The Višňové tunnel (Slovak: tunel Višňové) is an automobile tunnel located on the D1 motorway segment between the cities of Lietavská Lúčka and Dubná Skala in Slovakia. With the length of 7,500 m (24,600 ft), it is the longest tunnel on the motorway and third longest in the country after the planned tunnels of Karpaty and Hradište. Its purpose is to ease off automobile traffic on the I/18 [sk] in the Žilina Region.[1][2][3]

Coordinates49°08′34″N 18°48′42″E
StatusOpen
Quick facts Overview, Location ...
Višnové tunnel
The Višňové tunnel in October 2025
Interactive map of Višnové tunnel
Overview
LocationŽilina Region, Slovakia
Coordinates49°08′34″N 18°48′42″E
StatusOpen
RouteD1 motorway
Operation
Work beganMay 22, 1998
Constructed2015–2019 (Dúha and Salini Impregilo)
2021–2025 (Skanska)
OpenedDecember 22, 2025
OwnerNational Motorway Company [sk]
TrafficAutomobile
TollNone - included with the vignette
Vehicles per day20,000 (January 2026)
Technical
Length7,500 m (24,600 ft)
No. of lanes4 (2 in each direction)
Operating speed
100 km/h (62 mph)
Max elevation1,300 m (4,300 ft)
Min elevation800 m (2,600 ft)
Tunnel clearance
4.80 m (15.7 ft)
Width7.5 m (25 ft)
Grade2.29%
Close

Traffic intensity

It was reported that in the first month after the opening, the tunnel accumulated over 600,000 vehicles passing through it with average daily traffic of 20,000.[4]