D1 motorway is an east-west motorway (Slovak: Diaľnica D1) in Slovakia. The D1 motorway is the oldest, longest and busiest[1][2] motorway in Slovakia, which is connects Bratislava with Trnava, Trenčín, Žilina, Martin, Poprad, Prešov, Košice to the Slovak-Ukrainian border (border crossing with Uzhhorod), where it is connected to the Ukrainian road M08.
Under Construction: 14.9 km (9.3 mi)
Planned: 87.7 km (54.5 mi)
R7 Bratislava - Nivy
D4 Bratislava - South
R1 Trnava
R2 near Chocholná
R6 Púchov, South
D3 near Hričovské Podhradie
R3 near Martin
R3 near Likavka (planned)
R1 near Ružomberok (planned)
R4 Prešov, West
R4 near Košické Oľšany
| D1 Motorway | ||||
|---|---|---|---|---|
| Diaľnica D1 | ||||
Completed Under construction Planned | ||||
| Route information | ||||
| Part of | ||||
| Length | 512 km (318 mi) Completed: 413.3 km (256.8 mi) Under Construction: 14.9 km (9.3 mi) Planned: 87.7 km (54.5 mi) | |||
| Major junctions | ||||
| From | ||||
| ||||
| To | ||||
| Location | ||||
| Country | Slovakia | |||
| Regions | Bratislava Region, Trnava Region, Trenčín Region, Žilina Region, Prešov Region, Košice Region | |||
| Major cities | Bratislava, Trnava, Trenčín, Žilina, Martin, Poprad, Prešov, Košice | |||
| Highway system | ||||
| ||||
It is part of the European roads E50, E58, E75, E442, E571 and of the V.A Pan-European corridor (Trieste) - Bratislava - Žilina - Košice - Uzhhorod - Lviv. With the exception of sections in Bratislava, Žilina, Prešov, Poprad and Košice, a vignette is required to use the motorway.[3]
The motorway has been under construction since 1972 and by 2023, 395.9 km of the total planned length of 512.4 km were operational. Despite the various completion dates set in the past (1990, 2000, 2005, 2010 or 2013), the full length will not be passable until 2040 at the earliest.[4][5]

Chronology
The first plans to connect Prague to Slovakia and Mukachevo in today's Zakarpattia Oblast in Ukraine, which was part of Czechoslovakia at that time, were in the 1930s. The construction of the motorway (freeway) began in the Czech part in the late 1930s, but in the Slovak part nothing was built[citation needed]. After the end of World War II, highway construction was abandoned, due to post-war reconstruction. But in the 1960s, traffic was growing very fast, and a new plan for a D1 highway was available soon, without the part in Zakarpattia Oblast, which became part of the USSR in 1945.[citation needed].
Construction began in 1973, by building the Ivachnová - Liptovský Mikuláš section, a 15-kilometre-long (9.3 mi) segment in northern Slovakia. Construction on this section finished in December 1977 and cost 241.3 million Czechoslovak korunas.[6] In 1976, 6.4-kilometre-long (4.0 mi) section created the southern bypass of Liptovský Mikuláš. The total cost of the construction amounted to 368 million Czechoslovak korunas.[6] The section between Liptovský Ján and Liptovský Hrádek with a length of 5.1-kilometre-long (3.2 mi) kilometres was under construction from April 1975 to December 1983 and had once the longest road bridge in Slovakia - the 1,035-metre-long Podtureň Viaduct.[7]
Between 1978 and 1982, a 15.9-kilometre-long (9.9 mi) section was constructed between Trnava and Hlohovec. June 1980 saw the beginning of construction in a new 17.7-kilometre-long (11.0 mi) section between Hlohovec and Piešťany which was put into operation in 1985.
