Interstate 11

Interstate Highway in the U.S. state of Nevada From Wikipedia, the free encyclopedia

Interstate 11 (I-11), officially known as the Purple Heart Highway, is an Interstate Highway that runs for 54.193 miles (87.215 km) on a predominantly northwest–southeast alignment in the U.S. state of Nevada. It runs concurrently with either or both US 93 and US 95 from the Arizona state line (at the Mike O'Callaghan–Pat Tillman Memorial Bridge over the Colorado River within the Lake Mead National Recreation Area outside of the city limits of Boulder City) to Kyle Canyon Road (SR 157) in Las Vegas.

Length54.193 mi[1] (87.215 km)
ExistedAugust 16, 2017[2]–present
NHSEntire route
Southend US 93 at the Arizona state line
Quick facts Route information, Length ...
Interstate 11 marker
Interstate 11
Purple Heart Highway
I-11 highlighted in red
Route information
Maintained by NDOT
Length54.193 mi[1] (87.215 km)
ExistedAugust 16, 2017[2]–present
NHSEntire route
Major junctions
South end US 93 at the Arizona state line
Major intersections
North end Future I-11 / US 95 / SR 157 in Las Vegas
Location
CountryUnited States
StateNevada
CountiesClark
Highway system
  • Nevada State Highway System
US 6NV I-15
Close

The freeway is tentatively planned to run from Nogales, Arizona, to Fernley, Nevada, generally following the current routes of I-19, I-10, US 93, and US 95.[3] Planners anticipate upgrading four existing highway segments to carry future I-11: US 93 in Arizona (from Kingman to the Nevada state line and from Kingman to Wickenburg), US 95 in Nevada (from the Las Vegas Valley to Schurz), and either US 95 (via Fallon) or US 95 Alt (via Yerington) to Fernley.[4] The most recent extension came in 2024, when officials replaced I-515 signs in Las Vegas with I-11 signs and added I-11 signs on US 95 north of Downtown Las Vegas, which extended I-11 northward about 30.5 miles (49.1 km).[5] An extension of the Interstate northward along US 95 to Mercury, Nevada, is planned after that. An exact alignment for I-11 south of Wickenburg has yet to be determined; a number of corridor alternatives, however, have been identified for further study and refinement.

The building of I-11 in Arizona as a freeway bypass from I-19 in Sahuarita to US 93 in Wickenburg is controversial as it is currently facing fierce local opposition and backlash from conservation groups and others citing costs, environmental, traffic, economic and safety concerns. The project is currently on hold pending litigation as of 2025.

The numbering of this highway did not initially fit within the usual conventions of the existing Interstate Highway grid as the whole route was east of I-15. I-17 was already built to the east of the I-11 alignment in Arizona, making it impossible to fit this freeway's Interstate number into the national grid and remain within the traditional numbering convention. I-11 being extended along US 95 through Las Vegas and crossing over I-15 remedied this situation since it put a portion of I-11 west of I-15 and, thus, in line with the national grid numbering conventions.[5]

Route description

The highway currently begins at the Arizona state line at the Mike O'Callaghan–Pat Tillman Memorial Bridge, then runs along the 15-mile (24 km) Boulder City Bypass around Boulder City, which opened on August 9, 2018. It is signed concurrently with US 93 throughout. An at-grade intersection just north of the Buchanan Boulevard overpass is for emergency vehicles only. At mile 14, I-11 intersects and joins with US 95 heading north.[6] Continuing northwest, the highway runs along the former I-515 around Henderson to the Henderson Spaghetti Bowl interchange with I-215 and Lake Mead Parkway (SR 564).[5]

In May 2024, I-11 was extended through the Las Vegas Valley along US 93/US 95 (the rest of the alignment of former I-515) to Downtown Las Vegas and I-15, then running concurrently with US 95 northwest to SR 157. When this segment was designated, I-515 was decommissioned.[5] Studies to extend I-11 from SR 157 northward to Mercury were started in late 2023.[7][8]

From I-15 to Elkhorn Road, I-11 and US 95 have HOV lanes that are currently enforced by both LVMPD (aka Metro) and NSP (formerly NHP).[9][10]

History

As recently as 1997, US 93 was mostly a two-lane road between Wickenburg and Hoover Dam and was known for its dangerous curves and hills in the stretch between Wickenburg and I-40. In the late 1990s, the Arizona Department of Transportation (ADOT) began widening US 93 to four lanes and, in some areas, building a completely new roadway. In other places along the route, ADOT simply repaved the old highway and built two new lanes parallel to it. ADOT also began studying the possibility of adding grade separations to US 93 near the Santa Maria River to make the road a full freeway.

