Guru Hargobind Thermal Plant
Thermal plant in India
From Wikipedia, the free encyclopedia
Guru Hargobind Thermal Plant (GHTP Lehra Mohabbat) is located on National Highway No. 7 (earlier NH 64) which runs from Bathinda to Chandigarh.[1]
| Guru Hargobind Thermal Plant | |
|---|---|
![]() | |
| Country | India |
| Location | Lehra Mohabbat (National Highway No. 64(New NH-07)), Bathinda to Barnala |
| Coordinates | 30°16′03″N 75°09′52″E |
| Status | Operational |
| Owner | Punjab Government Power corporation |
| Operator | |
| Thermal power station | |
| Primary fuel | Coal from North Karanpura and Central Coal field Ltd and Light Diesel Oil |
| Turbine technology | Thermal |
| Cooling source | Sirhind Canal (Bhatinda Branch) |
| Power generation | |
| Units operational | 4 (2 x 210 MW single shaft reaction turbine + 2 x 250 MW) |
| Nameplate capacity | 220.8 Lac units daily |
| Annual net output | 2281 MUs |
| External links | |
| Website | www |
Source https://www.pspcl.in/ghtp-lehra-mohabat/ | |
The Generators used are cylindrical rotor type, that were manufactured in India by BHEL.[2]
Source of water is from Bhatinda Branch of Sirhind Canal.[3]
Capacity
It has an installed capacity of 920 MW.
| Stage | Unit Number | Generating Capacity (MW) | Commissioned on | Status |
|---|---|---|---|---|
| First | 1 | 210 | June, 1999 | Running |
| First | 2 | 210 | January, 1999 | Running |
| Second | 3 | 250 | October, 2008 | Running |
| Second | 4 | 250 | January, 2010 | Running |
