Hoopeston Wind Farm

From Wikipedia, the free encyclopedia

CountryUSA
Coordinates40°22′59″N 87°47′17.9″W / 40.38306°N 87.788306°W / 40.38306; -87.788306
StatusActive
OwnerApex Wind Energy
Hoopeston Wind Farm
CountryUSA
Coordinates40°22′59″N 87°47′17.9″W / 40.38306°N 87.788306°W / 40.38306; -87.788306
StatusActive
OwnerApex Wind Energy
Wind farm
Type
Rotor diameterdiameter 100 m
Power generation
Units operational49 x 2.0 mW
Make and modelVestas V100/2000
Storage capacity98 MW

The Hoopeston Wind Farm is a 49-turbine wind farm in northern Vermilion County in Illinois.[1] Investment capital for the project was organized by IKEA, which did so to earn clean-energy tax credits for the stores that it operates. IKEA hired Apex Clean Energy to build the complex.[2]

References

Related Articles

Wikiwand AI