Indian locomotive class WAG-11

Indian Railway freight class twin section cab electric locomotive From Wikipedia, the free encyclopedia

The Indian locomotive class WAG-11 is a class of twin-section 25 kV AC electric locomotives that was developed in 2018 by Banaras Locomotive Works (BLW), Varanasi for Indian Railways. This freight engine has been designed for a speed of 105 km/h and weighs 252 tons. It is equipped with a three-phase induction motor, four power converters and regenerative as well as pneumatic braking system.[1] The model name stands for broad gauge (W), Alternating Current (A), Goods traffic (G), and 11th in series (11). They entered trials service in 2019. A total of 4 WAG-11 pairs have been built by Banaras Locomotive Works (BLW), Varanasi.

Power typeElectric
Power typeElectric
DesignerBLW
BuilderBLW
Quick facts WAG-11, Type and origin ...
WAG-11
BNDM based WAG-11 (no. 29004) at BLW yard
Type and origin
Power typeElectric
DesignerBLW
BuilderBLW
Build date2018 – present
Total produced4
RebuilderBLW
Rebuild date2019-01-01
Specifications
Configuration:
  AARTwin C-C, C'C'
  UICTwin Co-Co, Co'Co'
Gauge5 ft 6 in (1,676 mm)
TrucksHTSC
Wheel diameterNew: 1,092 mm (3 ft 7 in)
Full-worn: 1,016 mm (3 ft 4 in)
Length:
  Over beams2X 21,244 mm (69 ft 8 in)
Width3,180 mm (10 ft 5 in)
Height:
  Pantograph4,255 mm (14 ft 0 in)
Axle load48,500 lb (22,000 kg)
Loco weight252 tonnes (248 long tons; 278 short tons) 2*126 Ton
Power supply25 kV 50 Hz AC Overhead
Electric system/s25 kV 50 Hz AC Overhead
Current pickupWBL - 85 HR pantograph
AlternatorTA-17-CA6A AC
Traction motors2*6nos.,3-Phase Induction motor, AC traction motors @ 2180V
  Continuous1,000 hp (750 kW)
Gear ratio17:90
Loco brakeAir Pneumatic Regenerative brake
Train brakesAir
Safety systemsTPWS (Train Protection and Warning System), Vigilance Control, Slip/Slide Control, Main Overload Relay, No Volt Relay, Over Voltage Protection and Earth Fault Relay
CouplersH - type transition coupler
Performance figures
Maximum speed105 km/h (65 mph)
Power output12,000 hp (8,950 kW) / 12,000 hp (8,950 kW)
Tractive effort2*540 kN (120,000 lbf)
Brakeforce2*270 kN (61,000 lbf)
Career
OperatorsIndian Railways
Numbers29001+
Official nameWAGC4
Delivered2018-09-01
First run2019-01-01
DispositionActive
currently undergoing trials
Close

As of January 2023, 4 locomotives are built and are undergoing "testing", with further examples being converted from WDG-4 to WAG-11.

History

The history of WAG-11 begins in the early 2017 with the stated aim of the Indian Railways to minimize the dependence on diesel locomotives in Indian Railways after recommendation of Cabinet Committee on Economic Affairs (CCEA).[2][3] The committee recommended that Expansion of electrified routes across the country will also help in reducing energy cost.[4] Therefore, a large number of WDG-4 diesel locomotives would become surplus after full electrification.[5] Thus Indian Railways decided to convert existing WDG-4 locomotives which needed midlife overhaul into the WAG-11 electric locomotive class.

The same old GT46MAC (WDG-4) traction motors are being used for WAG-11. The locomotives had GTO propulsion, a few parts can not be leveraged for the rebuilt to IGBT technology. However, since the power supply now comes from the WAG9 transformer / control, ABB has been updating its WAG9 control software for the EMD 3 phase traction motors for best results.[6] As a result, the diesel power pack of the locomotive will be decommissioned and used as spare parts for interim use since there are still 150+ more GTO WDG-4 in use.

