Havelock City is a large mixed-use real-estate project in Colombo, Sri Lanka. The residential component of the project consists of eight residential towers and the commercial component of the project consists of a 46-storey office tower and shopping mall built to international standards.[5] It is popular for its clubhouse, 2.8 ha (7 acres) garden, and the overall size of the project.[6] The first four residential towers, namely Park Tower and Elibank Tower (of construction Phase-1), and Layards Tower and Davidson Tower (of construction Phase-2), were completed as at early 2017 with 22 floors each, and is currently occupied by residents. Phase-3 is currently under construction, and will consist of the Stratford Tower and Melford Tower, with 28 floors each.[7][8] Piling for Phase-4 was done with Phase-3 to expedite development. Both phases is estimated to cost over US$130 million.[9]

StatusCompleted
TypeMixed-use
Coordinates06°52′56″N 79°52′00″E
Quick facts General information, Status ...
Havelock City
The four towers of Phase-1 and Phase-2, in March 2017.
Havelock City is located in Colombo Municipality
Havelock City
Location within Colombo Municipality
General information
StatusCompleted
TypeMixed-use
LocationColombo, Sri Lanka
Coordinates06°52′56″N 79°52′00″E
Construction started
May 18, 2004; 22 years ago (2004-05-18)
Completed
2023
OpeningApril 2009 (Apartment)
21 October 2022 (Mireka Tower)[1]
27 May 2023 (Havelock City Mall)[2]
CostUS$166 million (Mireka Tower only)[3]
OwnerMireka Capital Land, a subsidiary of Overseas Realty (Ceylon)
Technical details
Floor count22–50
Lifts/elevators24+
Design and construction
ArchitectsSenaka Dharmatilleke[citation needed]
ECADI[verification needed]
DGFI[verification needed]
Main contractorSingapore Piling & Civil Engineering (Phase 1)
SCG (Phase 1)[4]
ICC Construction (Phase 2-4)
CHEC (Mireka Tower & Havelock City Mall)
Close

At a cost of US$166 million, the 46-storey commercial skyscraper will have 600,000 ft2 (56,000 m2) of office space and 200,000 ft2 (19,000 m2) for the shopping mall. The ground-breaking ceremony for the commercial component was ceremonially conducted on 29 December 2016 with the auspices of S. P. Tao, the chairman of Overseas Realty, along with other dignitaries such as ministers Mangala Samaraweera and Champika Ranawaka.[6][10]

Construction

Construction of Phase-1 in August 2008
Two of the towers in March 2017
Stratford Tower and Melford Tower (Phase 3) under construction and Park Tower and Elibank Tower (of construction Phase-1), and Layards Tower and Davidson Tower (of construction Phase-2) can be seen

East China Architecture Design and Research Institute (ECADI) and Design Group Five International of Sri Lanka are the leading architects of the project. Havelock City is developed and managed by Mireka Capital Land (Pvt) Ltd, a fully own subsidiary of Overseas Realty (Ceylon) PLC.[9]

The project is being built on a single 7 ha (18-acre) site, once the premises of the Wellawatta Spinning and Weaving Mills. Prior to construction commencing, the land was the largest cleared land in Colombo.[11]

List towers

More information Name, Use ...
Name Use Year Floors Ref
Mireka Tower Commercial 2022 50 [12]
Havelock City Mall Shopping complex 2023 6 [13]
Edmonton Tower Residential 2021 31 [14]
Peterson Tower Residential 2021 31
Stratford Tower Residential 2016 28 [15][16]
Melford Tower Residential 2016 28
Layards Tower Residential 2014 22 [17]
Davidson Tower Residential 2014 22
Elibank Tower Residential 2009 22 [18][19]
Park Tower Residential 2009 22
Close

Bridge

The Havelock City Bridge is a 37 m (120 ft) beam bridge which connects the Havelock City premises at the southeast of the bridge, to Skelton Road in the northwest. The bridge's ground-breaking ceremony was held 4 September 2008,[20] and completed in late 2012. The bridge was constructed by the Sri Lankan engineering firm International Construction Consortium at a cost of US$ 1.27 million.