A 14-kilometre-long (8.7 mi) section between Horná Streda - Nové Mesto nad Váhom opened in half-profile as a D61 in 1998, and was finished as the motorway D1 in full profile in 2000. A 15.3-kilometre-long (9.5 mi) section between Nové Mesto nad Váhom - Chocholná also opened in half-profile as a D61 in 1998, and was subsequently finished as the D1 in full profile in 2000.[6]
The 3.2-kilometre-long (2.0 mi) section of motorway in Bratislava did not begin until 20 March 2003. The construction was handed over for early use on 4 December 2005, while the gradual finishing works on the footbridges continued until June 2006. The total construction costs amounted to 1.908 billion SKK.[6]
The section between Hričovské Podhradie - Lietavská Lúčka forms the first part of the southern bypass of Žilina and includes the Ovčiarsko and Žilina tunnels. The construction of the section began with the excavation of the exploratory tunnel of the Ovčiarsko tunnel back in 1996. After the completion of the exploratory tunnel, further construction of the section was postponed. Construction work has continued only since 2014. The contractual completion date was January 2018. This deadline could not be met and the section was not handed over for use until 29 January 2021.[8] This section was financed through the European Union budget.[9]
Section at Prešov was opened in late 2021. That also includes the Prešov tunnel with 2240 meters of length.[10]
The section between Lietavská Lúčka and Dubná Skala, whose exploration tunnel works are dating back to 1998, but actual construction started in 2015, was opened on December 22, 2025. The Višnové tunnel is included within the section and after the opening, it became the longest tunnel on the motorway.[11]
Future developments
The construction of the Hubová - Ivachnová section (Ružomberok bypass), which after multiple delays, is set to be completed in 2026.[12] The 15 km long section includes the Čebrať tunnel along with 19 bridges and 3 junctions. The cost is estimated to be around €320 million, of which €125 million is funded by the European Union.[13][14]
The construction of the Turany - Hubová section, which will be the last missing section on the Bratislava - Košice route, has not yet started. According to an ongoing public procurement for the section, the duration of the construction should be 7 years with the estimated cost being €1.5 billion.[15]
Route description
| Country | Region | Location | km | mi | Exit | Name | Destinations | Notes |
|---|---|---|---|---|---|---|---|---|
| Slovakia | Bratislava Region | Bratislava Region | 0 | 0.0 | — | Bratislava-Pečňa | Kilometrage starting point | |
| 1 | 0.62 | — | Bratislava-Incheba | |||||
| 4 | 2.5 | — | Bratislava-Petržalka-Ovsište | |||||
| 6 | 3.7 | — | Bratislava-Nivy | |||||
| 8 | 5.0 | — | Bratislava-Ružinov | |||||
| 10 | 6.2 | — | Bratislava-Trnávka | |||||
| 11 | 6.8 | — | Bratislava-Letisko | |||||
| 13 | 8.1 | — | Bratislava-Zlaté Piesky | |||||
| Rest area | Zlaté Piesky | |||||||
| 14 | 8.7 | — | Bratislava-Vajnory | |||||
| 15 | 9.3 | — | Bratislava-východ | |||||
| 18 | 11 | — | Bernolákovo | Start of a 3-lane dual carriageway (no hard shoulder), a speed limit of 110 km/h applies from 5 AM to 7 PM | ||||
| 27 | 17 | — | Senec | |||||
| 30 | 19 | — | Senec-východ | |||||
| Trnava Region | Trnava Region | 44 | 27 | — | Voderady | |||
| 50 | 31 | — | Trnava | End of the 3-lane dual carriageway and 110 km/h speed limit | ||||