The first WAG-11 unit was allocated TKD for trials and performance monitoring.[7] They are fitted with high rise pantographs and have regenerative braking.[8] After initial testing another unit was built and these 2 locomotives were transferred to Bondamuda (BNDM) for examining working conditions hauling heavy load goods trains.[9] The third prototype pair came out of DLW shop but this pair is different from the previous two pairs because both of the locos have twin cabs and twin pantographs and are separately numbered: 29003 and 29004. It looks like they can be separately operated like any regular WAG-9. Also the height and construct of these two locos are extremely similar to WAG-9s.

Difference

There are quite a few differences between the two earlier prototypes of WAG-11 and 29003/29004. They are in the following lines:[10]

  • Instead of an articulated design, DLW made both locos as twin cab locos (they may be able to independently operated after decoupling)
  • Two pantographs each on both the locos - making is 4 pantographs for 29003 unit
  • The loco shell is placed at the same height as a WAP-7/WAG-9 and is carefully covering the chassis. In earlier versions, the EMD chassis / under-frame was used and was visible. 29003/29004 almost looks like they are made on WAG-9 chassis / under-frame and EMD bogies/traction motors have been used.
  • The cow-catcher is new and of typical WAP-7/WAG-9 net design. The solid EMD cowcatcher has been discontinued.
  • On top of the cabs, either a dynamic brake radiator or rooftop AC has been installed.
A WAG-11 with the Serial Number of 29003

Units

More information No, Current class ...
Locomotives in class
No Current class locomotive number Previous class and Road no Previous shed Status
1 WAG-11 29001 (pair) WDG-4 (12011 & 12018) Hubli (UBL) Currently undergoing trials[as of?]
2 WAG-11 29002 (pair) WDG-4 (12014 & 12017) Hubli (UBL) Currently undergoing trials[as of?]
3 WAG-11 29003 (single) WDG-4 (12012) Hubli (UBL) Currently undergoing trials[as of?]
4 WAG-11 29004 (single) WDG-4 (12013) Hubli (UBL) Currently undergoing trials[as of?]
Close
More information S.N., Version 1 (29001) ...
Comparison of three versions of WAG-11[11]
S.N. Version 1 (29001) Version 2 (29002) Version 3 (29003/29004)
1 Transformer mounted on board. Transfer under slung mounted. Transfer under slung mounted.
2 Transformer common to WAP-7/WAG-9. New design transformer used. Transformer common to WAG-9.
3 New equipment layout in which both power converters were on left side of loco. One before transformer other behind it. Equipment layout similar to WAG-9. Both power converters centrally placed above the transformer. Equipment layout similar to WAG-9.
4 Under slung battery box of WAG-9/WAP-7 used. Battery placed on board. Under slung battery box of WAG-9/WAP-7 used.
5 One end cab used. One end cab used. Both end cab with HVAC as in WAG-9.
6 Side wall modified from WAP-7 side wall and length increased by approx 3 metres. Side wall modified from WAP-7 side wall and length increased by approx 3 metres. Side wall and both cabs same as in WAG-9.
7 Roofs made in 5 parts due to location of power converter and MMD height. Roof made in 4 parts only as both the traction converters are placed centrally. Roof in 3 parts same as in WAP-7/WAG-9.
8 Underframe made by modifying WGD-4 underframe. Underframe made by modifying WGD-4 underframe. Underframe made by modifying WAP-7 underframe.
Advantages of WAG-11 (version 3) over WAG-11 with modified under-slung transformer:
  • No need to modify WDG-4 underframe, particularly partially cutting center sill, I-beam, and bottom plate.
  • Exactly similar layout of WAG-9 used.
  • Transformer common to WAG-9.
  • Can also work as a single unit.
  • Cost reduction due to use of complete shell similar to WAG-9 (with some changes for ensuring interfacing with WDG-4 MTA).
Close
Technical Data[12]
1 Type of Service Freight
2 Axle Arrangement Twin Co-Co
3 Horse power 2x6000 HP
4 Tractive effort (Stall, Continuous) 2x540 KN (Stall), 2x400 KN (Continuous)
5 Speed Potential 95 kmph (As per final speed certificate)
6 Gear Ratio 17:90
7 Length over buffer 2x21244 mm
8 Overall width 3180 mm
9 Max. height with pantograph locked 4255 mm
10 Total weight 2x126 T
11 Traction Motor 2x6 nos, 3-phase induction motor
12 Power of TM (KW) 703 (Continuous), 758 (one hour rating)
13 Braking Regenerative, Pneumatic
14 Braking effort 2x270 KN
15 Power supply to aux 1, 2, 3 converter 415 V +/- 10%, 0 to 50 Hz
16 Battery voltage 110 V
17 Power supply to TM 2180 V
18 No of power converters 2

