriTangerang1119.3 km
Soekarno-Hatta Line31 December 20178 September 2019ManggaraiSoekarno-HattaAirport rail linkManggarai KAI KAI Commuter554.3 km 2,380,704
North-South Line24 March 2019Lebak BulusBundaran HI Bank JakartaRapid transitLebak Bulus MRT Jakarta1315.7 km 39,910,100
Southern Line1 December 2019 Pegangsaan DuaVelodromeLight metroPegangsaan Dua LRT Jakarta65.8 km 1,213,461
Cibubur Line 28 August 2023 Dukuh Atas BNI Harjamukti Jati Mulya KAI LRT Jabodebek 12 25.9 km 21,055,870
Bekasi Line Dukuh Atas BNI Jati Mulya 14 29.5 km
Bus rapid transit trunk lines
List of Transjakarta corridors#Corridor 1Corridor 11 February 200422 July 2022Blok MKotaBus rapid transitCipayung
Ciputat
Cakung
Cawang
Pulo Gadung
Cijantung
Cibubur
Klender
Kelapa Gading
Klender
Jembatan Gantung
Rawa Buaya
Pinang Ranti
Kampung Rambutan
Pesing
Pamulang
Petukangan Selatan
Cipayung
Transjakarta2215.48 km 383,198,279
List of Transjakarta corridors#Corridor 2Corridor 215 January 20064 March 2023Pulo GadungMonumen Nasional2417.88 km
List of Transjakarta corridors#Corridor 3Corridor 3KalideresMonumen Nasional1416.14 km
List of Transjakarta corridors#Corridor 4Corridor 427 January 2007Pulo GadungGalunggung1711.90 km
List of Transjakarta corridors#Corridor 5Corridor 5 AncolKampung Melayu1813.58 km
List of TransJakarta corridors#Corridor 6Corridor 6ca. 2009RagunanGalunggung2015.90 km
List of TransJakarta corridors#Corridor 7Corridor 7Kampung RambutanKampung Melayu1412.57 km
List of TransJakarta corridors#Corridor 8Corridor 821 February 20094 March 2023Lebak BulusPasar Baru2625.33 km
List of TransJakarta corridors#Corridor 9Corridor 931 December 2010Pinang RantiPluit2631.57 km
List of TransJakarta corridors#Corridor 10Corridor 1031 December 2010 Tanjung PriokPGC2219.11 km
List of TransJakarta corridors#Corridor 11Corridor 1128 December 201128 December 2016Pulo GebangKampung Melayu1613.86 km
List of TransJakarta corridors#Corridor 12Corridor 1214 February 201318 December 2021PluitTanjung Priok2423.30 km
List of TransJakarta corridors#Corridor 13Corridor 1313 August 201712 November 2018CBD CiledugTegal Mampang1514.18 km
List of TransJakarta corridors#Corridor 14 Corridor 14 10 November 2023[b] 23 August 2024 Jakarta International Stadium Senen Raya 10 9.7 km
Total 424 672.4 km 788,175,314
Planned/under construction lines
Bogor Line
extension
TBA Bogor Sukabumi Commuter rail
(S-train)
Bukit Duri
Depok
Bogor
Manggarai
KAI Commuter KRL Commuterline 11 57.3 Km
JIS Line Jatinegara Tanjung Priok 9 TBA
Rangkasbitung Line
extension
Rangkasbitung Merak 11 68.5 Km
Cikarang Loop Line
extension
Cikarang Cikampek 8 41.0 Km
North-South Line
extension
Under construction Bundaran HI Bank Jakarta Kota Rapid transit Lebak Bulus MRT Jakarta 7 5.8 km
TBA Kota Ancol Marina Ancol Marina 3 5.2 km
Lebak Bulus Parung Lebak Bulus TBA 18.0 km
East-West Line Under Construction Tomang Medan Satria Rorotan

Balaraja

21 24.5 km
TBA Tomang Kembangan 6 9.2 km
Kembangan Balaraja 14 29.9 km
Medan Satria Cikarang 8 20.5 km
Outer Ring Line Kampung Rambutan Fatmawati Kampung Rambutan 10 12.0 km
Fatmawati Joglo TBA 10.0 km
Joglo PIK TBA 12.0 km
PIK Ancol TBA 12.0 km
Ancol Semper Barat TBA 12.0 km
Semper Barat Cakung TBA 11.0 km
Cakung Kampung Rambutan TBA 17.0 km
Southern Line
extension
Under construction Velodrome Manggarai Light metro Pegangsaan Dua LRT Jakarta 6 6.4 km
TBA Manggarai Dukuh Atas 1 2.4 km
Dukuh Atas Pesing 13 12.3 km
Southeastern Line Velodrome Klender 5 4.5 km
Klender Halim 4 4.9 km
Northern Line Rajawali Pesing 6 8.9 km
Kelapa Gading JIS 6 8.9 km
JIS Rajawali 4 5.6 km
Cibubur Line
extension
Dukuh Atas BNI Senayan Jati Mulya KAI LRT Jabodebek 4 6.0 km
Harjamukti Baranangsiang 5 40.0 km
Bekasi Line
extension
Dukuh Atas BNI Soekarno-Hatta 9 45.2 km
PLGP LRT Line Pulo Gebang Joglo Pulo Gebang TBA TBA TBA
Close
  1. Converted as KCJ line
  2. Converted as BRT line