At the same time, Nevada[11] and Arizona began looking at US 93's crossing of Hoover Dam, a major bottleneck for regional commerce, with hairpin turns, multiple crosswalks for pedestrians, and steep grades. Plans for a bridge to bypass the dam became even more urgent when the road was closed to trucks after the September 11 attacks in 2001, forcing commercial traffic to detour through Bullhead City, Arizona, and Laughlin, Nevada, causing major transport delays as a result.

The Mike O'Callaghan–Pat Tillman Memorial Bridge, a completed alignment of I-11 near Hoover Dam in 2010

With the completion of the Mike O'Callaghan–Pat Tillman Memorial Bridge on October 14, 2010,[12] the vast majority of the roadway was now a four-lane divided highway. Still, with Phoenix and Las Vegas as the two largest neighboring cities in the U.S. not connected by an Interstate, leaders in both cities lobbied to include I-11 in the next Transportation Equity Act for the 21st Century re-authorization. With the rise of the concept of "megapolitan" urban regions, I-11 is considered a key connector to unify the triangle formed by Las Vegas, Phoenix, and the Los Angeles area (the triangle consisting of I-15 to the north/west, I-10 to the south, and I-11 on the east).[13] The Federal Highway Administration (FHWA) approved the Nevada Department of Transportation (NDOT)'s environmental review of a bypass around Boulder City, which would connect the end of the recently-constructed Hoover Dam Bypass bridge east of Boulder City to I-515 west of the town.[14]

In December 2013, University of Nevada, Las Vegas, researchers discovered naturally-occurring asbestos along the route of the Boulder City Bypass. Containing the asbestos and monitoring the surrounding air to keep workers safe was estimated to cost at least an additional $12 million (equivalent to $15.9 million in 2024[15]).[16] Work was completed without any Occupational Safety and Health Administration incidents, with 14,000 air samples taken during the construction.[17]

On March 21, 2014, "Future I-11 Corridor" signs were installed along the US 93 corridor.[18] On May 21, 2014, NDOT submitted an application to the American Association of State Highway and Transportation Officials (AASHTO) to request the creation of the I-11 designation between the Arizona state line and the I-215/I-515 Interchange in Henderson.[19] AASHTO approved this request at their Spring 2014 Special Committee on US Route Numbering meeting, contingent on FHWA approval.[20] On June 13, 2017, the advisory question[21] regarding the extension of Buchanan Boulevard to I-11—including interchange plans—via Boulder City Question 2[22] were opposed by voters.[23][24] On August 16, 2017, the first southbound segment was opened to traffic, with its accompanying northbound segment opening on January 27, 2018.[25] On February 20, 2018, NDOT opened additional ramps connecting the new Railroad Pass Casino Road to both the Boulder City Parkway (formerly US 93 and US 95, now US 93 Business) and to I-11 (southbound exit and northbound entrance).[26] The final portion of Phase 1—between the new casino access road and US 95—opened on May 23, 2018.[27][28] On August 9, 2018, Phase 2 was opened to traffic, officially completing the Boulder City Bypass.[29]

I-11 sign in Henderson with US 93/US 95 shields in 2018

Phase 2, which began construction on April 6, 2015,[30] was expected to open by October 2018;[31] in May 2018, however, the Regional Transportation Commission of Southern Nevada (RTC) announced that the section would be open by June 2018, three months ahead of schedule.[32][33] That opening date was subsequently pushed back to August 9, 2018, as it was still in the post-construction stage.[34] In March 2019, NDOT replaced I-515 signs along its southernmost five miles (8.0 km) with I-11 signs.[35]

The 80th session of the Nevada Legislature passed a bill designating the entire route of I-11 in the state as the Purple Heart Highway, which went into effect on July 1, 2019.[36][37]