For Conversion

Railway Board sent a circular to identify 16 WDG-4 locos that would be converted to WAG-11 during the financial year 2020–2021.[13]

More information No, locomotives class ...
No locomotives class Previous shed locomotive number Status ref
1. WDG-4 Hubli (UBL) 12002 to be converted in 2020-2021 by NR [14]
2. WDG-4 Hubli (UBL) 12003 conversion scheduled for March 2020 [15]
3. WDG-4 Hubli (UBL) 12004 conversion scheduled for March 2020 [16]
4. WDG-4 Hubli (UBL) 12005 to be converted in 2020-2021 by NR [17]
5. WDG-4 Hubli (UBL) 12006 to be converted in 2020-2021 by NR [18]
6. WDG-4 Hubli (UBL) 12007 converted to WAG-11 #29002 [19]
7. WDG-4 Hubli (UBL) 12008 conversion scheduled for March 2020 [20]
8. WDG-4 Hubli (UBL) 12009 conversion scheduled for March 2020 [21]
9. WDG-4 Hubli (UBL) 12010 scheduled for March 2020 [22]
10. WDG-4 Hubli (UBL) 12011 converted to 'WAG-11' #29001 [23]
11. WDG-4 Hubli (UBL) 12012 converted to 'WAG-11' #29003 [24]
12. WDG-4 Hubli (UBL) 12013 converted to 'WAG-11' #29004 [25]
13. WDG-4 Hubli (UBL) 12014 converted to 'WAG-11' #29002 [26]
14. WDG-4 Hubli (UBL) 12015 to be converted in 2020-2021 by SR [27]
15. WDG-4 Krishnarajapuram (KJM) 12016 to be converted in 2020-2021 by SR [28]
16. WDG-4 Hubli (UBL) 12017 converted to 'WAG-11' #29002 [29]
17. WDG-4 Hubli (UBL) 12018 converted to 'WAG-11' #29001 [30]
18. WDG-4 Hubli (UBL) 12019 to be converted in 2020-2021 by SR [31]
19. WDG-4 Hubli (UBL) 12020 to be converted in 2020-2021 by SR [32]
20. WDG-4 Krishnarajapuram (KJM) 12021 to be converted in 2020-2021 by SR [33]
21. WDG-4 Hubli (UBL) 12022 to be converted in 2020-2021 by SER [34]
22. WDG-4 Hubli (UBL) 12023 to be converted in 2020-2021 by SER [35]
23. WDG-4 Hubli (UBL) 12024 to be converted in 2020-2021 by SER [36]
24. WDG-4 Krishnarajapuram (KJM) 12025 to be converted in 2020-2021 by SR [37]
25. WDG-4 Krishnarajapuram (KJM) 12026 to be converted in 2020-2021 by SCR [38]
26. WDG-4 Krishnarajapuram (KJM) 12027 to be converted in 2020-2021 by SCR [39]
27. WDG-4 Krishnarajapuram (KJM) 12028 to be converted in 2020-2021 by SCR [40]
28. WDG-4 Krishnarajapuram (KJM) 12029 to be converted in 2020-2021 by SCR [41]
29. WDG-4 Krishnarajapuram (KJM) 12030 to be converted in 2020-2021 by SER [42]
Close

Locomotive shed

More information Zone, Name ...
ZoneNameShed codeQuantity
SERBondamundaBNDM4
Total Locomotives Active as of May 20254
Close

See also

References

Related Articles

Wikiwand AI