HVDC BorWin3

Offshore HVDC connection in Germany From Wikipedia, the free encyclopedia

HVDC BorWin3 is a high voltage direct current (HVDC) link under construction to transmit offshore wind power to the power grid of the German mainland. The project differs from most HVDC systems in that one of the two converter stations is built on a platform in the sea. Voltage-Sourced Converters with DC ratings of 900 MW, ±320 kV are used and the total cable length is 160 km. The project is the most recent of the German offshore HVDC projects to be awarded (in 2014).[1] It is being built by the Siemens/ Petrofac consortium with the offshore platform contract awarded to Drydocks World in Dubai.[2] The project is expected to be handed over to its owner, TenneT, in 2019. The project started power transmission in August 2019.[3] TenneT took control of operations in February 2020.[4]

CountryGermany
General directionnorth–south
FromPlatform BorWin Gamma
Passes throughNorth Sea
Quick facts Location, Country ...
HVDC BorWin3
Location of HVDC BorWin3
Location
CountryGermany
General directionnorth–south
FromPlatform BorWin Gamma
Passes throughNorth Sea
ToEmden/Ost substation
Technical information
Typesubmarine cable, subsoil cable
Type of currentHVDC
Close

See also

References

Related Articles

Wikiwand AI