Construction began1972
Commission dateJanuary 1977 (Unit 1)[1]
December 1977 (Unit 2)
March 1980 (Unit 3)[2]
1985 (Unit 4)[3]
OwnerTaipower
OperatorTaipower
Thermal power station
Primary fuelOil
Power generation
Units operational2 X 500 MW
Nameplate capacity1,000 MW
External links
CommonsRelated media on Commons

The Hsieh-ho Power Plant (traditional Chinese: 協和發電廠; simplified Chinese: 协和发电厂; pinyin: Xiéhé Fādiànchǎng) is an oil-fired power plant in Zhongshan District, Keelung, Taiwan.[4] The power plant is the only fully oil-fired power plant in Taiwan.

The construction of the power plant began in 1972.[5] The power plant started its operation after the commissioning of its first generation unit in January 1977.

Generation units

The power plant consists of four 500-MW generation units. The third 500-MW unit was finished on 19 December 1979 after a record-breaking construction period of 26 months. It went into operation in March 1980. The fourth 500-MW unit was completed in 1985 after 29 months construction period.[2][3]

The units 1 and 2 were decommissioned on Dec. 31, 2019.[6]

Components

The steam generator is rated at 1,701 tonne/hour, 176 kg/cm2 and 542 °C at superheater outlet and reheat to 542 °C.

The steam turbine is a tandem-compound with four flow exhaust, 3,600 rpm single reheat with throttle steam conditions of 166 kg/cm2, 538 °C with reheat to 538 °C.

The stacks are 200 meters high slip-form reinforced concrete stack.