Guanqiao station

Future Guangzhou Metro station From Wikipedia, the free encyclopedia

Guanqiao station (simplified Chinese: 官桥站; traditional Chinese: 官橋站; pinyin: Guānqiáo Zhàn; Cantonese Yale: Gūnkìuh Jaahm) is a future elevated station of Line 4 of the Guangzhou Metro. It will be located at Guanqiao Village (Chinese: 官桥村), Shilou Town (Chinese: 石楼镇), Panyu District, Guangzhou. The station began construction in December 2023 and will be completed by the end of 2026.[1][2]

Hanyu PinyinGuānqiáo Zhàn
Hanyu PinyinGuānqiáo Zhàn
Quick facts Chinese name, Simplified Chinese ...
Guanqiao

官桥
Guangzhou Metro
Metro Guanqiao station under construction on the southwestern side of Guanqiao North railway station
Chinese name
Simplified Chinese官桥站
Traditional Chinese官橋站
Transcriptions
Standard Mandarin
Hanyu PinyinGuānqiáo Zhàn
Yue: Cantonese
Yale RomanizationGūnkìuh Jaahm
Jyutpinggun1 kiu4 zaam6
Hong Kong RomanizationKwun Kiu station
General information
LocationIntersection of Lianhua Road (莲花路) and planning Lianhua Avenue (莲花大道)
Border of Shilou [zh] and Shiqi [zh], Panyu District, Guangzhou, Guangdong
China
Coordinates22.983511°N 113.438881°E / 22.983511; 113.438881
Operated byGuangzhou Metro Co. Ltd.
Line     Line 4
Platforms2 (2 side platforms)
Tracks2
ConnectionsPRDIR Guanqiao North
Construction
Structure typeElevated
AccessibleYes
Other information
Station code416
History
Opening2026[1]
Services
Preceding station Guangzhou Metro Following station
     Line 4 does not stop here
Future services (2026)
Xinzao
towards Huangcun
Line 4 Shiqi
Transfer at Guanqiao North
Preceding station Pearl River Delta Metropolitan Region Intercity Railway Pearl River Delta Metropolitan Region Intercity Railway Following station
Donghuan
towards Panyu
Guangzhou–Huizhou intercity railway Guangzhou Lianhuashan
Location
Close

History

This station was originally a reserved station on Line 4. Because most of the surrounding areas of the station are farmland and there is no road to connect with the outside world, the station was not built simultaneously with Line 4, therefore only the equipment required for the signal system was installed at the predetermined location of the station, and no civil facilities for the station were reserved.

As construction of the Guangzhou–Huizhou intercity railway neared completion, the station started planning construction around 2020 to channel passengers onto the intercity line. The preliminary design estimate for the station project was approved in February 2021.[3] The station was originally scheduled to start construction in the second half of 2021 and be completed and opened in 2024. As a result, the parties issued a supervision tender in October of the same year but suspended the tender ahead of schedule in March 2022. In May 2022, the construction bidding supervision bidding was restarted again. In September 2022, the relevant person in charge said in response to media and public inquiries that the station has completed the bidding for the project and is carrying out preliminary work such as land acquisition, planning and construction approval.[4][5]

In February 2024, the construction of the steel structure of the station began.[6]