HMAS Tasman
From Wikipedia, the free encyclopedia
Type 26 frigate | |
| History | |
|---|---|
| Name | Tasman |
| Namesake | Abel Tasman |
| Ordered | 21 June 2024 |
| Builder | BAE Systems Australia, Osborne |
| Cost | AU$3.9 billion |
| Identification | Pennant number: |
| Status | Ordered |
| General characteristics | |
| Type | Hunter-class frigate |
| Displacement | 8,800 t (8,700 long tons; 9,700 short tons) full load displacement |
| Length | 151.4 m (497 ft) |
| Beam | 21.4 m (70 ft) |
| Propulsion |
|
| Speed | 27+ knots |
| Range | 7,000 nautical miles (13,000 km; 8,100 mi) in electric motor drive[1] |
| Complement | 180 personnel, with accommodation for 208 |
| Sensors & processing systems |
|
| Electronic warfare & decoys | Nulka decoy launchers |
| Armament |
|
| Aircraft carried |
|
| Aviation facilities | |
| Notes | |
HMAS Tasman (FFG) is the third planned ship of the Hunter-class frigate of the Royal Australian Navy. She will be a heavy frigate capable of anti-submarine, anti-air, anti-ship and land-attack warfare, integrating the Aegis Combat System with a suite of missiles including Tomahawk Land Attack Missiles and a variety of anti-air weapons such as the SM-6 terminal anti-ballistic missile. Tasman is yet to begin construction, with her commissioning expected sometime after 2032.