On June 20, 2022, NDOT decided to route I-11 along the existing alignments of I-515/US 93/US 95 to Downtown Las Vegas, then running concurrently with US 95 northwest to SR 157 rather than use I-215 or construct a new corridor as had been proposed but abandoned due to opposition.[38][39] NDOT replaced I-515 shields with I-11 shields in this area in 2024 and plans to finish adding I-11 shields all the way through the Las Vegas Valley by 2025. This extended I-11 northward about 30.5 miles (49.1 km) and eliminated the I-515 designation.[7][40]

Beginning in 2022, several construction projects were started or planned to improve the I-515 corridor before it became I-11. The projects included soundwall and retaining wall reconstruction, bridge rehabilitation and interchange improvements. All the projects are expected to be started by 2027.[41]

Current status

As of January 2026, I-11 is entirely in Clark County, Nevada, extending from the Arizona state line on the Hoover Dam Bypass through Las Vegas to SR 157 northwest of the city.[5][42][29][35] An extension to Mercury is currently[as of?] being planned.[8] The Nevada portion of the original I-11 corridor is a full freeway that meets current Interstate Highway standards from the Mike O'Callaghan–Pat Tillman Memorial Bridge on US 93 to the northwest of Las Vegas on US 95. While the bulk of US 93 through Arizona has been widened to four lanes, some portions of the corridor are not built to Interstate Highway standards, as there are scattered at-grade intersections, substandard roadway and shoulder widths, median crossovers, and other deficiencies. Part of these dual roadways are repaved, restriped sections of very old parts of US 93. Farther south, a direct system interchange with US 93 and I-40 is planned to eliminate the bottleneck at Beale Street in western Kingman; once this interchange is completed and all at-grade intersections of US 93 between Kingman and Hoover Dam are eliminated, I-11 will be extended south into Arizona to I-40 in Kingman.[43] The first phase of construction began in 2024 and will finish in 2026.[44] It will construct direct connectors from westbound I-40 to northbound US 93 and from southbound US 93 to eastbound I-40. The remaining movements between US 93 and I-40 will continue to use the existing Beale Street interchange until traffic demands warrant and the second phase can be funded.[45][46]

Phase 4 of the US 93 Corridor Improvement Project will finish what was started in 1998 and connect the four sections of the divided highway to Wickenburg, allowing more traffic on these congested roads. US 93 will be cosigned as I-11 once it is built to Interstate standards.[47][48]

Funding

The funding bill for the U.S. Department of Transportation, which replaced stopgaps that expired on June 30, 2012, officially designated I-11. This bill sped up funding for studying, engineering, and possibly building the highway. The Arizona State Legislature passed a law in 2009 that allowed private investors to team up with ADOT. In July 2012, Nevada's Transportation Board awarded $2.5 million (equivalent to $3.37 million in 2024[15]) in contracts to a team of consultants to study I-11's feasibility and its environmental and economic consequences.[49]

Intermountain West corridor plans

I-11 was previously projected to serve as an Intermountain West part of the U.S.'s long-term CANAMEX Corridor transportation plans, with potential extensions south from Casa Grande to the Sonoran border, and north from Las Vegas through northern Nevada (potentially passing through Reno or Elko) and onward through either eastern OregonWashington or western Idaho before terminating at the Canadian border.[50] I-11 is projected to become the Intermountain West Corridor, extending from Phoenix and Las Vegas through Reno to the Pacific Northwest via central or eastern Oregon and central Washington to the Canada–United States border.[51] Feasibility studies for these corridor extensions began in July 2013 and were published in November 2014.

