Wikiwand AI

D1 motorway (Slovakia)

Motorway in Slovakia From Wikipedia, the free encyclopedia

D1 motorway is an east-west motorway (Slovak: Diaľnica D1) in Slovakia. The D1 motorway is the oldest, longest and busiest[1][2] motorway in Slovakia, which is connects Bratislava with Trnava, Trenčín, Žilina, Martin, Poprad, Prešov, Košice to the Slovak-Ukrainian border (border crossing with Uzhhorod), where it is connected to the Ukrainian road M08.

Length512 km (318 mi)
Completed: 413.3 km (256.8 mi)
Under Construction: 14.9 km (9.3 mi)
Planned: 87.7 km (54.5 mi)
From D2 Bratislava - Pečna
Major intersections
To M08 border with Ukraine (planned)
Quick facts Route information, Length ...
D1 Motorway shield}}
D1 Motorway
Diaľnica D1
     Completed        Under construction        Planned
Route information
Part of E50 E58 E75 E571
Length512 km (318 mi)
Completed: 413.3 km (256.8 mi)
Under Construction: 14.9 km (9.3 mi)
Planned: 87.7 km (54.5 mi)
Major junctions
From D2 Bratislava - Pečna
Major intersections
To M08 border with Ukraine (planned)
Location
CountrySlovakia
RegionsBratislava Region, Trnava Region, Trenčín Region, Žilina Region, Prešov Region, Košice Region
Major citiesBratislava, Trnava, Trenčín, Žilina, Martin, Poprad, Prešov, Košice
Highway system
  D2
Close

It is part of the European roads E50, E58, E75, E442, E571 and of the V.A Pan-European corridor (Trieste) - Bratislava - Žilina - Košice - Uzhhorod - Lviv. With the exception of sections in Bratislava, Žilina, Prešov, Poprad and Košice, a vignette is required to use the motorway.[3]

The motorway has been under construction since 1972 and by 2023, 395.9 km of the total planned length of 512.4 km were operational. Despite the various completion dates set in the past (1990, 2000, 2005, 2010 or 2013), the full length will not be passable until 2040 at the earliest.[4][5]

Junction Trnava with R1
Junction Spišské Podhradie

Chronology

The first plans to connect Prague to Slovakia and Mukachevo in today's Zakarpattia Oblast in Ukraine, which was part of Czechoslovakia at that time, were in the 1930s. The construction of the motorway (freeway) began in the Czech part in the late 1930s, but in the Slovak part nothing was built[citation needed]. After the end of World War II, highway construction was abandoned, due to post-war reconstruction. But in the 1960s, traffic was growing very fast, and a new plan for a D1 highway was available soon, without the part in Zakarpattia Oblast, which became part of the USSR in 1945.[citation needed].

Construction began in 1973, by building the Ivachnová - Liptovský Mikuláš section, a 15-kilometre-long (9.3 mi) segment in northern Slovakia. Construction on this section finished in December 1977 and cost 241.3 million Czechoslovak korunas.[6] In 1976, 6.4-kilometre-long (4.0 mi) section created the southern bypass of Liptovský Mikuláš. The total cost of the construction amounted to 368 million Czechoslovak korunas.[6] The section between Liptovský Ján and Liptovský Hrádek with a length of 5.1-kilometre-long (3.2 mi) kilometres was under construction from April 1975 to December 1983 and had once the longest road bridge in Slovakia - the 1,035-metre-long Podtureň Viaduct.[7]

Between 1978 and 1982, a 15.9-kilometre-long (9.9 mi) section was constructed between Trnava and Hlohovec. June 1980 saw the beginning of construction in a new 17.7-kilometre-long (11.0 mi) section between Hlohovec and Piešťany which was put into operation in 1985.

