The Hongyanhe Nuclear Power Plant (红沿河核电站) is located in Donggang Town, Wafangdian in Liaoning Province of China. The site is within the Prefecture-level city of Dalian, 104 kilometres (65 mi) north of Dalian City proper. The first unit started commercial operations in June 2013.[1]

Official name红沿河核电站
CountryChina
LocationDonggangzhen, Wafangdian, Dalian, Liaoning
Coordinates39°47′45″N 121°28′50″E
Quick facts Official name, Country ...
Hongyanhe Nuclear Power Plant
Official name红沿河核电站
CountryChina
LocationDonggangzhen, Wafangdian, Dalian, Liaoning
Coordinates39°47′45″N 121°28′50″E
StatusOperational
Construction beganAugust 18, 2007 (2007-08-18)
Commission date
  • Unit 1: February 17, 2013 (2013-02-17)
  • Unit 2: November 23, 2013 (2013-11-23)
  • Unit 3: March 23, 2015 (2015-03-23)
  • Unit 4: April 1, 2016 (2016-04-01)
  • Unit 5: June 25, 2021 (2021-06-25)
  • Unit 6: May 2, 2022 (2022-05-02)
OwnerLiaoning Hongyanhe Nuclear Power Company Ltd.
OperatorLiaoning Hongyanhe Nuclear Power Company Ltd.
Nuclear power station
Reactor typePWR
Thermal capacity
  • 6 × 2,905 MWt
  • 17,430 MWt (Total)
Power generation
Units operational6 × 1,061 MWe
Make and model
Nameplate capacity6,710 MWe
(6,366 MWe net)
Close

Phase I consists of four CPR-1000 reactors, which is a design developed by China from the Framatome-designed PWRs at the Daya Bay Nuclear Power Plant.[2]

Phase II is the first construction of two ACPR1000 reactors,[3] further development of the CPR-1000. This reactor will include a core catcher and double containment as additional safety measures.[4]

Progress

The project was approved by the National Development and Reform Commission in April 2006, and projected to cost 23 billion Renminbi for the first two units. The cost will be shared between the China Power Investment Corporation, the China General Nuclear Power Group and two Liaoning companies.[citation needed] Liaoning Hongyanhe Nuclear Power Co., Ltd., a joint venture, is managing the construction and will be the operator of the plant once it goes online. The operator is a 45–45–10 joint venture of China Power Investment Corporation (now State Power Investment Corporation), China General Nuclear Power Group and Dalian Construction Investment Group.[5]

Construction started in summer of 2006 with excavation of two large holes that will have the reactors put in them and a containment built around them.[6] 'First concrete' for the first unit was poured in August 2007. 'Ground breaking' ceremony was held on 28 July 2010 for starting the work of two 1000 MWe CPR-1000 pressurized water reactors of phase II.[7]

On 17 February 2013 Hongyanhe 1 was connected to the grid, having started criticality testing on 16 January 2013.[8] It began commercial operation on 6 June.[1]

On 23 November 2013 Hongyanhe 2 was connected to the grid.[9]

Hongyanhe 4 achieved first criticality on 5 March 2016, was connected to the grid on 1 April 2016, and entered commercial operation on 20 September 2016.[10]

The Hongyanhe Nuclear Power Station reached full operational capacity on 24 June 2022 with total installed capacity of 6,710 MW.[11]

Reactor Data

The Hongyanhe Nuclear Power Plant consists of 6 operational reactors.

More information Unit, Type / Model ...
UnitType / ModelNet el.
power
Gross el.
power
Thermal
power
Construction
start
First
criticality
Grid
connection
Operation
start
Notes
Phase I
Unit 1PWR / CPR-1000 1061 MW1119 MW2905 MW 2007-7-182013-1-162013-2-172013-6-6 [12]
Unit 2PWR / CPR-1000 1061 MW1119 MW2905 MW 2008-3-282013-10-242013-11-232014-5-13 [13]
Unit 3PWR / CPR-1000 1061 MW1119 MW2905 MW 2009-3-72014-10-272015-3-232015-8-16 [14][15]
Unit 4PWR / CPR-1000 1061 MW1119 MW2905 MW 2009-8-152016-3-52016-4-12016-6-8 [10][16]
Phase II
Unit 5PWR / ACPR1000 1061 MW1119 MW2905 MW 2015-3-292021-06-132021-06-252021-7-31 [17][18][19][20]
Unit 6PWR / ACPR1000 1061 MW1119 MW2905 MW 2015-6-242022-04-212022-05-022022-06-23 [21][19][22]