Spokane, Washington is currently home to a limited number of bus rapid transit lines. These are the only forms of high-capacity transit in the city. Historically, however, Spokane possessed a number of streetcar lines. A voter initiative to approve the development of a light rail system was defeated in 2006.

Vision

In 2000, the boards of Spokane Transit Authority and Spokane Regional Transportation Council established a steering committee, formally known as the Light Rail Steering Committee, to evaluate a high-capacity transit route between Downtown Spokane and Liberty Lake[1] to serve the growing I-90 corridor through the Spokane metropolitan area.

The vision for a regional light rail system consisted of a line that would serve urban development along the east-west I-90 corridor, connecting Spokane to Coeur d'Alene, Idaho, and a second line serving North Spokane.[2]

Early efforts focused on developing an initial line from Downtown Spokane to Liberty Lake. Future extensions would length the line west to Spokane International Airport and east to Coeur d'Alene, Idaho. A future line serving North Spokane would largely run along the North Spokane Corridor, which was originally designed to accommodate a high-capacity transit line (such as light rail) in its median.[3]

Final recommendation

Culminating six years of study, the Light Rail Steering Committee made a final recommendation to the STA and SRTC of vehicle type and alignment. The final recommendation called for the light rail to run along a 15.5-mile alignment from Downtown Spokane to Liberty Lake, with 14 stations. As part of an effort to contain costs, the system would utilize diesel multiple unit light rail train sets (eliminating the need for overhead electric infrastructure), and its alignment would largely consist of a single, bi-directional shared track, with areas of a second passing track.[4][5]

Stations

The proposed light rail line would have consisted of 14 stations,[6] 7 of which would have included park and rides:

List of proposed Spokane–Liberty Lake Light Rail stations
Station Location Notes
STA Plaza Riverside Avenue, between Post Street and Wall Street Western Terminus
Convention Center Riverside Avenue, between Bernard Street and Browne Street Stretch of roadway now hosts the westbound Riverside & Bernard City Line station
Riverpoint (Trent) On undeveloped land north of BNSF railway tracks on WSU Spokane campus Serving the Riverpoint Higher Education Park and University District
Napa Riverside Avenue, just east of Napa Street
East Central On undeveloped land in the Union Pacific Railroad right of way, just east of Freya Street
Fairgrounds South side of Spokane County Fair and Expo Center site Proposed Park and Ride
Park On undeveloped land in Union Pacific Option to construct as a future infill station
Argonne Intersection of Argonne Road and Appleway Boulevard Proposed Park and Ride
University City Adjacent to Pence-Cole Valley Transit Center Shared park and ride facility with existing transit center
Pines On undeveloped land in abandoned railroad right of way at intersection east of Pines Road Proposed Park and Ride
Evergreen On undeveloped land in abandoned railroad right of way at intersection east of Evergreen Road
Sullivan On undeveloped land in abandoned railroad right of way at intersection with Sullivan Road Proposed Park and Ride
Appleway On undeveloped land near I-90/Appleway interchange Proposed Park and Ride
Liberty Lake Adjacent to existing STA Liberty Lake Park and Ride Eastern Terminus, shared park and ride facility, with option to redevelop existing park and ride

Public vote

In August 2006, following the final project recommendations of the Light Rail Steering Committee, the Spokane Transit Authority Board approved two advisory questions to appear in November 2006 general election ballots. The first question would inquire voters about tasking STA to develop a funding plan for the project. The second question would ask voters if STA should use an existing $5 million worth of funds to start preliminary engineering work. The advisory questions would be used by STA to gauge the community's desire to continue to develop the project.[7]

Both advisory measures were defeated by voters. The first question regarding development of a funding plan failed 54% to 46%, and the vote using existing funds to continue with preliminary engineering, design and environmental analysis lost, albeit by a narrow margin, 52% to 48%.[8]

Going into the election, it was felt that the defeat of both advisory questions would put a pause to the project.[7]

Subsequent actions and efforts

The Light Rail Steering Committee was officially disbanded in December 2006, just one month after Spokane County voters turned down two advisory votes to advance the proposed light rail project.[9]

In an effort to leave open the possibility of revisiting the light rail proposal in the future, the STA Board voted to approve $5 million to help support right of way acquisition along the route's proposed alignment.[9]

Downtown Spokane streetcar

Bus rapid transit