Wikiwand AI

Huairou–Daxing Airport intercity railway

Higher-speed rail in Beijing and Hebei, China From Wikipedia, the free encyclopedia

Huairou–Daxing Airport intercity railway[1][2] (Chinese: 怀兴城际铁路; pinyin: Huái–Xīng Chéngjì tiělù), formerly known as Capital Airport–Daxing Airport intercity railway connecting line (Chinese: 首都机场至大兴机场城际铁路联络线[5]), is a higher-speed railway line currently under construction. The speed will be 200 km/h.[4] It will connect the Beijing Capital International Airport and Beijing Daxing International Airport when the full line is completed.[6]

StatusIn operational
LocaleBeijing and Hebei
Termini
Quick facts Huairou–Daxing Airport intercity railway, Overview ...
Huairou–Daxing Airport
intercity railway[1][2]
Overview
StatusIn operational
LocaleBeijing and Hebei
Termini
Service
TypeHigher-speed rail
OperatorChina Railway Beijing Group
History
Opened28 December 2024[3]
Technical
Line length39.438 km (Phase 1)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed200 km/h[4]
Close

Phase 1 of the railway, which is currently under construction, will connect Langfang North station in Langfang, Hebei Province) and Beijing Daxing International Airport. Phase 1 is 39.438 km, including 15.3 km in Beijing and 24.138 km in Hebei Province.[6] Phase 1 of the railway is opened for service on 28 December 2024.[3]

The second phase from Langfang East railway station to Huairou South railway station via Capital Airport is under planning.[5]

Stations

Phase 1

Phase 1 of the railway (Daxing Airport to Langfang East) is shared with the Langzhuo (Langfang–Zhuozhou) intercity railway (Chinese: 廊涿城际铁路).

More information Station Name, Total distance (km) ...
Station Name[7][8] Total distance (km) Travel Time Transfer Location
English Chinese
Through train to China Railway  Jinxing 
Daxing Airport[7] 大兴机场 0 Beijing Subway  Daxing Airport 

China Railway  Jingxiong 
Beijing Daxing International Airport PKX

Guangyang District, Langfang, Hebei[a]
Lixian[8] 礼贤 6.268 Daxing District, Beijing
Langfang West[7] 廊坊西 18.078 Guangyang District, Langfang, Hebei
Langfang North[7] 廊坊北 28.018
Close


Phase 2 (under planning)

The Phase 2 of the railway will be replaced by New Town Link Line (S6) of Beijing Subway and the stations on the line have not announced.

Notes

  1. Actual location.

References

Related Articles

Timelines

Top Qs

Fact Checks