Wikiwand AI

Hohhot–Nanning corridor

High-speed rail in the People's Republic of China From Wikipedia, the free encyclopedia

The Hohhot–Nanning corridor is a proposed high-speed railway in China running from Hohhot in Inner Mongolia to Nanning in Guangxi. It will pass through the cities of Taiyuan, Zhengzhou, Xiangyang, Changde, Yiyang, Shaoyang, Yongzhou and Guilin. Introduced in 2016, the corridor is one of the sixteen railway lines proposed under China's "Eight Vertical and Eight Horizontal" network.

StatusPartly operational
Termini
Quick facts Hohhot–Nanning corridor 呼南通道, Overview ...
Hohhot–Nanning corridor
呼南通道
Overview
StatusPartly operational
LocalePeople's Republic of China
Termini
Service
TypeHigh-speed rail
OperatorChina Railway High-speed
Technical
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed200 to 350 km/h (124 to 217 mph)
Close

Overview

The Hohhot–Nanning corridor is a vertically-oriented (north–south) corridor with a liner path emanating from Hohhot in Inner Mongolia. It will travel through the provinces of Shanxi, Henan, Hubei and Hunan, before terminating at Nanning in Guangxi. There are no branch lines.

Sections

More information Name, Route ...
Name Route Design speed
(km/h)
Length
(km)
Status Construction start Opened Remarks
Zhangjiakou–Hohhot HSR Hohhot East – Ulanqab 250 126 open 27 March 2014 3 August 2017
Ulanqab–Datong HSR Ulanqab – Datong South 250
reserved for 300km/h[1]
296 open 30 June 2020[2] 31 December 2024[3]
Datong South – Shuozhou East – Yuanping West
Datong–Xi'an HSR Yuanping West – Taiyuan South 250 139 open 3 December 2009[4] 28 September 2018[5]
Taiyuan–Jiaozuo HSR Taiyuan South – Jiaozuo 359 open 16 June 2016[6] 12 December 2020[7]
Zhengzhou–Jiaozuo ICR Jiaozuo – Zhengzhou 200 77.8 open 29 December 2009 26 December 2015[8]
Jiaozuo–Pingdingshan HSR Jiaozuo West – Luoyang Longmen – Pingdingshan West 350 240 under construction[9] June 2025 Expected in 2029
Zhengzhou–Wanzhou HSR Zhengzhou East – Pingdingshan West – Xiangyang East 350 350 open 31 October 2015 1 December 2019[10]
Xiangyang–Jingmen HSR Xiangyang East – Jingmen West [zh] 350 117 open 28 September 2022[11] 28 September 2025[12]
Hankou–Yichang HSR Jingmen West – Yichang North [zh] 350 63 open 25 September 2021[13] 26 December 2025[14] It will initially run on the same tracks as the Jingmen–Yichang section of the Shanghai–Chongqing–Chengdu HSR, but provision will be made for separate tracks.
Yichang–Changde HSR [zh] Yichang North – Changde 350 185 under construction 26 December 2025 expected in 2029
Changde–Yiyang–Changsha HSR Changde – Yiyang South 350 94 open 26 December 2017[15] 26 December 2022[16] Route shared with Xiamen–Chongqing corridor
Yiyang–Loudi HSR Yiyang South – Loudi South 350 105 being planned expected in 2028
Yiyang–Zhanjiang railway Loudi(Loudi South)– Shaoyang 200 98 open 28 July 2009[17] 6 January 2016[18] The line was rebuilt with the duplication and electrification of the original Loudi–Shaoyang section of the Yiyang–Zhanjiang railway
Shaoyang–Yongzhou HSR [zh] Shaoyang – Yongzhou 350 96 under construction 26 December 2023 Expected in 2028
Hengyang–Liuzhou ICR Yongzhou – Liuzhou Hengyang–Guilin: 200; otherwise: 250 497.9 open April 2009[19] 28 December 2013[20][21]
Liuzhou–Nanning ICR Liuzhou – Nanning 250 226 open 27 December 2007[22] 30 December 2013[23]
Nanning–Hengyang HSR Yongzhou – Nanning[note 1] 350 being planned[24] medium and long term planning May be designed as an intercity railway
Close

See also

Notes

  1. The high-speed railway line would run parallel to the existing line and is being planned separately by Guangxi

References

Related Articles

Timelines

Top Qs

Fact Checks