Timeline

Year Date System Line Event Length (km) Station
2015 1 April Bogor Line Citayam - Nambo branch section extended to 13.3 km (8.3 mi) 2
2017 1 April Rangkasbitung Line Maja - Rangkasbitung section electrified and extended to 17.1 km (10.6 mi) 2
17 September Cikarang Loop Line Bekasi - Cikarang section electrified and extended to 17.1 km (10.6 mi) 4
31 December Soekarno-Hatta Line SHIA - Manggarai section opened 54.3 km (33.7 mi) 6
2019 24 March North-South Line Lebak Bulus - Bundaran HI section opened 15.7 km (9.8 mi) 13
1 December Southern Line Pegangsaan - Velodrome section opened 5.8 km (3.6 mi) 6
2023 28 August Cibubur Line Dukuh Atas - Harjamukti section opened 25.9 km (16.1 mi) 12
Bekasi Line Dukuh Atas - Jatimulya section opened 29.5 km (18.3 mi) 14
17 October Whoosh Halim - Tegalluar section opened 142.85 km (88.76 mi) 3
Under construction
2026 August Southern Line Velodrome - Manggarai section opened 6.4 km (4.0 mi) 5
2027 TBA North-South Line Bundaran HI - Monas section opened 5.8 km (3.6 mi) 2
2029 North-South Line Monas - Kota section opened 4
2030 East-West Line Tomang - Medan Satria section opened 24.5 km (15.2 mi) 21

Ridership

More information Line Code, Line Name ...
Line Code Line Name Annual Ridership
2021 2022 2023 2024[30][31] 2025[32][33]
Bogor Line123,125,911215,049,396290,890,677334,361,011155,009,997
Cikarang Loop Line85,936,774
Rangkasbitung Line77,552,716
Tangerang Line27,280,453
Tanjung Priok Line3,531,311
Soekarno-Hatta Line1,963,7112,380,7042,347,314
North-South Line7,175,59519,780,00033,500,00039,910,10045,479,391
Southern Line315,366685,2491,033,2161,213,4611,278,661
Cibubur Line21,055,87028,816,787
Bekasi Line
List of Transjakarta corridors#Corridor 1 Corridor 198,880,000191,400,000280,000,000383,198,279414,346,167
List of Transjakarta corridors#Corridor 2 Corridor 2
List of Transjakarta corridors#Corridor 3Corridor 3
List of Transjakarta corridors#Corridor 4Corridor 4
List of Transjakarta corridors#Corridor 5Corridor 5
List of TransJakarta corridors#Corridor 6Corridor 6
List of TransJakarta corridors#Corridor 7Corridor 7
List of TransJakarta corridors#Corridor 8Corridor 8
List of TransJakarta corridors#Corridor 9Corridor 9
List of TransJakarta corridors#Corridor 10Corridor 10
List of TransJakarta corridors#Corridor 11Corridor 11
List of TransJakarta corridors#Corridor 12Corridor 12
List of TransJakarta corridors#Corridor 13Corridor 13
List of TransJakarta corridors#Corridor 14Corridor 14
Total 229,416,872 426,229,396 607,387,604 780,905,964 839,232,257
Close

Rolling stock

More information Line Code, Line Name ...
Line Code Line Name Formation In service
On order
Rolling Stock Manufacturers Image
North-South Line 6 carriage EMU 16 trainsets (96 car)
8 trainsets (48 car)
MRTJ 1000 series Japan Nippon Sharyo
Bogor Line 12 carriage EMU 4 trainsets (48 car)
12 trainsets (144 car)
CLI-225 series Indonesia PT INKA
Cikarang Loop Line
Rangkasbitung Line 12 carriage EMU 11 trainsets (132 car) CLI-125 series China CRRC Qingdao Sifang
Tangerang Line 8-12 carriage EMU 130 trainsets (1068 car) see here Japan Nippon Sharyo, Kawasaki Heavy Industries, Hitachi, Ltd., Kinki Sharyo, , Japan Transport Engineering Company
Tanjung Priok Line
Cibubur Line 6 carriage EMU 27 trainsets (162 car) INKA Class Indonesia PT INKA
Bekasi Line
South Line 2 carriage EMU 8 trainsets (16 car) Hyundai Rotem LRV South Korea Hyundai Rotem
Airport Railink 6 carriage EMU 10 trainsets (60 car) EA203 Indonesia PT INKA
Whoosh 8 carriage EMU 11 trainsets (88 car) KCIC400AF China CRRC Qingdao Sifang
TransJakarta Transjakarta Single-deck bus 4,487 electric, CNG, diessel bus see here SwedenGermanyChina Scania AB, Mercedes-Benz, Zhongtong, BYD, Skywell, Volvo
Close

See also

References

Related Articles

Wikiwand AI