Hi-Tech Central station

Shenzhen Metro Line 13 station From Wikipedia, the free encyclopedia

Hi-Tech Central station (Chinese: 高新中; pinyin: Gāoxīnzhōng Zhàn; Cantonese Yale: Gōusān Jūng Jaahm) is a station on Line 13 of Shenzhen Metro. It opened on 28 December 2024. It was the northern terminus of the line until the extension to Shangwu opened on 28 December 2025.

Concourse
Chinese高新中
Hanyu PinyinGāoxīn Zhōng
Hanyu PinyinGāoxīn Zhōng
Yale RomanizationGōusān Jūng
Quick facts Chinese name, Chinese ...
Hi-Tech Central

高新中
Shenzhen Metro
Platform
Chinese name
Chinese高新中
Transcriptions
Standard Mandarin
Hanyu PinyinGāoxīn Zhōng
Yue: Cantonese
Yale RomanizationGōusān Jūng
JyutpingGou1 San1 Zung1
General information
LocationIntersection of Keyuan Road (科苑路), Gaoxinzhong 2nd Road (高新中二路) and Kehua Road (科华路)
Nanshan District, Shenzhen, Guangdong
China
Coordinates22.5500°N 113.9404°E / 22.5500; 113.9404
Operated byMTR China Railway Electrification Rail Transit (Shenzhen) Co., Ltd
(MTR Corporation (Shenzhen) Co., Ltd. and China Railway Electrification Bureau Group Co., Ltd.)
Line     Line 13
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
AccessibleYes
History
Opened28 December 2024 (14 months ago) (2024-12-28)
Previous namesKexing (科兴)
Services
Preceding station SZM Shenzhen Metro Following station
Shenzhen University Line 13 Hi-Tech North
towards Shangwu
Location
Close

Station layout

G - Exits A, C, D
B1F
Concourse
Lobby Ticket Machines, Customer Service, Station Control Room
B2F
Platforms
Platform 1 arrow for L 13 towards Shenzhen Bay Checkpoint (Shenzhen University)
Island platform, doors will open on the left
Platform 2 13 towards Shangwu (Hi-Tech North) arrow for R

Entrances/exits

The station has 3 points of entry/exit, with Exit A being accessible via elevator. Exit A also has a toilet.

  • A: Keyuan North Road (E-S), Xunmei Building Wheelchair user access
  • C: Keyuan North Road (W-N), Kexing Science and Technology Park
  • D: Keyuan North Road (W-S), Kexing Science and Technology Park

Construction timeline

  • On 26 July 2017, Shenzhen Metro Group Co., Ltd. issued the "Environmental Impact Report of Shenzhen Urban Rail Transit Line 13 Project", which includes this station, and the project is named Kexing Station.[1]
  • On 20 February 2019, the construction of this station officially started.[2]
  • On 19 August 2019, the first acceptance of the reinforcement cage of the connecting wall of the station was successfully passed.[3]
  • On September 30, 2019, the construction of the main power pipeline of the station was successfully completed.[2]
  • On April 27, 2020, the cutover of the last power pipeline of the station was successfully completed.[2]
  • On February 20, 2021, the acceptance of the excavation conditions of the 1-17 axis deep foundation pit of the station was successfully passed, marking that the station has fully entered the earthwork excavation stage.[4]
  • On April 22, 2022, the Shenzhen Municipal Bureau of Planning and Natural Resources issued the Announcement on the Approval of the Plan for the Station Names of Relevant Lines of the Fourth Phase of Shenzhen Metro, and the station was renamed from "Kexing Station" to the official station name, "Hi-Tech Central Station".[5]