Arizona extension plans

Officials in Pima County, Arizona, supported an extension of the planned I-11 from Casa Grande, which would wrap southwest of the Tucson Mountains before meeting with I-19 in Sahuarita, south of Tucson, and continuing east to I-10.[52] Over 800 residents signed a petition opposing that west-side bypass because it would impact the Arizona-Sonora Desert Museum, Saguaro National Park, and Ironwood Forest National Monument. They recommended that I-11 be concurrent with existing I-10 route through Tucson. The additional segment would create the Tucson bypass route identified as a critical need by ADOT based upon I-10 traffic projections.[53][54][55] In 2019, the draft tier 1 environmental impact statement selected the Tucson bypass route as the recommended corridor alternative, with the corridor parallel to I-10 until Casa Grande and a connection to I-10 in Marana.[56] Although seen as beneficial to some people,[57] the plan to build I-11 in Arizona as a whole is still receiving pushback and conservation groups are currently suing the FHWA over the construction of the route.[58][59][60][61]

Northern Nevada extension plans

The proposal to extend I-11 to the Reno area was supported by both of Nevada's U.S. Senators, Harry Reid and Dean Heller, as well as the rest of Nevada's delegation to the U.S. Congress. Heller stated that connecting the Phoenix area with Las Vegas and Northern Nevada would "spur long-term economic development, create jobs and bolster international trade".[62] As originally proposed in the 2012 Moving Ahead for Progress in the 21st Century Act, the highway would run only from Casa Grande, Arizona, to Las Vegas.[63] This was to provide a Las Vegas–Phoenix freeway link. Extensions of the corridor to the north toward Reno and to the south toward Nogales, however, have since been approved by the 2015 Fixing America's Surface Transportation Act (FAST Act) but not to extensions north of I-80.[3]

The Reno City Council was informed of potential I-11 corridor plans on March 15, 2018.[64]

North of its current terminus, I-11 is expected to follow and become co-signed with US 95 from Las Vegas to Schurz or Fallon pending upgrades to Interstate standards.

North of Tonopah, the route is undecided, with various different proposed routings through Northern Nevada. These include a route through Yerington that roughly parallels SR 208 until just before the Topaz Lake area, then takes a new route into Gardnerville and Minden before meeting up with current I-580 in Carson City, which it follows to its terminus of I-80 in Reno. The other potential corridors stick closer to US 95, with one following US 95 Alternate (US 95 Alt.) through Silver Springs to meet I-80 in Fernley, while another would take a new route east of Silver Springs to Fernley, meeting current US 50 Alt. west of Fallon, which would then go to I-80 and US 95 Alt in Fernley. Another proposed route would go east of Mina and Luning and go north through Salt Wells before meeting US 95 north of Fallon, which then meets I-80 farther north. Other minor alterations to these routes were also shown.

On July 26, 2018, NDOT selected the future northbound terminus of I-11 to I-80 and US 95 Alt. in Fernley near Reno and Sparks as there are only 2 options under consideration: US 95, US 50 and US 50 Alt. (Fernley East Connection aka Fallon option) and US 95 Alt. and US 50 Alt. (Fernley West Connection aka Yerington option) as the rest of them were removed from consideration.[65]

Exit list

Old exits on I-11 were formerly exits on I-515 and US 95 numbered according to US 95 mileposts.

More information County, Location ...
CountyLocationmi[66][1]kmOld exitNew exitDestinationsNotes
Colorado River0.0000.000
US 93 south Kingman, Phoenix
Southern end of US 93 concurrency; southern terminus; continuation into Arizona as US 93
Mike O'Callaghan–Pat Tillman Memorial Bridge
ClarkLake Mead NRA2.0293.2652

US 93 Bus. north (Boulder City Parkway) / SR 172 east (Hoover Dam Access Road) Boulder City, Hoover Dam
Southern terminus of US 93 Bus.; western terminus of SR 172; former US 93/US 466
Boulder City13.59021.87114
US 95 south / SR 173 north Searchlight, Boulder City
Southern end of US 95 concurrency; southern terminus of SR 173; SR 173 north was formerly part of US 95 north
Henderson14.823.815ARailroad Pass Casino Road
15.324.615B

US 93 Bus. south (Boulder City Parkway)
Southbound exit and northbound entrance; northern terminus of US 93 Bus.; former US 93/US 95 south/US 466 east
17.23827.74256A17AWagon Wheel Drive / Nevada State DriveSigned as exit 17 southbound; serves Nevada State College
56B17BBoulder Highway (SR 582 north)Northbound exit and southbound entrance; southern terminus of SR 582; former US 93/US 95 north/US 466 west
18.93530.4735719College DriveServes College of Southern Nevada, Henderson Campus
20.79133.4605920Horizon DriveDiverging diamond interchange
22.818–
22.845
36.722–
36.765
6123