A 14-kilometre-long (8.7 mi) section between Horná Streda - Nové Mesto nad Váhom opened in half-profile as a D61 in 1998, and was finished as the motorway D1 in full profile in 2000. A 15.3-kilometre-long (9.5 mi) section between Nové Mesto nad Váhom - Chocholná also opened in half-profile as a D61 in 1998, and was subsequently finished as the D1 in full profile in 2000.[6]

The 3.2-kilometre-long (2.0 mi) section of motorway in Bratislava did not begin until 20 March 2003. The construction was handed over for early use on 4 December 2005, while the gradual finishing works on the footbridges continued until June 2006. The total construction costs amounted to 1.908 billion SKK.[6]

The section between Hričovské Podhradie - Lietavská Lúčka forms the first part of the southern bypass of Žilina and includes the Ovčiarsko and Žilina tunnels. The construction of the section began with the excavation of the exploratory tunnel of the Ovčiarsko tunnel back in 1996. After the completion of the exploratory tunnel, further construction of the section was postponed. Construction work has continued only since 2014. The contractual completion date was January 2018. This deadline could not be met and the section was not handed over for use until 29 January 2021.[8] This section was financed through the European Union budget.[9]

Section at Prešov was opened in late 2021. That also includes the Prešov tunnel with 2240 meters of length.[10]

The section between Lietavská Lúčka and Dubná Skala, whose exploration tunnel works are dating back to 1998, but actual construction started in 2015, was opened on December 22, 2025. The Višnové tunnel is included within the section and after the opening, it became the longest tunnel on the motorway.[11]

Future developments

The construction of the Hubová - Ivachnová section (Ružomberok bypass), which after multiple delays, is set to be completed in 2026.[12] The 15 km long section includes the Čebrať tunnel along with 19 bridges and 3 junctions. The cost is estimated to be around €320 million, of which €125 million is funded by the European Union.[13][14]

The construction of the Turany - Hubová section, which will be the last missing section on the Bratislava - Košice route, has not yet started. According to an ongoing public procurement for the section, the duration of the construction should be 7 years with the estimated cost being €1.5 billion.[15]

Route description

More information Country, Region ...
CountryRegionLocationkmmiExitNameDestinationsNotes
SlovakiaBratislava RegionBratislava Region00.0Bratislava-Pečňa D2 E65Kilometrage starting point
10.62Bratislava-Incheba I/2 I/61
42.5Bratislava-Petržalka-Ovsište I/2 I/61
63.7Bratislava-Nivy R7 E575 I/61
85.0Bratislava-Ružinov I/63
106.2Bratislava-Trnávka
116.8Bratislava-Letisko
138.1Bratislava-Zlaté Piesky I/61
Rest areaZlaté Piesky
148.7Bratislava-Vajnory I/61
159.3Bratislava-východ D4 E75 E58
1811BernolákovoStart of a 3-lane dual carriageway (no hard shoulder), a speed limit of 110 km/h applies from 5 AM to 7 PM
2717Senec
3019Senec-východ I/61
Trnava RegionTrnava Region4427Voderady
5031Trnava R1 E58 E571End of the 3-lane dual carriageway and 110 km/h speed limit
6641Hlohovec
6842Madunice I/61
8352Piešťany
Trenčín RegionTrenčín Region9157Horná Streda I/61
9559Luka
10666Nové Mesto nad Váhom
11974Trenčín-juh I/9 E50 E572
11974Trenčín-juh R2Connection with R2 proposed
12477Trenčín-západ
Rest areaZamarovce
13886Dubnica nad Váhom
14590Ilava
15395Ladce
15798Púchov-juh R6
Rest areaSverepec
165103Považská Bystrica-juh I/61
169105Považská Bystrica-centrum
174108Považská Bystrica-sever I/61
Žilina RegionŽilina Region183114Bytča
188117Žilina (Hričovské Podhradie) D3 E75
199124Žilina-juh
212132Dubná Skala, Vrútky I/18
218135Martin R3
229142TuranyTemporary end
242150Ružomberok-západ I/18In construction
242150Likavka R3Proposed
249155Ružomberok-sever I/59 E77In construction
251156Ivachnová R1In construction
Rest areaIvachnová
259161Ivachnová I/18
272169Liptovský Mikuláš
277172Závažná PorubaProposed
279173Liptovský Ján
284176Liptovský Hrádok
Rest areaHybe
292181Hybe I/18
297185Východná I/18
303188Važec I/18
Rest areaŠtrba
Prešov RegionPrešov Region310190Štrba
315196Mengusovce (Svit) I/18
322200Poprad-západ I/18
325202Vysoké Tatry
329204Poprad-východ I/67
341212Spišský Štvrtok I/18
350220Levoča
Rest areaLevoča
360220Spišské Podhradie I/18
368229Beharovce I/18
379235Široké I/18
382237Fričovce I/18
393244Svinia I/18
Rest areaMalý Šariš
400250Prešov-západ R4 E371
407253Prešov-juh
418260Lemešany
Košice RegionKošice Region422262Nová polhora I/20
Rest areaJanovík
427265Košice-sever I/20
433269Košické Oľšany R4 E58 E71
441274Bidovce I/19Temporary end
459285DargovProposed
462287DvoriankyProposed
472293PozdišovceProposed
Rest areaPozdišovceProposed
475295Michalovce-západProposed
483300Michalovce-východProposed
496308SobranceProposed
Rest areaJenkovceProposed
510320ZáhorProposed
511318Slovakia-Ukraine borderZáhor-Storožnica border crossing M 08 E50Proposed
Border with Ukraine; road continues as Ukrainian M08.
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Proposed
  •       Route transition
  •       Unopened
Close

