Wikiwand AI

Iași–Chișinău pipeline

Natural gas pipeline in Romania and Moldova From Wikipedia, the free encyclopedia

The Iași–Chișinău pipeline, also known as the Iași–Ungheni–Chișinău pipeline, is a natural gas pipeline going from Iași in Romania to Chișinău in Moldova.[1][2][3] The pipeline was inaugurated in 2014 and connected Iași with the Moldovan town of Ungheni. It was extended to the capital Chișinău in 2019, with the compressor stations being put into operation in 2021. However, it was not used until the 2022 Moldovan energy crisis.[1]

CountryRomania and Moldova
DirectionWest–east
PassesthroughRomania and Moldova
Quick facts Location, Country ...
Iași–Chișinău pipeline
Location
CountryRomania and Moldova
DirectionWest–east
StartIași, Romania
Passes throughRomania and Moldova
ToChișinău, Moldova
General information
TypeNatural gas
Technical information
Length150 km (93 mi)
Maximum discharge
1,850,000,000 cubic metres (6.5×1010 cubic feet) per year
Close

The pipeline is 150 kilometres (93 miles) long[2][3] and has a capacity of 5,076,000 cubic metres (179,300,000 cubic feet) of gas per day, or about 1,850,000,000 m3 (6.5×1010 cu ft) per year. It cost Romania's Transgaz state-owned company about 150 million euros.[3] It supplies gas from Romania to Moldova through a reverse flow of the Trans-Balkan pipeline.[4]

In 2024, then Minister of Energy of Moldova, Victor Parlicov, stated that the pipeline was a real lifesaver for Moldova's energy security during the energy crisis in 2022, when Russia's Gazprom unilaterally reduced the volume of gas delivered to Moldova. The pipeline permitted Moldova to obtain gas from the European market, allowing it to overcome the crisis.[2] As of late 2023, Moldova no longer imported gas from Russia.[4]

References

Related Articles

Timelines

Top Qs

Fact Checks