I-215 west (Bruce Woodbury Beltway) / SR 564 east (Lake Mead Parkway)
Eastern terminus and exit 1 on I-215; western terminus of SR 564; former SR 146; serves St. Rose Dominican Hospital – Rose de Lima Campus
23.838.362Auto Show Drive
25.140.46464ASunset RoadFormer SR 562
25.741.464B Galleria DriveOpened on November 4, 2009; serves Henderson Hospital
26.943.365Russell RoadServes Sam Boyd Stadium
Paradise29.146.868 Tropicana Avenue (SR 593) Harry Reid International Airport
30.148.469Flamingo Road (SR 592)
Sunrise ManorWinchester line31.650.970Boulder Highway (SR 582)Former US 93/US 95/US 466
Las VegasSunrise Manor line33.253.472Charleston Boulevard (SR 159)
Las Vegas34.956.273Eastern AvenueFormer SR 607
36.358.475ALas Vegas Boulevard Downtown Las Vegas, Cashman CenterSigned as exit 36 northbound; former SR 604/US 91/US 93/US 95
36.558.775BCasino Center Boulevard (SR 602 south) Downtown Las VegasSouthbound exit only; northbound entrance is via 4th Street
37.26259.96776
I-15 / US 93 north Los Angeles, Salt Lake City
Northern end of US 93 concurrency; Spaghetti Bowl; signed as exits 76A (south) and 76B (north); signed as the reverse southbound; exit 42 on I-15

I-15 south
Southern end of HOV lane; Spaghetti Bowl; HOV access only; southbound exit and northbound entrance
37.660.576CMartin L. King Boulevard
38.461.877

US 95 Bus. north (Rancho Drive, SR 599)
Former US 95 Alt.; serves University Medical Center and Valley Hospital Medical Center
39.463.478Valley View BoulevardSouthbound exit is part of exit 79
40.264.779Decatur Boulevard
41.266.380Jones Boulevard (SR 596)
42.468.281C
SR 613 west (Summerlin Parkway)
HOV access only; northbound exit and southbound entrance; SR 613 east exit 6D
81
SR 613 west (Summerlin Parkway) / SR 595 south (Rainbow Boulevard)
Signed as exits 81A (Summerlin) and 81B (Rainbow) northbound; SR 613 east exits 6A (Rainbow), 6B (north) and 6C (south)
43.770.382Lake Mead BoulevardSigned as exits 82A (east) and 82B (west/Rainbow Boulevard) northbound
45.272.783 Cheyenne Avenue (SR 574 east)Serves MountainView Hospital
46.875.385Craig Road (SR 573 east)
47.876.990A

US 95 Bus. south (SR 599 south / Rancho Drive)
No southbound entrance; southbound exit is part of exit 91B; former US 95 south
48.578.190BAnn RoadSouthbound exit is part of exit 91B
49.679.891BCentennial Center BoulevardSouthbound exit and entrance
49.780.091A CC 215 (Bruce Woodbury Beltway)Centennial Bowl; CC 215 exit 38; future I-215; system interchange conversion completed on December 4, 2023[67]
49.880.191BBuffalo DriveNorthbound exit and entrance
50.981.9Elkhorn RoadHOV access only; northbound exit and southbound entrance; northern end of HOV lane
51.582.993 Durango DriveServes Centennial Hills Hospital
52.985.195Skye Canyon Park DriveFormerly Horse Drive and Fort Apache Road
54.19387.21596
SR 157 west (Kyle Canyon Road) / Sunstone Parkway Mount Charleston
Diverging diamond interchange; eastern terminus of SR 157


Future I-11 north / US 95 north Tonopah, Reno
Current northern end of US 95 concurrency; current northern terminus
Las Vegas Paiute Indian Reservation57.592.59957Snow Mountain Reservation (Nu-Wav Kaiv Boulevard / Paiute Drive)Proposed interchange upgrade
NyeMercury100.0160.9100Mercury (Mercury Highway)Proposed interchange upgrade; restricted area; serves Nevada National Security Sites
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
Close

See also

References

Related Articles

Wikiwand AI