| 66 | 41 | — | Hlohovec | |||||
| 68 | 42 | — | Madunice | |||||
| 83 | 52 | — | Piešťany | |||||
| Trenčín Region | Trenčín Region | 91 | 57 | — | Horná Streda | |||
| 95 | 59 | — | Luka | |||||
| 106 | 66 | — | Nové Mesto nad Váhom | |||||
| 119 | 74 | — | Trenčín-juh | |||||
| 119 | 74 | — | Trenčín-juh | Connection with R2 proposed | ||||
| 124 | 77 | — | Trenčín-západ | |||||
| Rest area | Zamarovce | |||||||
| 138 | 86 | — | Dubnica nad Váhom | |||||
| 145 | 90 | — | Ilava | |||||
| 153 | 95 | — | Ladce | |||||
| 157 | 98 | — | Púchov-juh | |||||
| Rest area | Sverepec | |||||||
| 165 | 103 | — | Považská Bystrica-juh | |||||
| 169 | 105 | — | Považská Bystrica-centrum | |||||
| 174 | 108 | — | Považská Bystrica-sever | |||||
| Žilina Region | Žilina Region | 183 | 114 | — | Bytča | |||
| 188 | 117 | — | Žilina (Hričovské Podhradie) | |||||
| 199 | 124 | — | Žilina-juh | |||||
| 212 | 132 | — | Dubná Skala, Vrútky | |||||
| 218 | 135 | — | Martin | |||||
| 229 | 142 | — | Turany | Temporary end | ||||
| 242 | 150 | — | Ružomberok-západ | In construction | ||||
| 242 | 150 | — | Likavka | Proposed | ||||
| 249 | 155 | — | Ružomberok-sever | In construction | ||||
| 251 | 156 | — | Ivachnová | In construction | ||||
| Rest area | Ivachnová | |||||||
| 259 | 161 | — | Ivachnová | |||||
| 272 | 169 | — | Liptovský Mikuláš | |||||
| 277 | 172 | — | Závažná Poruba | Proposed | ||||
| 279 | 173 | — | Liptovský Ján | |||||
| 284 | 176 | — | Liptovský Hrádok | |||||
| Rest area | Hybe | |||||||
| 292 | 181 | — | Hybe | |||||
| 297 | 185 | — | Východná | |||||
| 303 | 188 | — | Važec | |||||
| Rest area | Štrba | |||||||
| Prešov Region | Prešov Region | 310 | 190 | — | Štrba | |||
| 315 | 196 | — | Mengusovce (Svit) | |||||
| 322 | 200 | — | Poprad-západ | |||||
| 325 | 202 | — | Vysoké Tatry | |||||
| 329 | 204 | — | Poprad-východ | |||||
| 341 | 212 | — | Spišský Štvrtok | |||||
| 350 | 220 | — | Levoča | |||||
| Rest area | Levoča | |||||||
| 360 | 220 | — | Spišské Podhradie | |||||
| 368 | 229 | — | Beharovce | |||||
| 379 | 235 | — | Široké | |||||
| 382 | 237 | — | Fričovce | |||||
| 393 | 244 | — | Svinia | |||||
| Rest area | Malý Šariš | |||||||
| 400 | 250 | — | Prešov-západ | |||||
| 407 | 253 | — | Prešov-juh | |||||
| 418 | 260 | — | Lemešany | |||||
| Košice Region | Košice Region | 422 | 262 | — | Nová polhora | |||
| Rest area | Janovík | |||||||
| 427 | 265 | — | Košice-sever | |||||
| 433 | 269 | — | Košické Oľšany | |||||
| 441 | 274 | — | Bidovce | Temporary end | ||||
| 459 | 285 | — | Dargov | Proposed | ||||
| 462 | 287 | — | Dvorianky | Proposed | ||||
| 472 | 293 | — | Pozdišovce | Proposed | ||||
| Rest area | Pozdišovce | Proposed | ||||||
| 475 | 295 | — | Michalovce-západ | Proposed | ||||
| 483 | 300 | — | Michalovce-východ | Proposed | ||||
| 496 | 308 | — | Sobrance | Proposed | ||||
| Rest area | Jenkovce | Proposed | ||||||
| 510 | 320 | — | Záhor | Proposed | ||||
| 511 | 318 | Slovakia-Ukraine border | Záhor-Storožnica border crossing | Proposed
Border with Ukraine; road continues as Ukrainian M08. | ||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
| ||||||||
Bridges and viaducts
This is a list of bridges and viaducts as seen when moving from west to east:


| Location | Length (m) | Notes |
|---|---|---|
| Ovsište | 567 | |
| Prístavný most | 1,080 | |
| Prievoz | 1,756 | |
| Horná Streda | 772 | |