Bridges and viaducts

This is a list of bridges and viaducts as seen when moving from west to east:

Viaduct Považská Bystrica
Bridge near Podtureň
More information Location, Length (m) ...
LocationLength (m)Notes
Ovsište567
Prístavný most1,080
Prievoz1,756
Horná Streda772
Beckov336
Drietoma238
Súčanka404 / 486
Újazd486 / 490
Kočkovský kanál187
Nosický kanál227
Ladce189 / 186
Pružinka902
Sverepec I443 / 480
Sverepec II315 / 310
Kunovecopen July 2010
Galanovecopen July 2010
Matúškaopen July 2010
Považská Bystrica1,444open 30 May 2010
Hričovský kanál1,695July 2010
Vrtižeropen July 2010
Plevník-Drienové
Predmier2 lanes
Dolný Hričov1,804planned; open 2012?
Lietavská Lúčka1,091planned; open 2012?
Dubná Skalaplanned
Turčianské Kľačany422planned
Turanyplanned
Krpeľanyplanned
Kraľovanyplanned
Stankovanyplanned
Hubová Iplanned
Hubová IIplanned
Liskováplanned
Podtureň1,038
Jamníček179
Belá308
Dovalovec534
Hybica571 / 565
Východná380
Jánošiková studnička381
Belianský potok347
Čierny jarok184
Važec638open 2007?
Štrba600open 2007?
Pod Skalkouopen 2008
Levočaplanned
Spišský Hrhovplanned
Beharovce2252 lanes
Studenec1022 lanes
Pongrácovce3432 lanes
Fričovce407
Malá Svinka255open 2008
Malý Šariš494open 2008
Close

Tunnels

There are total of twelve tunnels on the D1, of which eight are in operation. One of them is currently under construction, the Čebrať tunnel, which is planned to open in 2026.[16] Planned tunnels include the Korbieľka tunnel and the Havran tunnel. The Dargov tunnel might not be built in the future due to studies that found a more efficient route without the tunnel.[17] The use of tunnels comes included with the vignette.

This is a list of tunnels as seen when moving from west to east:

More information Tunnel, Length (m) ...
TunnelLength (m)Notes Maximum speed limit Vehicles per day ADR category[18]
Ovčiarsko2,275opened on January 29, 2021 100 km/h (62 mph) N/A A
Žilina651opened on January 29, 2021 100 km/h (62 mph) N/A A
Višňové7,500opened on December 22, 2025 100 km/h (62 mph) 20,000 (January 2026)[19] A
Korbieľka5,859planned N/A
Havran2,702planned N/A
Čebrať2,080under construction since 2014, planned to open in 2026 100 km/h (62 mph) N/A
Lučivná250opened on December 11, 2007 130 km/h (81 mph) N/A A
Bôrik999opened on December 8, 2009 100 km/h (62 mph) N/A A
Šibenik600opened on November 30, 2015 100 km/h (62 mph) N/A A
Branisko4,975opened on June 19, 2003 in a half profile, full profile planned 80 km/h (50 mph) 17,500 (May 2025)[20] E
Prešov2,244opened on October 28, 2021 100 km/h (62 mph) N/A A
Dargov 1,050 planned? N/A
  Planned
  Under construction
  In operation in a half profile
Close


See also

References

Related Articles

Timelines

Top Qs

Fact Checks