| Beckov | 336 | |
| Drietoma | 238 | |
| Súčanka | 404 / 486 | |
| Újazd | 486 / 490 | |
| Kočkovský kanál | 187 | |
| Nosický kanál | 227 | |
| Ladce | 189 / 186 | |
| Pružinka | 902 | |
| Sverepec I | 443 / 480 | |
| Sverepec II | 315 / 310 | |
| Kunovec | open July 2010 | |
| Galanovec | open July 2010 | |
| Matúška | open July 2010 | |
| Považská Bystrica | 1,444 | open 30 May 2010 |
| Hričovský kanál | 1,695 | July 2010 |
| Vrtižer | open July 2010 | |
| Plevník-Drienové | ||
| Predmier | 2 lanes | |
| Dolný Hričov | 1,804 | planned; open 2012? |
| Lietavská Lúčka | 1,091 | planned; open 2012? |
| Dubná Skala | planned | |
| Turčianské Kľačany | 422 | planned |
| Turany | planned | |
| Krpeľany | planned | |
| Kraľovany | planned | |
| Stankovany | planned | |
| Hubová I | planned | |
| Hubová II | planned | |
| Lisková | planned | |
| Podtureň | 1,038 | |
| Jamníček | 179 | |
| Belá | 308 | |
| Dovalovec | 534 | |
| Hybica | 571 / 565 | |
| Východná | 380 | |
| Jánošiková studnička | 381 | |
| Belianský potok | 347 | |
| Čierny jarok | 184 | |
| Važec | 638 | open 2007? |
| Štrba | 600 | open 2007? |
| Pod Skalkou | open 2008 | |
| Levoča | planned | |
| Spišský Hrhov | planned | |
| Beharovce | 225 | 2 lanes |
| Studenec | 102 | 2 lanes |
| Pongrácovce | 343 | 2 lanes |
| Fričovce | 407 | |
| Malá Svinka | 255 | open 2008 |
| Malý Šariš | 494 | open 2008 |
Tunnels
There are total of twelve tunnels on the D1, of which eight are in operation. One of them is currently under construction, the Čebrať tunnel, which is planned to open in 2026.[16] Planned tunnels include the Korbieľka tunnel and the Havran tunnel. The Dargov tunnel might not be built in the future due to studies that found a more efficient route without the tunnel.[17] The use of tunnels comes included with the vignette.
This is a list of tunnels as seen when moving from west to east:
| Tunnel | Length (m) | Notes | Maximum speed limit | Vehicles per day | ADR category[18] |
|---|---|---|---|---|---|
| Ovčiarsko | 2,275 | opened on January 29, 2021 | 100 km/h (62 mph) | N/A | A |
| Žilina | 651 | opened on January 29, 2021 | 100 km/h (62 mph) | N/A | A |
| Višňové | 7,500 | opened on December 22, 2025 | 100 km/h (62 mph) | 20,000 (January 2026)[19] | A |
| Korbieľka | 5,859 | planned | — | N/A | — |
| Havran | 2,702 | planned | — | N/A | — |
| Čebrať | 2,080 | under construction since 2014, planned to open in 2026 | 100 km/h (62 mph) | N/A | — |
| Lučivná | 250 | opened on December 11, 2007 | 130 km/h (81 mph) | N/A | A |
| Bôrik | 999 | opened on December 8, 2009 | 100 km/h (62 mph) | N/A | A |
| Šibenik | 600 | opened on November 30, 2015 | 100 km/h (62 mph) | N/A | A |
| Branisko | 4,975 | opened on June 19, 2003 in a half profile, full profile planned | 80 km/h (50 mph) | 17,500 (May 2025)[20] | E |
| Prešov | 2,244 | opened on October 28, 2021 | 100 km/h (62 mph) | N/A | A |
| Dargov | 1,050 | planned? | — | N/A | — |
Planned Under construction In operation in a half profile | |||||
Gallery
- D1 motorway near Dubnica nad Váhom
- D1 motorway exit Považská Bystrica
- Junction Beluša
- D1 near Sverepec
- opening of the D1 motorway viaduct in Považská Bystrica
- opening of the D1 motorway viaduct in Považská Bystrica
- opening of the D1 motorway viaduct in Považská Bystrica
- The D1 with 4 lanes on the 17th kilometer
See also
External links
- Exit list of Highway D1 (in English)
- National Motorway Company (in Slovak)